STONE C WEBSTER MICHIGAN, INC.
P.O. Box 2320. BOSTON. M AssACHusETTs 02107 t
United States Nuclear Regulatory Commission June 10,1983 l
Midland Site Resident Inspection Office Route 7 J.O.
14358 Midland, MI 48640 Ref. MPF 37
,i Attention Mr.
R. Cook RE: DOCKET NO.' 50-329/330 MIDLAND PLANT-UNITS 1 AND 2 INDEPENDENT ASSES 3 MENT OF UNCERPINNING REPORT NO. ~37 A copy of the Indeoendent Assessment of the Underpinning,'deekly Report No.
i l
37 for the period May 29, 1983 through June 4,1983 is enclosed with this l
letter. Included as attachments, are the minutes of the daily meetings held during the week between members'of the Assessment Team and Site Engineering, Construction, and Quality Assurance personnel.
If you have any questions with respect to this re' port, please contact me at (617) 589-2067).
Very truly yours, 4 M A Aasuu A. Stanley Lucks Project Manager Enclosures ASL/pd i
l i
I I
8406130064 840517 PDR FOIA RICE 84-96 PDR k...
=-
J.O. No.
14358 Midland Plant Units 1 and 2 Independent Assessment of Underpinning
)
i Weekly Report No. 37
{
May 29, 1983 through June 4, 1983 Personnel on Site Stone & Webster Michigan, Inc.
S. 1,ucks 6/1 6/2 W. K11ker*
5/31 - 6/4 P. Barry 5/31 - 6/4 A. Scott 5/31 - 6/4 j
Parsons, Brinckerhoff Michigan, Inc.
J. Ratner 5/29 - 6/3 t
i Meetings Attended i
}
Date Represented Purpose I
5/31 Stone & Webster Daily Meetings l
through Bechtel j
6/3 Consumers Power Parsons I
Activities im Construetion -
(
Pier KC11 Drift: The drift layback areas were backfilled with grout and i
I the required drift support modifications were completed.
Pier KC11 Drift: The pier excavation and lagging were installed to a depth j
of 10 ft. No groundwater entered the excavation.
Pier E8: The bell reinforcement and concrete'were installed. Shaft reinforcement installation was initiated.
Pier E6 Drift: The slope layback at the west end of the drift was backfilled with-grout.
Pier E10: Reinforcement and instrumentation installatio'n were completed in
- the. shaft and the shaft concrete was placed.
Piers E9,111 and 12 - These piers were jacked to 110 ogreent of the specified
-load and the wedges checked for tightness. At pier E9 the wedges loosened so that rejacking was required.
Pier KC2 Drift: The drift layback areas were backfilled with grout and the' necessary drift support modifications were completed.
Pier V8: The bell excavation was near completion and steel plates and strut ~
supports were installed.
Pier W10: 'The bell reinforoceent and concrete were installed.
9 p
- Piers W9, 11 and 12 Piers W9 and W11 were cheoked.to verify tightness of i-the wedges under the required jack load. ' Pier W12 was subjected to routine l,-
rejacking to satisfy the deflection limitation criteria.
1 e
,y-t
~swo-
, s o,e.e e ye. e e
s 3 eso n q e-w e s -.m m__
7:
s e
J.O. No.
14358
[, ", -
Midland. Plant j
Units 1 and 2 Independent Assessment of Underpinning 2
J
.SWPS: Work continued on the installation of
_ robes and deep seated benchmarks.
. Quality Control. Documentation and Records:
1.
Observed the verification of wash material quantity associated with a SWPS deep probe.
2.
Observed the field testing of concrete for piers E8 bell and pier
'E10 shaft.
3 Witnessed the QC inspection of concrete pla weent at pier E10.
4.
Witnessed the -QC inspection of Fox-Howlett :oupler torquing at pier W10.
Observa'^tions Construction - Ihe slope layback filling was performed in accordance with tt.e requirements of thesproject documents as was the advancement of the
~ excavation and support of piers W8 and KC11. Reinforcing. steel installations and the concrete placements observed by the Assessment Team conformed to the 1
design requirements.
{
_ uality Control, Documentation and Records - In the opinion of the Assessment Q
g Team,the level of Quality Control on-the referenced field activities met
! O with the intent of the project QA documents.
Design Work Packages-An overview was performed on the design work package on Activating, Maintaining and Operating the SWPS Dewatering System.
' This package as submitted meets 'Oe necess'ary accdracy and adequacy requirements.
Noncomformance Inbentification Reports
' Status of previous issues:
NIR numbers no longer listed have'been closed-out... (Total number of NIRs to date. is 11. )
NIR No.
Description Date-
-(Opened)
(Closed) 6
). Lagging Spacers
.3/21/83,.
