M
~.
STONE 6 WEBSTER ENGINEERING CORPORATION 245 SUMMER STREET, BOSTON. M ASS ACHUSETTS ADDRESS ALL CORRESPONDENCE TO P.O. SOX 2325. SOSTON. M ASS. 02107 W U TELEX 94 0001 N
Onst C N.74WCTIO*e "C*"LO.
""'JtT0.
- "t%n".*,..
"w.".'.Iil'are."O C United States Nuclear Regulatory Commission November 15, 1982 Midland Site Resident Inspection Office Route 7 J.O.No. 14358 Midland, MI 48640 Ref. MPF-8 Attention Mr. R. Cook RE: DOCKET NO. 50-329/330 IDEPENDENT ASSESSMENT OF AUXILIARY BUILDING UNDERPINNING REPORT NO. 8 A copy of the Independent Assessment of the Auxiliary Building Under-pinning Weekly Report No. 8 for the period November 7 through November 13, 1982, is enclosed with this letter.
If you have any questions with respect to this report, please contact me at (617) 589-2067.
f.<)[b I hsl A. Stanley Lucks Project Manager Enclosure ASL:nb G406120252 840517 PDR FOIA RICE 84-96 PDR NOV 19 sg2
J.O. No. 14358 s
2 Midland Plant thit 1 and 2 Independent Assessment Auxiliary Building thderpinning Weekly Report No. 8 November 7 through November 13, 1982 Personnel on Site Stone & Webster. Digineering Corporation (SWEC)
A.B. Scott 11/8 - 11/12 A.S. Lucks 11/10 Parsons, Brinckerhoff, Quade & Douglas (PBQD)
W. Parish 11/9 F. Balsamo 11/9 - 11/11 Activities The testing of mudmat mix designs was monitored at the concrete test facility. Sie mixes were designed to achieve 300 psi compressive strength within three (3) hours.
Cleaning and thread protection work on reinforcing steel was observed at the Pbseyville Yard storage area.
Attended QC Training sessions en Welding and Excavation and Lagging.
Meetings Attended Date Represented Purpose 11/8 Stone & k'ebster Daily Meeting through Paraons, Brinckerhoff 11/12 Qiade & Douglas Consumers Power Bechtel i
11/12 Stone & Webster Weekly Soils Review Consumers Power Meeting Bechtel Wrgentime Observations At this time the mudmat-mix designs have not achieved the goal of 300 psi in three hours.
Reinforcing steel was being thoroughly cleaned and the thread protection
J.O. No. 14358 s
- Midland Plant
- Units 1 and 2 Independent Assessment Auxiliary Building Underpinning was a significant improvement over the previously used plastic mesh sleeve in that corrosion of threads is also prevented.
en k5h bk WAL (f
Project Engineer Project M, nager i
o
!