STONE & WEBSTER MICHIGAN, INC.
P.O. box 2325. BOSTON. MASSACHUSETTS O2107 i
Mr. J. G. Keppler, Administrator, Region III February 3, 1984 Nuclear Regulatory Comission J.0. No. 14509 799 Roosevelt Road NRC File #84-2-3 Glen Ellyn, Illinois 60137 DOCKET N0. 50-329/330 CIO WEEKLY REPORT NO. 33 ATTACHMENTS MIDLAND PLANT - UNITS 1 AND 2 Please insert the enclosed sheets into Attachment A of Weekly Report Number 33 which was distributed on February 1, 1984.
pJ. E. Karr
~
~
CIO Program Manager Enclosures JJR/nl cc:
JJHarrison, US NRC Glen Ellyn, Il s RJCook, US NRC Midland (site)
DLQuamme, CPCo Midland (site) i RAWells, CPCo Midland (site) l RBKelly, SWEC RG8 urns, SWEC APAmoruso, SWEC i
I FEB 13 gg4 8406120279 840517 PDR FOIA RICE 84-96 PDR
b
( identifies changes from previous report STONE & WEBSTER HICillGAN, INC.
NOTES:
1.
CONSTRUCTION IMPLEMENTATION OVERVIEW 2.
Closed items will be identified in the report for the MIDLAND NUCLEAR C0 GENERATION PLANT week of closure and dropped from further reporting CIO ITEM SUM ARY Classifi-Open CPCo Response Closed No.
Description i Document /Date Document /Date Document /Date Remads cation 030 Tracked Need to review Vendor Equipment Report No. 5 Action Verification Program - HPQAD/SHQ 7/18/83 032 Tracked NIR 006 issued on October 27, 1983 Report No. 20 Action to address administrative discrepan-10/31/83 cies in the Construction Training Records of Teams 5',
6, 8, 9. 12, 13, 16, 17, 19, 20, 25, 25 (27/28) 29, 30, 31, 32/33 and Bild staff.
i 033 Tracked NIR 007 issued on November 7, 1983, Report No. 21 Action to address administrative discrepan-
, 11/08/83 cies in the Construction Training Records for Teams No. 24, Field Pro-curement, Subcontractor Management.
Field Engineering Staff, and Con-
' ')
struction General Services Organi-zation.
034 Tracked NIR 008 issued on November 14, 1983 Report No. 22 k k Action to address upgrading five training
_11/14/83 8 5 level codes in the System Team i <
Training Matrix.
@ F
" 8
.i u
~
~
]
i CIO ITEM SUFI4ARY - C0llIlituATION SilEET Classifi-Open CPCo Response Closed Ho.
cation Description Document /Date Document /Date Document /Date Renarks 035 Iracked CIO observed that dielectric iso-Report No. 22 Action lation spacers for galvanic pro-11/14/83 tection of copper pipe to galvanized,
steel pipe supports were missing in some arcas on the Small Bore (Instru-ment Air) KAC System, drawing FSK-J 30-0220 Sheet 2, Rev. 7.
<(
l 037 Tracked CIO observed that two boards with Report No. 24 Action protruding nails lying in Cable Tray 11/29/83 1AKA019 (Q Tray) had punctured the As revised by cable jacket cf a "Q" cable. The
. Report No. 25 cable is Q-channel A, 480V, MCC.
12/5/83 NCR C00925 was issued by MPQAD on November 22, 1983. CIO will track this item to assure that corrc;tive action (repair) has been performed to approved procedures.-
a 041 Tracked CIO. requires CPCo plans and schedules Item Notifi-Infor-for assuring that current activities cation Report mation relative to the evaluation of Phase 1/6/84 III activities on FCRs/FCNs, vendor drawings and FSKs are completed prior 3, c to releasing the emergency diesel g ;
generators for resumption of instal-g T.
