Forwards Summaries of Vendor 800117,0227 & 0730 Ltrs Re Plant Fill
ML20091L191
Person / Time
Site: Midland
Issue date: 09/02/1980
From: Bates J
ROCKWELL INTERNATIONAL CORP.
To: Bosnak R
Office of Nuclear Reactor Regulation
Shared Package
ML17198A223 List: ... further results
References
CON-BOX-01, CON-BOX-1, CON-BOX-13, FOIA-84-96 80ETEC-DRF-3747, NUDOCS 8406070369
Download: ML20091L191 (4)


Text

.

~,.

Energy Technology Engmeering Center Energy Systems Group P O. Box 1449

\\

Canoga Park, CA 91304 (213)341.'

Rockwell operated for U.s. Department of Energy Inteinational i

September 2, 1980 80ETEC-DRF-3747 Mr. R. J. Bosnak, Chief Mechanical Engineering Branch Division of Engineering U. S. Nuclear Regulatory Commission Washingten, D. C.

20555

Subject:

Summary of Documents Submitted to NRC by ETEC Concerning The Midland Plant Units 1 and 2

References:

1) Ltr 80-ETEC-DRF-0123, " Review of Response to 10 CFR 50.54 Request on Plant Fill for Midland Plant, Units 1 and 2",

J. O. Bates to A. J. Cappucci, January 17, 1980

2) Ltr 80-ETEC-DRF-0650, "ETEC Review of Draft MEB SER for Midland Plant Units 1 and 2",

J. O. Bates to R. J. Bosnak, February 27, 1980

3) Ltr 80-ETEC-DRF-3195, " Review of Underground Utilities t

Section of ' Interagency Agreement No. NRC-03-79-167, Task No.1 - Midland Plant Units 1 and 2, Subtask No. l-Letter Report'", J. O. Bates to A. J. Cappucci, July 30, 1980

Dear Mr. Bosnak:

Per the request of Mr. A. J. Cappucci, Jr. summaries of the documents sub-mitted by ETEC to NRC - MEB concerning the Midland Plant Units 1 and 2 are enclosed. The documents submitted are References 1 through 3 listed above.

Sincerely yours, ul J. O. 8 es, Program Manager Energy Programs Office Energy Technology Engineering Center Enclosure As Noted cc w/ encl.:

H. L. Brammer - NRC A. J. Cappucci-NRC

]

gh k N 6%69 OON

)lI' DR RICE 04-96

~

tr closure to: -uu-titt,-twt-;/4/

m September 2,1980 Page 1 m

~

SUMMARY

OF DOCUMENTS SUBMITTED TO NRC BY ETEC CONCER*11NG THE MIDLAND PLANT. UNITS' 1 AND 2 Reference 1 This is a revie&of Consumer Pr er Company responses to Questions 16-200f the NRC 10 CFR 50.54(f) ReYision 2 dated July 9,1979.

These questions concerned the effect of. the plant fill settlement

m the. underground piping.

In the revigw. concern was gxpressed over the following items:

/

a)--Buckling' or crippling were 'not considered as failure modes. / '.

-)

The stfesses9Bre based on the current pipeirofiles b

s-a and not the expected differentf.al-settlement over the L

~ #

life of the plant./

c) The m,ethod outlined for calculating the str'sses in-e

.p..

I the deformed p,ip'ing was 'not particularly applicable

.,for the profiled pJping.j', g /

-w f.),'What is'th b /done if strisges-aporcich or exceed., code allowables. ' / j ; O

,5s n;

- e),The differurit'ial/settlemedf bitiaen piping'and building,,

g at areas of pen,etration.

'f

/

f) Theadd,itional-loadingthatmaybeimposedonactive p

.e components due to differ,enttal settle' ment.

~

p b~. :/x, g.

L SOMofthesesameconcernsyereaha'inexpress,edinReferen.ce3 based cn latter revisions to' Consumers Poner Cor% ny responses, gf"'

r,..

f-

/

'~

D y

Reference 2

~7he draft Safety Evaluation Reportspr,epared by the NRC'- MEB Staff b5% d on the Midland,1 and 2 F FS,th,m u. ngn.4 vision 21Wwre'/few

s -

c.~,

~

- It was found to be current with"Nspec.t, to'the-FSAR with no changes

/

.s being,; required at the tinc. / f.(,

' ',, 4

/

29e, <v m

x a.

limajor remaining,uahsofved issues' Werey;;~A i

,1

,JV

71) J AsymrretVig cavif,y pressurizaticm; *'4(.

mg 1 t-

/

i y

~

i

~3)wThe effect of buildinPsettlementh upon'mecht.nical components.