6/3/83
~
'T
. Backpacking Material l 4/5/83 6/3/83 in Wet areas-Pice W11
\\
T 8
Load Transfer Method.
4/5/33' 6/3/83
~
ology - Pier E12_
g Y,
s b
N
/d
' Project Engineer a y
Project Manager. '
(D,..
5'.
c.
s e
a
.}_
y-am s
si Q.
T 7
.l.
'~
- f' g ;p N r.,
4
+
- v b3 ~
'. : :. f
_~~ ~ ^?,
-A
'~~l 3
w -:-
T ~~ yl--+
?'aj
.~ -+ ~ -
u.S.
- .p-e
't
~
- t_Qg w c w: n. -
~.
'N m
i j ',,. -
. Notes of Daily Meeting Independent Assessment of-Underpinning 3
Midland Plant' Units 1 & 2 i
(/
Consumers Power' Company
)
Held at Midland Site-Location Midland,-Michigan May 30, 1983 No meeting was held on this date.
s e
I 4
O e
i f
^k
}
.9 I
6
+.:k' s
..]
. -.(
'v r
g I
,-j.',
g y
,g y
- f-
' l'3 q..,
.f w ; a 3
,, y',_ ;;j..
.e., -
3 a
t
,s
=$
4 i'F s - h:
N s4
^
4 t '" _Y m
j.'>v.; g ' y J.
- , ywe,.,'
f
_y x.
y x
e
e
_ I Notes of Daily Mee. Ig Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company
._)
Held at Midland Site Location Midland, Michigan May 31, 1983 Present For:
Consumers Power Bechtel MPQAD Stone & Webster
a J. Fish er R. Sevo M. Blendy 3
J. Ross J. Gaydos i
Parsons J. Ratner Purpose
-l This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
Discussion Item 1 - Construction Aid Guideline.
Ihe Administrative Guidel'ine FIU-1.000 (Construction Aid Procedure) is still I~T being reviewed.
1 Item 2 - Construction Progress.
1 J. Fisher said layback areas will be grouted today in the drift areas to piers liC2, KC11, E8 and W8.
Calculation on laybacks still due at Bechtel from ffanson Engineering en June 3 i
' Item 3 - NIR 6-8 Status.
J. Ratner reported NIR #7 response appears adequate. Will notify.
J. Fisher said'the response to NIR #8 is still in preparation.
J. Ratner reported that he was contacted by E. Burke of MRJD in regards to this matter.
J. Ratner stated that on NIR #6 the Project Management did not accept the present wording. Resolution is required.
Item'4. Fox-Howlett Disassembly. Requirements.
J. Fisher reported that ' discussions are still on-going with Project Engineering.
Item 5 - Pier Bell Bond Breaker Material.
In response to a question regarding the type of bond breaker material required between adjacent. pier bells, it was reported that a DCN has been issued to clarify the requirement.'
~
-
- Items require resolution ~
i (7',)
a
.w.
-i
..i 1.
- =em.
+6.='m.st+*.
f a
M +g=
- WM-
'T***W f*
'*C+*
N+ " * * * " * *"
+
~.
I i
9 l
Notes of Daily Meeting Independent Assessment of Underpinning Midland, Michigan *
'..)
Consumers Power Company Held at the Midland Site Location Midland, Michigan June 1, 1983 Present For:
Consumers Power Bechtel MPQAD Stone & Webster D. Puhalla J. Fisher G. Carpenter W. Kilker J. Schaub M. Blendy A. Scott J. Gaydos Parsons N. Swanberg J. Ratner i
Purpose This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
Discussion Item 1 - Ccnstruction Aid Procedure, h
M. Blendy explained that MPQAD is expected to soon sign the procedure that will allow resident engineering to design and implement specific Construction Aids without having to include the items on the formal project drawings.
I
/'
Item 1 - Grouting of Existing Slope Laybacks.
~
l J. Fisher reported that existing laybacks in the drifts to piers KC2, KC11 j
and at the ends of piers E/W8.were completely grouted as of May 31, 1983 PM.
J. Schaub reported that fulfillment of this activity along with processing the excavation permit should release the E/W8 bulkhead work by the NRC.
' Item 3 - Status of NIRS #6-8.
j N. Swanberg and W. Kilker reported that agreement had been reached on NIRs
- 6 and 7.
With respect NIR #6, the construction procedure on backpacking will be modified to reflect an emphasis on using the maximum size spacer presently allowable as per the specification. NIR #7 will be closed based on the commitment to use a coarser grained backpacking material in areas of seepage.
The project engineering response to NIR #8 has been discussed with the Assessment Team and a resolution is expected shortly.
Item 4 - Fox-Howlett Coupler Inspection.