I lation work. Subsequent to review, g' <
CIO will determine method of evalu-ation.
g y g
l e-
> 3 5
. l O
STONE & WEBSTER MICHIGAN. INC.
i P.O. Box 2325. DostoN. M AssAcHuscTTs 02107 t
1 I
I i
i i
l i
I i-Mr. D. L. Quamme February 3, 1994 l
Consumers Power Company l
Midland Nuclear Plant 3500 E. Miller Road Midland, Michigan 48640
+
Subject:
Docket No. 50-329/330 Midland Plant - Units 1 and 2 Overview of the Construction Completion Program Serial No. SWMCP-024 Re:
CIO Item No. 037 NCR C-00994
. CPCo Transmittal No. CSC-7244 CIO has reviewed CPCo's response to Item Number 037 and considers the disposition to be satisfactory.
CIO will verify testing repairs (if necessary) and requests sufficient prior notice to perform these activities.
{ bef
.> 1/
J.
- . arr CIO Program Manager FB/nl cc:
t JGKeppler, US NRC Glen Ellyn, IL JJHarrison, US NRC Glen Ellyn, IL j
-4JCook, US NRC Midland (site).
RAWells, CPCo Midland (site)
RBKelly, S&W
/#Amoruso. S&W i
i l
MD 131834 w
%w
-ne-y-a-
-e r
^r-
-mu-gN 4
r L
i
)
J STONE & WEssTER MICHIGAN. INC.
[
/u i
P.O Box 2325. Boston. M ASS ACHUSETTS O2107 f
i l
Mr. D. L. Quamme February 3, 1984 i
Consumers Power Company l
Midland Nuclear Plant 3500 E. Miller Road l
Midland, Michigan 48640
Subject:
Docket No. 50-329/330 l
Midland Plant - Units 1 and 2 l
Overview of the Construction Completion Program Serial No. SWMCP-025 Re:
Revisions to BPCo Procedures CPCo Transmittal No. CSC-7216 CIO has reviewed CPCo's response to Meeting Note "D" on Page Two of Weekly Report Number 25 and considers this to be satisfactory.
f.W W J. E.
arr CIO Program Manager FB/nl i
i cc:
l JGKeppler, US NRC Glen Ellyn, IL JJHarrison, US NRC Glen Ellyn, IL
{
M JCook, US NRC Midland (site)
RAWells, CPCo Midland (site) l RBKelly, S&W l
APAmoruso, S&W I
l l
l t
22132.)
1.
)
r
['
L-
<~
STONE & WEBSTER MICHIGAN, INC.
A P.O. box 2325. BOSTON. MASSACHUSETTS 02107 I
Mr. D. L. Quamme January 30, 1984 Consumers Power Company Midland Nuclear Plant
[< PRINCIPAL STAFF 3500 E. Miller Road V3A h
OPRP Midland, Michigan 48640 1/aA DE j
@/R/,
DRMSF i
Subject:
Docket No. 50-329/330
/ac
/uDfDIA Midland Plant - Units 1 and 2 960 scs v
%+3 Overview of the Construction
,ssA x.L i
9 0
Completion Program l'iU F '
File W.J -
Serial No. SWMCP-023
~
Re:
Partial Release of Mechanical Documents Transmittal No. CSC 7251 Transmittal Number CSC 7251 refers to a request for partial release of seven mechanical documents to allow a pneumatic test.
CIO has no objection to this request providing CIO is allowed to review the seven documents for the following attributes.
- 1) Clear indication on each drawing that the distribution is li'alted to one time, one application I
- 2) Objective evidence that attachment FCNs/FCRs are j
correctly posted
- 3) FDDL is updated to reflect the issue
- 4) Drawings are current revision
- 5) @ status is verified
- 6) Manufacturer's instructions are available Please notify the undersigned when the documents are ready for CIO review.
Wf&
j
/J.E.Karr CIO Program Manager FB/nl CC:
-JGKeppler, US flRC Glen Ellyn, IL JJHarrison, US NRC Glen Ellyn, IL RJCook, US f4RC Midland (site)
RAWells, CPCo Midland (site)
{
RBKelly, SSW APAmoruso. S&W 70 6 g h0 LO %Q
~.
~,
STONE & WEBSTER MICHIGAN, INC.
P.O. Box 2325. Boston. M AssAcHusETTs 02107. Pal!!CIPAL STAFF t-n-uy Ql r' *
, h 4/Ma
(;c.* 5 4c
- f. ',.