~

~

i I :,

-[ 3) Seismic qilblification' ofrewajical'and electrical equirment.

ar

. mv j-4) Thecamp,litionofthetonfi,rm;torytanalysisi o

(~

m.n s

x

'N f

j

.e.

f **

e I

w m,?

  • / **

fI M[

f, ?

v.

yf

&Sf'!

i y

4

-Enclosure to: 80-ETEC-DRF-3747 September 2, 1980 Page 2 Reference 3 Section g of the referenced report was reviewed and in general ETEC concurred with the concerns expressed therein. A summary of our comments follow:

a) Methods of measuring in-situ stresses in the pipes should be investigated.

b) Based on an elastic analysis, our calculations show maximum stresses as high as 212,000 psi in the buried i

pipe whereas the maximum stress calculated by CPC is 27,000 psi. These stresses are bending stresses based on the pipe profiles.

c) Stresses other than bending stresses are also of con-cern. The external crushing. loads required to cause the pipe to deform with a relatively sharp radius of curvature, as shown in some areas of the profiled pipes, will be high. This could induce high stresses-and local crippling.

d) Local crippling can also occur due to the high bending 5

stresses *, sudden changes in slope such as at building penetrations, attachments to heavy equipment and sharp dips in the pipe profile.

i i

l

s Distribution ETEC LE' ITER REVIDi RECORD m

Adler, KL Granger, RA

_Zweig, HR

_Akamine, KS

_ Hall, J

_ Zweng, DJ Prepared by: J.M. Rrarmor(J.O. Rate

_ Anderson, WG Haroldsen, 00 X Wieseneck, HC

_Archbold, P Hinze, RB X Brammer, JM Typed by:

Cecilia Atz, RW Hoffman, NJ

[Auge,LJ

_Holwager, TL Addressee: Mr. R. J. Bosnak - NRC

^

Baker, RS Homer, RS

~

~

WX/Ltr No.:

80 ETEC-DRF-3747 Balkwill, JK Hutmacher, ES

_ Barber, HE

_ Ingle, WB Date:

8 September 2.,e980

_Barrett, EM

_Jassak, RM

~X Bates, JO Johnson, Ron'A DOE i.ead Branch:

_Bierfreund, AI Karwowski, A Boise, MW Kern, AO

_ Bryan, RL

_Klea, JA Completes action int DRF-

~Budney, GS Klein, A Burns, WE Larson, DA

Subject:

Summary of Documents Submi Leppard, JA ted to NRC by ETEC Concerning The

~ Campbell, DR

~ Mantle, JG Midland Plant Units 1 and 2 Carpenter, DM JChen, WP

_Marrazzo, NA Cleveland, JR McCarty, JW Req. action

_ ETEC _ Other _No

_Cochran, JC McDowell, MW Remarks:

_Copeland, LB

_Meyer, JH j

Cox, FJ Miller, AE Cusimano, S Miller, NJ

[Cygan,R

_ Naish, RK Rev./

i,

_Darley, DK

_Neely, HH Department / Unit Appr.

Signature j Davis, KA Nicholson, JO DeBear, WS Olson, PS i

DeMuri, RJ Parks, JC Vice Prasident

_y

/

DeVita, V Penman, RB

/

~_DeWitt, HW

[ Peters, WL Mgr, Facil. Des.

X m 4

~

DeZotell, ML Pilling, BS

_Dewart, WG

_Polino, DL igr, Stress X

_Donohue, HF Poucher, FW

_ Douglas, RE Roberts, JK Mgr, Test Eng.

T Drazich, NH Rock, WF

]Droher,JJ

_ Schmidt, GL E

_ Eichelberger,R. 1 Schnuestein, RE _

_ Fenton, RE

_Shinnaman, S Mgr, QA E

_ Ervin, G

_ Shepard, RC r

_Ferguson, E

_Skogstad, L Mgr, Construct.

Fischer, BE Soucy, RC Fletcher, FL Stafford, KT

~

_Forster, EG

_ Stearns, JD Mge, Tech. Serv.