J.. Fisher stated that in order to comply with ASME requirements l'out of every 100 Fox-Howlett Couplers on pier E10 will be disassembled and inspected..
Item 5 - Fabrication Status.
In reply to a question by W. Kilker, J. Fisher stated that virtually all
-materials necessary to complete piers E/W8, E/W10 and KC2/KC11 have been fabricated. The resolution on a few outstanding' items is -shortly expected.
Item 6 - U.S. Testing Aadit Observations and Findings.
()
J. Fisher reported that the preliminary responses to'the audit findings are due out today and the final resolution is. expected by June 3
.f.
1
- s.... ~..
m.
_~.
.i Notes of Daily Mel ng 1
l Independent Assessment of Underpinning i
Midland, Michigan Consumers Power Company i'
+!
Held at the Midland Site Location Midland, Michigan June 1, 1983 (Page 2)
Item 7 - Use of Dry-Pack.
J. Fisher and J. Schaub explained that there have been recent discussion on the use of dry-pack versus pressure grout in the installation of the upper bearing plates for the permanent underpinning piers. There are still i
concerns over the advisability of switching to a pressure grout for the uoper plate.
W. Kilker said the Assessment Team will not become involved in the decision making process. However, the Team's assessment of the dry-packing done to date by the Underpinning Subcontractor is that the product
?
has been consistently of very good and imiform quality and the chred material fully met the bearing requirements.
1
}
' Items require resolution 1
l
-I
-l t
a k
(.
I a
e O.
-,.,w4
.. A w_,
h._.y 6e E e, 6.-
w a.=
4w%.e,-
.+,,w..
e
,.%ws,,,
.n
--m...--
.. ~ - -, -
.m q
m
- i Notes of Daily Meeting l
Independent Assessment of Underpinning Midland Plant Units 1 & 2
~3 g
Consumers Power Company Held at Midland Site Location Midland, Michigan June 2, 1983 i
Present For:
I Consumers Power Bechtn1 MPQAD Stone & Webster y
3 J. Schaub J. Fisher W. Kilker l
G. Murray J. Gaydos A. Scott i
J. Ross Parsons 1
4 J. Ratner l
l Purpose j
This meeting is held each day to discuss items regarding the Independent Soils t
Assessment at the Midland Plant, Units 1 & 2.
4 Discussion Item 1 - Status of pier E/W8 and E/W10.
J. Fisher provided an update on piers E/W8 and E/W10.
i Item 2 - SWPS - Status of 6 wells.
J. Fisher said the report on the status of the 6 SWPS wells originally drilled to dewater but now under consideration to act as piezometers is due out the week of. June 6.
.i t
4 4
4
.--..wy.-
i,.7., _~ r
--_-~,
,..__.a..
x
q 3
Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 i
Consumers Power Company-m
^
Held at Midland Site Location Midland, Michigan 1
June 3, 1983 i
Present For:
l Consumers Power Bechtel MPQAD Stone & Webster l
G. Murray J. Fisher J. McMaster W. Kilker J. Gaydos A. Scott D. Lavelle f(. Swanberg Parsons J. Ratner j
Purpose l
This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
{
Discussion i
Item 1 - Status of outstanding NIRs.
i J. McMaster and N. Swanberg repbrted that the 3 remaining NIR resolutions i
(N should be processed through Engineering and MPQAD today and forwarded to the Asses:: ment Team.
l l
Item 2 - Fox-Howlett Disassembly Requirements.
i, D. Lavelle said that the change request to the procedure on coupler disassembly requirements will be signed out prior to the next concrete pour to avoid any misunderstanding of intent.
Item 3 - Work Status.
J. Fisher prcvided an update on pier E/W8 and E/W10 status.
Item 4 --Hilti inchor Test Program.
.s J..Gaydos and N. Swanberg stated that the test program iswell underway but will likely require.1-2-more days for completion. Preliminary results are favorable in terms of showing an increased friction coefficient between the-bolts and concreta.
Item 5 - U.S. Testing Audit.
D. Lavelle said that-to his understanding the observation and findings of the CPCo audit are presently being addressed. Resolution of the items is anticipated within a week..
Item 6 - On-Site Project Manager.
D."Lavelle reported that 'C'PCo or Bechtel will be representied on-site each week at the Project Manager level.
' Item 7 - Weekly Working' Level' Review Meeting.
N. Swanberg reported that effective immediately there will be a weekly 1
. working level cesting on Wednesday-involving Ann Arbor Project Engineering and the appropriate site personnel. The purpose of the sessions will'be to' address and resolve existing-issues and to attempt to foresee and address the handling of potential difficulties for the short-term future.
)i
'e n..
Lv.~,,-
---.._.J
,,,a n.
.