]
M:. J. J. Harrison January 27, 1984 Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
DOCKET NO. 50-329/330 MIDLAND NUCLEAR C0 GENERATION PLANT RESUMES AND AFFIDAVITS FOR CIO STAFF MEMBERS SERIAL NO. SWMCP-022 Attached is the signed offidavit and resume for Mr. A. J. Benecchi.
Mr. Benecchi has been assigned to assist in headquarters' support of CIO activities.
bY
<d
- . E. Karr CIO Program Manager Enclosures JJR/nl cc: CIO General Files 1
I I.
D;JL t
ste u
1 11.3
1 e
o
.i I~
i PREVIOUS WORK ASSOCIATED WITH MIDLAND PROJECT Consumers Power Company - Midland Spare Parts Determination Project -
February 1980.
Provided evaluation and assistance in implementing the SWEC QA Program on the Spara Parts Determination Project.
-LIST OF FUNDS Stone & Webster Employee Investment Plan Stone & Webster Employee Stock Ownership Plan
' l l
Fidelity Cash Reserves Money Market Fund Patriot Money Market Account i
1 4
1 e
i 4
l n
f i
1 t
y s-
.,.-yw
)
t' i
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket No. 50-329 OM CONSUMERS POWER COMPANY 50-330 OM (Midland Plant,, Units 1 and 2)
Docket No. 50-329 OL 50-330 OL g
j AFFIDAVIT OF Alan J. Benecchi i
t l
My name is Alan J. Benecchi. I an employed by Stone & Webster Michigan.
Inc.
as Administrative Assistant.
1 I am currently assigned to the team which is proposed to conduct a Third Party Construction Implementation Overview at the Midland Nuclear Plant site. Prior to being given this assignment, I have never worked on any job or task associated with the Midland Project, or any job or task for j
or on behalf of Consumers Power Company or Bechtel relating to issues that I will be reviewing. Work that I have previously participated in is attached.
I have never been employed by Consumers Power Company or Sechtel. I do not own any shares of Consumers Power Company or Bechtel stock. Hutual funds or other funds in which I may have a beneficial
.l interest, but over which I have no control, may own shares of Consumers Power Company or Bechtel stock, of which I an unaware. A list of such funds in which I have an interest are attached.
I have no relatives which are or have been employed by Consumers Power Company or Bechtel.
Signed 4
Suffolk, ss Commenvealth of Massachusetts Sworn and Subscribed Before Me This 22nd Day of November 1983.
}RY JrA%u
-' NOTARY PUBLIC /
/
My Comunission Expirest [1A.,. m.I //, //fd 1
J
- +
.o.--,,
a
+
=
w
.ie, e
y-
-)
Noven e, 1983 BENECCHI, ALAN J.
ENGINEERING ASSURANCE ENGINEER ENGINEERING ASSURANCE DIVISION
)
EDUCATION Tufts University - Bachelor or Science, Electrical Engineering 1970 University of New Haven - Master of Engineering 1977 LICENSES AND REGISTRATIONS Mr. Benecchi has 12 years experience in the engineering industry.
Currently as Engineering Assurance Engineer in the Engineering Assurance Project Support Group assigned to the Operai: ions Services Division, he provides guidance on and assists in the implementation of the Stone & Webster Engineering Corporation Quality j
Assurance Program as it applies to engineering and design activities.
Since joining Stone & Webster Engineering Corporation (SWEC) in December 1977, he has been assigned to the Engineering Assurance Division Procurement Control Procedures Group as an Engineer.
Special assignments have included review of Beaver Valley Unit 2 ASME III Component Design Specifications for compliance to ASME III requirements; Member of the SWEC team at Clinton Power Station evaluating construction, quality assurance and engineering / design activities; Engineering Department Coordinator for engineering assurance and quality assurance matters for the Independent Design Review of Shoreham; Engineering Department Coordinator for NRC inspections of SWEC; the historical development of the Engineering Assurance Program as it specifically affects pipe stress / supports for Beaver Valley Unit 1; auditor for a Pipe Stress / Supports ' Reevaluation Task Force.