Freede, WJ Sturtevant, WC _

Mgr, Operations j

Garland, MD Tabor, W

_Gaylord, GG Tessier, MJ A/C Coordinator Prog /Proj Mgmt X

_ Gilder, T*.,

_ Thompson, EG x DRF Control g

_ Gillies, BB Twa, GJ Library Other E

W

_ agner, RK

_ Prog. Adm. (SS) q f)

_Glumace, RJ

_ eigand, MA

_ Purchasing (SS)

J. M. Brai:mer X

. fyTo

_Goggin, DE W

_Gould, MI Werth, RL Safety (SS)

(('

_ iese, RW x With enclosure V

_Graner, SG W

FORM 735 A.174 REV S-79

  • . s.

Energy Technology Engmoering i n ter Energy System - mp P O. Bc,4 449 c7 Canoga Park CA 91304 (2131 341-1 Rockwell operated for V S. Depanment of Energy International October 1, 1980 80ETEC-DRF-4220 fir. R. J. Bosnak, Chief Mechanical Engineering Branch Division of Engineering U. S. Nuclear Regulatory Comission Washington, D. C.

20555

Subject:

Midland Plant Units 1 & 2: Bending Stresses in Underground Piping Due to Differential Soil Settlement

Reference:

" Responses to the NRC 10 CFR 50.54(f) Request Regarding Plant Fill For Midland Plant Units 1 & 2, Consumer Power Company, Docket Numbers 50-329 and 50-330",Rev. 6, April 1,1980

Dear Mr. Bosnak:

Enclosed are 7 copies of the ETEC stress analysis of several of the under-ground pipe lines as profiled in the reference. All the copies are being sent to your office per the instructions of Mr. A. J. Cappucci.

Sincerely yours,

,)

J. O. Bafe~s," Program Manager Energy Programs Office Energy Technology Engineering Center Enclosures As Noted cc w/o encls.:

H. L. Brammer, NRC A. J. Cappucci, NRC f ' p, S' pf W I n n 7^ b n C.

i

~

~ n~n b

// //[l i

1

~

Distribution ETEC LETTER REVIEH RECORD m

Adler, KL Granger, RA

_ Zweig, HR

_Akamine, KS Hall, J

weng, DJ Prepared by:J.M. Brammer (J.0. Bates Anderson, WG Haraldsen, 00

~

~

~X Wieseneck. HC Archbold, P Hinze, RB

_x_ Brammer, JM Typed by:

Cecilia Atz, RW Hoffman, NJ

~

.)LAu9e, IJ

_Holwager, TL Addressee: Mr. R. J. Bosnak - NRC Baker, RS Homer, RS

[Balkwill, JK Hutmacher, ES

]

TWX/Ltr No.:

80 ETEC-DRF-4220

~

_ Barber, HE

~ Ingle, WB

_Barrett, EM

~

]

Date: October I,1980

_Jassak, RM

_)LBates, JO

_ Johnson, Ron A _

DOE Lead Branch

_Bierfreund, AI _Karwowski, A Boise, MW Kern, AO

[ Bryan,RL Klea, JA Cbepletes action in:

DRF-

~

~Klein, A Budney, GS

~

Burns, WE Larson, DA subject: Midland Plant Units 1 & 2:

_ Campbell, DR

_ Leppard, JA 3ending Stresses in Underground Pip-

_ Carpenter, DM

_ Mantle, JG ina Due to Differential Soil Settlemt J Chen, WP /

_Marrazzo, MA

_cieveland, JR

_McCarty, JW Beq. action

_RE __Other _ Hone

_Cochran, JC

_McDowell, NW

_Copeland, LB

_Meyer, JH Remarks:

Cox, FJ Miller, AE

_Cusimano, S Miller, NJ

_Cygan, R Naish, RK

_ Darley, DK

_Neely, HH Rev./

Davis, KA Nicholson, JO Department / Unit Appr.

Signature DeBear, WS Olson, PS DeMurl, RJ Parks, JC Vice President

/pg DeVita, V Penman, RB

~DeWitt, HW Peters, WL Mgr, Facil. Des.

X A

s.

DeZotell, ML Pilling, BS

~

Mgr, Stress X

Dewart, WG Polino, DL

_Donohue, HF Poucher, EW

_ Douglas, RE

_ Roberts, JK Mgr, Test Eng.

