ML20091L108
Text
--
A.
N I
jut 1 G 1979
/
Docket No. 50-329/330 i
HEi'.ORNO'I4 FOR:
James G. Keppler. Director, Region III FRO'i:
Karold D. Thornburg Director Division of Reactor Construction Inspect}8n, IE SIG1ECT:
RECCE'OATIO:t FOR DTIFICATIO.10F THE LICENSI!IG BOARD O!! HIDLAftD Your r.omrandum dated April 20, 1979 recomended that a series of interin 50.55(e) reports on the diesel generator settler.ent proble:s (first reprte to the ro:rd on Hover.ber 16,1973) te sent to the Board, fiRR has acted l
The enclosed cerorandum from Vassallo to Christen t
outlines the reasons for the denial.
29, 1979, l'
The second ites which wa had recoriacaded for Coard notification, qual if fication of components, was also denied on the basis that the licensee i(
uns proceeding properly and problens of equipront not being able to qualify ware f.ot'eg{ dent.
Of pc.rticular note in this iRR denial is the fact that they indicate once the issue has been identified there is no requirecent that the staff provide tha routtria docunantatica on the resolution to the Coard unless reqacsted.
The staff is c:pected to provide the results of the evaluation in the SE2 or its sunierents, bu,t not all the background unless reques If yoo have questions en this ite=, please contact us.
i If Harold D. Thornburg, Director Division of Reactor Construction Inspection
Enclosure:
1:eno Yassallo to Clu istenbury dtd 5/20/79 w/ enclosures i
cc w/cnclosures:
J. G. Davis, IE i (
D. Tho:3.pson, IE 1
\\
G. W. Retnr.uth, IE G. C. Gae ar, IE RCI AD:RCI 0:RCI l
C0.iTACT:
P.. E. Shewcaker. IE 49-27551 REShewnaker: GWReine.uth H3Thornburg i
l S/
/79 mk C/
/79 6/
/79 i
84060{0336840517 N
hE84 6
~w
---a w
+w 4
-av-
,w--
--9-e-v+- - -
.