Prior to joining SWEC, Mr. Benecchi was a Senior Engineer with General Dynamics Corporation Electric Boat Division.
He gained broad design and procurement
?
experience while involved with the development of the TRIDENT nuclear submarine.
PROFESSIONAL AFFILIATIONS j
j American Society for Quality Control - Member Institute of Electrical and Electronics Engineers - Member 1
I l
1 "V
ye--
w
,r
n 9
DETAILED EXPERIENCE RECORD BENECCHI, ALAN J.
05645 STONE & WEBSTER ENGINEERING CORPORATION, BOSTON MA (Dec 1977 to Present)
I Appointments:
Engineering Assurance Engineer - Feb 1980 Engineer - Dec 1977 Engineerina Assurance Division Project Support Group (Dec 1979 to Present)
As ENGINEERING ASSURANCE ENGINEER, assigned to the Operations Services Division (OSD) Headquarters an'd Special Projects, responsible for:
Coordinating engineering assurance activities and services for OSD Headquarters and Special Projects.
Monitoring and evaluating OSD and project engineering and design activities l
and providing suggestions for problem resolution.
?
Assisting OSD and project personnel with proper interpretation of Engineering Department procedures, and assisting in the preparation of requests for deviations from Engineering Department procedures.
Ensuring that project activities and instructions are compatible with client and SWEC QA Programs for engineering and design activities.
Reviewing OSD and project procedures for compliance and consistency with Engineering Department.
Corporate, and other industry or government standards.
4 Providing informal training, and scheduling formal training classes with Engineering Assurance Continuing Education Group.
Assisting in the preparation of responses to audit findings related to engineering and design activities.
Additional special assignments include:
Special review of Beaver Valley Unit 2 ASME III component design specifications to assess whether they comply with the requirements of ASME III.
1 Member of the SWEC evaluation team at Clinton Power Station.
Specific responsibilities included:
o Coordination of SWEC engineering involvement in the Overinspection Program.
o Development of a design completion control program.
1 i
o Evaluation of site control of supplier documents.
1 m
=,,
.. - ~
w
e-i q
AJE 3
1 Engineering Department Coordinator for Engineering Assurance and Quality i
Assurance matters for the Independent Design Review of Shorehas by Teledyne i
Engineering Services.
An Engineering Department Coordinator for NRC inspections of SWEC.
Historical development of the Engineering Assurance Program as it 1
j specifically affects pipe stress and supports for Beaver Valley Unit 1 and Engineering Department Coordinator for an evaluation of the Beaver Valley Unit 1 design and analysis of piping by O'Donnell & Associates. Inc. for i
Duquesne Light Company.
i' Certified as Quality Engineer by the American Society of Quality Control (December 1979).
f Special Task Force for Pipe Stress / Supports Reevaluation (Mar 1979 - Dec 1979) i As ENGINEER assigned to the Special Task Force for Pipe Stress / Supports Reevaluation for Beaver Valley Unit 1. Surry Units 1 and 2, James A. FitzPatrick, and Maine Yankee Power Stations; responsibilities included the followingt i
l Performing technical end programmatic audits of manual and computerized calculations generated during the Pipe Stress / Supports Reevaluation.
t l
Procedure development for controlling the quality of the engineering and l
design effort for the task.
t Certified as Lead Auditor - Engineering Assurance Division (September 1979).
Engineering Assurance Division. Procurement Centrol Procedures Group j
(Dec 1977 - Mar 1979) l As DIVISION COORDINATOR (Apr 1978 - Mar 1979) for the Engineering Department Policies and Procedures (EDPP) Program, responsible fort l
l The coordination of Division activities for the preparation and development of EDPPs.
j Assistance in scheduling work, assignment of manpower for EDPP preparation, and establishing priority levels for EDPP development.
Input to, review, and comment on EDPPs during and af ter preparation to l
ensure consistency with Quality Assurance requirements and Engineering i
Department goals and objectives.
I Preparation of EDPPs as required.
Participation in comment resolution meetings for EDPPs reviewed by Engineering Management.