Drazich, NH Rock, hT Droher, JJ Schmidt, GL

_ Eichelberger,RL,jLSchnuestein, RE _

_ Ervin, G

_ Shepard, RC Mgr, QA Fenton, RE Shinnaman, S

_Ferguson, E

_Skogatad, L MJr, Construct.

Fischer, BE Soucy, RC

_ Fletcher, FL

_Stafford, KT Mgr, Tech. Serv.

Forster, EG Stearns, JD j

/

Freede, WJ Sturtevant, WC Mgr, Operations n./

Garland, MD Tabor, W

_Gaylord, GG Tessier, MJ A/C Coordinator Prog /Proj Mgat X

_ Gilder, TE

_ Thompson, EG x DRF Control

_ Gillies, BB Twa, GJ Library Other

_ agner, RK

_ Prog. Adm. (SS)

[

W

_Glumace, RJ

/

y% e tM

_ eigand, MA

_ Purchasing (SS)

J. M. Brammer X

_Goggin, DE W

1 i

Gould, MI Werth, RL Safety (SS) r-Graner, SG Wiese, RW x With enclosure I

D OLL&t 735-A*174 ilk.V 8-79

fr M

o Energy Technology Engineering Center Energy Systems Group P.O. Box 1449 L

  • ^

Canoga Park, CA 91304 m

(213)341 1 Rockwell operated for U.S. Department of Energy lnternational October 6,1980 80ETEC-DRF-4264 Mr. R. J. Bosnak, Chief Mechanical Engineering Branch Division of Engineering U. S. Nuclear Regulatory Comission Washington, D. C.

20555

Subject:

Midland Plant Units 1 & 2: Sumary of Conference Call of September 8,1980 Regarding Soil Settlement Problem

References:

1) NRC Letter, Docket 50-539/330, "Sumary of January 16, 1980 Meeting on Supplemental Requests Regarding Plant Fill", D. S. Hood, February 4, 1980
2) 'ETEC Letter 80ETEC-DRF-0123, " Review of Response to 10 CFR 50.54 Request on Plant Fill for Midland Plant, Units 1 and 2", J. O. Bates to A. J. Cappucci, January 17, 1980

Dear Mr. Bosnak:

Enclosed for record purposes is a summary of the subject conference call between the NRC, ETEC and Consumers Power Compcny and their consultants regarding the coment items contained in Enclosure 3 of Reference 1.

These items were based on the ETEC comments of Reference 2 and pertain to the effects of soil settlement on buried piping for the subject plant.

Sincerely yours,

,_ W '

J. O. Bates, Program Manager Energy Programs Office Energy Technology Engineering Center Enclosures As Noted cc:

H. L. Bramer, NRC A. J. Cappucci, hRC

.C

, e,

_ O,.

1ni /

A ft' L B U lv WUJ J lCL)

/ 2/f/

Enclosure to: 80ETEC-DRF-4264

SUMMARY

OF CONFERENCE CALL BETWEEN NRC, ETEC, CONSUMERS F0WER COMPANY AND THEIR CONSULTANTS ON SEPT. 8, 1980 REGARDING THE MIDLAND PLANT UNITS 1 & 2 SOIL SETTLEMENT PROBLEM The items of this summary are keyed to the comment numbers of Enclosure 3 of Reference 1.

2.

Response to Question 16, Pace 16-1 The Applicant committed to modify the response to address the 4

maximum expected differential settlement over the life of the plant.

3.

Response to Question 17, Pace 17-1, Para.1 The Applicant stated that the selection of the Service Water Piping for profiling was based on the criterion that this piping covered the largest area and was expected to represent the worst case. After some discussion, this item was left unresolved.

4.

Response to Duestion 17, Pace 17-2, Para. 2 The Applicant indicated that calculations currently being performed

/

f i

did not utilize the method described in the subject paragraph.

NRC will investigate arrangements for an exchange of ETEC and Bechtel calculations for further review.

5.

Response to Question 17 Page 17-3, Para. 2 The Applicant is investigating the settlements over the life of the plant.

6.

Response to Question 17 The Applicant stated that stresses in excess of the previously proposed 3 Sc limit were obtained and is going to propose that the limit be increased.