1 2
I
4 3
]
AJE u
i Apr 1978) under direction of the Supervisor, As ENGINEER (Dec 1977 j.
responsibilities included Preparation, review, and revision of Engineering Assurance Procedures and j
the Specification Preparation Manual.
i Handling of project and divisional requests for interpretation of a
}
deviation from Engineering Assurance Procedures.
Study and implementation of SWEC Quality Assurance procedures and Code of Federal Regulations 10CFR50 Quality Assurance criteria.
l Development of method for documentation of comments and changes to NSSS supplier drawings and a method for changing subvendor drawings.
GENF*M DYNAMICS CORPORATION /wm TRIC BOAT DIVISION. GROTON. CT (Mar 1971 - Oct 1977) l TRIDENT Desian Project (Feb 1975 - Oct 1977) 4 i
j As SENIOR ENGINEER, responsible for coordination and development of subvendor equipment.
Included preparation of specifications and review of equipment test j
procedures and results to ensure conformance with specifications and delivery j
schedules.
As LEAD ENGINEER, responsible for installation and system interconnection of
{
reactor plant equipment at the TRIDENT Training Facility in Bangor, Washington.
1 i
{
As COGNIZANT ENGINEER, responsible for development of both reactor plant and j
secondary plant instrumentation, monitoring, and indication systems.
+
i i
Responsible for review of reactor plant equipment specifications and functional requirements, system signal integration, and technical support to draf ting for j
preparation of final system interconnection drawings.
1 i
l S5W and Commissioned vessels Desian Project (Nov 1971 - Feb 1975) 4 4
1 Appointed as nuclear PROJECT ENGINEER, responsible for updating reactor plant i
systems with new design modifications.
Included development of system requirements and directions for modifying equipment.
l l
Member of the Electrical / Electronic Installations Cosunittee.
Responsible for establishing standards for installation of equipment onboard submarines.
Nuclear Test (Mar 1971 - Nov 1971)
Appointed as TEST ENGINEER (Mar 1971) i As TEST ENGINEER, responsible for testing reactor plant systems af ter completion of the construction phase.
l
}
l 3
I
't i
i
.. -, _ _, - _. _ ~ _ _ _ _ - -
.., -.... ~.,, _. - - _ _ _
~
m.
~
STONE & WEBSTER M!CHIGAN, I df N-FW
~ I,W -
P.O. Box 2325. BOSTON. M AS5ACHUSETTs O2107 w,
[-
3 c/
~
- o ISGA stL A1 T:F iFi le IdLi s
s Mr. D. L. Quamme January 27, 1984 Consumers Power Company liidland Nuclear Pl' ant 3500 E. Miller Road Midland, Michigan 48640
' Subj ect: Docket No. 50-329/330 Midland-Plant - Units 1 and 2 Overview of the Construction Completion Program s.
Serial No. SWMCP-018 s
s s
.s
\\ Re:
Transmittal No. CSC 7208 FCR/FCN Review Schedule i
With reference tesyour transmittal dated January 20, 1984, the following response is offered.
CIO activities are dependent upon receipt of registers from Document
,Contrul, time ~ required for preparation of sample plans ~and assignment of personnel.
- ..s These 1.ireparatory activities (can usually be comoleted in one workday so that'CIO will be ready'tn' commence reviews wichin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of
',' receipt of registers. CIO reviews are usually completed within a day or two thereafter.
Iffietherinformationisregriredhplease.contactus.
i
\\ ;' ghs..
,3
, i J. E. Karr.
t
'fCIO Program Ma' nager I.
t
.x JEK/ni'.
.. C'C N s
l JGKeppler, UL NRCsGlen.Ellyn, IL t
I JJHarrison, US NRC Gibn Elly'n, IL RJCook, US. MtC Midland Tsite)
(u*\\
RAWils, CFCo Mf dtand ~(site)J '.
2 s
.i RBKelly APk. tor.20,t S&W <
J
.\\ SSW s*
t
. 4 I
4 s
y (
1 FEB 1 1984 m
., [
+
s f
l a
~3
- r, v o 3 y
- z. k,
.