Such an increase is to be based on stress levels permitted by other aspects of the Code,e.g. manufacturing.

ETEC's comments are on hold pending receipt of additional information.

7.

Response to Question 18, Page 18-1, Para. 2 & 3 The Applicant stated that final closure welds have been made and that the amount of settlement before final closure is unknown. This item is~ unresolved.

l 4

Enclosure to: duticL-UKt-4409

_2

  • O 8.

Response to Question 18, Pages 18-2, Para. 2 & 3 The Applicant will re-evaluate this item.

9.

Response to Question 19, Pages 19-1 to 19-3 The Applicant will re-evaluate this item.

10. Response to Question 20 The Applicant will re-evaluate this item.

4 y

i-

..._..-.....m

.-.-61..--

-..a

o DA Distribution ETEC LETTER REVIEW RECORD O

Adler, KL Granger, RA

_Zweig, HR

_ Akamine, KS

_ Hall, J

_ Zweng, DJ Prepared by: W. P. Chen (J. O. Bates

_ Anderson, WG

_ Haroldsen, 00 1 Wieseneck. HC

_Archbold, F

_Hinze, RB

_X_ Brammer, JM Typed by: Cecilia Atz, RW Hoffman, NJ Addressee: Mr. R. J. Bosnak - NRC i

~

1 Auge, IJ

_Holwager, TL i

Baker, RS Homer, RS

_Balkwill, JK

_Hutmacher, ES

]

NX/Ltr No.:,_

80 ETEC-DRF-4264 i

_ Barber, HE

_ Ingle, WB Barrett, EM Jassak, RM Date: October 6,1980 1 Bates,JO

_ Johnson, Ron A DOE Imad Branch:

_ Bierfreund, AI _Kardowski, A Boise, MW Kern, AO

~

~

~

i

-Bryan, RL Klea, JA Completes action in:

DEF-Budney, GS Klein, A Midland Plant Uni m T E

~~

~

~

~

~Larson, DA subject: Summary of Conference Call Burns, Na Campbell, DR Leppard, JA of SeptemDer 8, 1980 Regarding 5011

~

~ Mantle, JG Settlement Problem.

~

_ Carpenter, DM JChen,WP/

_Marrazzo, MA

_uAeveland, JR

_McCarty, JW Beq. ection

_ ETEC _Other _Mong

_Cochran, JC

_McDowell, MN

_Copeland, LB

_Meyer, JH Remarks:

_Cox, FJ Miller, AE

_Cusimano, S

_ Miller, NJ Cygan, R Naish, RK f

[Darley,DK

_Neely, HH Rev./

Davis, KA Nicholson, JO Department / Unit Appe.

Signature DeBear, WS Olson, PS

_DeMuri, RJ

_ Parks, JC Vice President DeVita, V Penman, RB

/-

]DeWitt,HW Peters, WL Mgr, Facil. Des.

Xc kbh&

_Dewart, WG

~ Pilling, BS

~

igr, Stress X

HDA

~DeZotell, ML 1

Polino, DL

_Donohue, HF

_Poucher, W

" "~

_ Drazich, NH

_f sck, WF Mgr, Test Eng.

_ Douglas, RE

_ Roberts, JK

_Droher, JJ Schmidt, GL

_Eichelberger,RL 1Schnurstein, RE _

_ Ervin, G

_ Shepard, RC Mgr, QA I

Fenton, RE Shinnaman, S

_Ferguson, E

_Skogstad, L Mgr, Construct.

_ Fischer, BE

_Soucy, RC

_ Fletcher, FL

_Stafford, KT Mge, Tech. Serv.

Forster, EG Stearns, JD J

[Freede,WJ

[Sturtevant,WC Mgr, Operations 4_l /

~

Garland, MD Tabor, W t

_Gaylord, GG Tessier, MJ A/C Coordinator Prog /Proj Mgat X

_ Gilder, TE

_Thompsor., EG x_DRF Control

~

i

_ Gillies, BB Twa, GJ Library Other

_ agner, RK

_ Prog. Adm. (SS)

W l

Glumace, RJ

_ eigand, MA

_ Purchasing (SS) l

_Goggin, DE W

\\

Gould, MI Werth, RL

_ Safety (SS) l

_ iese, RW X_With enclosure l

_Graner, SG W

FORh8 735 A.174 REV 8-79

\\

- -