Forwards Work Activity List for Oct 1982 for Remedial Soil Work,Per NRC-util Work Authorization Procedure.Authorization of Specific Work Items Requested.Requests Priority Handling for Listed Activities
ML20091H357
Person / Time
Site: Midland
Issue date: 09/24/1982
From: Miller D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17198A223 List: ... further results
References
CON-BOX-09, CON-BOX-9, FOIA-84-96 CSC-6335, NUDOCS 8406050139
Download: ML20091H357 (16)


Text

e,,

" 's s

%?

Donald 8 MIIIer. Jr Site Manager MidM Project i

p Midland Project: PO Sox 1963 Midland. MI 48640 * (617) 6314660 PRINCIPAL STAFF September 24, 1982

}g t 8

2A a/nA

! yr Mr. W. D. Shafer, Chief 2/M l GR+3 BEE _I

'N

/

blidland Project Section 2 'M Iil2

)-

_ _ 7S Nuclear Regulatory Comission 3TP l

[

t Region III

^

3 i

I 799 Roosevelt Road DL l

IFILE I W 1

/GlenEllyn,IL 60137 MIDLAND NUCLEAR CCGENERATION PIANT REMEDIAL SOILS h0RK AlrIHORIZATION File: 0485.16 UFI: 12*32 Serial: CSC-6335 42*05*22*04 We are enclosing the proposed list of work in accordance with the "NRC and CPCo Work Authorization Procedure" for the oeriod between October 1,1982 and October 31, 1982. Please review this work list and authorize the specific work items as established in the procedure.

We have also enclosed a Supplemental Work Activity List for November 1982. Your review, coments and authorization of the specific Work Items as in accordance with the procedure is similarly requested.

i New items to our last submitted Work List amendment are items highlighted with a single asterisk. Two work items previously appearing on our Work List but revised to change numbering are identified with footnotes and the previous act-ivity identifier. Revised items to our last submitted Work List are identified by a double asterisk.

For the work specified to be in progress in October, please provide the requested authorization by October 1, 1982.

We would appreciate priority handling for the following activities:

165052015 Pier 12W-Drift From Access Shaft to Pier 12W 165053010 Pier 12W-Excavate Pier 12W 165054010 Pier 12W-Install and Load Pier 12W 155052015 Pier 12E-Drift from Access Shaft to Pier 12E I

155053010 Pier 12E-Excavate Pier 12E 155054010 Pier 12E-Install and Load Pier 12E 207050604 SWPS Dewatering-Probe for Deep Utilities 207050645 SWPS Dewatering-Install Seal Between SWPS and CNIS 207050386 SWPS Core Drill CWIS Slab for Ejector Wells 8406050139 840517 gr30PN A

7 PDR FOIA s

~

RICE 84-96 PDR it CP 7

G RBEDIAL SOILS NORK NJ1110RIZATION September 24, 1982 Page 2 202550100 SWPS Building Monitoring-Install Deep Seated Bench Marks 207050335 SWPS Access Shaft and Open Cut Excavating-Install Soldier Piles 312150011 BWST Unit #1 Tank-Construct New Ring Beam 4

322150011 BWST Unit #2 Tank-Construct New Ring Beam i

202550500 Train A G B of 36" SW Pipe Replacement-Excavate Existing Pipe 115150026 Remove 36" casing and backfill 42" hole 102150017 Proofload Jacking (four point jacking test to be deleted by drawing C-1494) 112150017 Proofload Jacking (four point jacking test to be deleted by drawing C-1494) 822550001 Excavate for Install and Backfill Drainline and Slab for Acid-Caustic Unloa ing S ation -t East end of Turbine Building.

[

4 D. B. Miller"

/

Site Manager i

DBf/GBJ/dmw Attachment s

i L

l -

i I

o

- i 6

m fs

1 4

T

b I

-... ~

  • 1 Crnsumers Power Company Attachment to Serial "

Midland Plant-Units 1 & 2 CSC-6335 WORK ACTIVITY LIST FOR TIIE PERIOD BETWEEN OCTOBER 1, 1982 AND OCTOBER 31, 1982 DEVELOPED IN COMPLIANCE WITII ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS' IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION AUXILIARY BUILD E0 & FIVP UNDERPINNING PROGRAM WEST FIVP

\\

102150010 Install Anchor Bolts & Wods 1 (8/12/82) A(8/13/82.. /

(includes hardness test en rods, drill concrete & steel

.[

and tenwinning)'

t 102150017 Proofload Jacking (four point Jacking test to be deleted by drawing C-1494) 2 (9/17/82)

EAST FIVP u

j 112150010 Install Anchor Bolts & Rods 1 (8/12/82) A(8/13/82)

(includes hardness tests on rods, drill concrete & steel, and tension) 112150017.Proofload Jacking (four point jacking test to be deleted by drawing C-1494) 2 (9/17/82)

CONTROL TOWER POST TENSION VERIFICATION 102550203 Verify Post Tension Loads 3 (8/13/82) A(8/13/82)

BUILDING MONI_TORING 136050043' Maintain Instrument System 3 (8/12/82) A(8/12/82)

'5 GENERAL TEMPORARY DEWATERING f

125150050 Continue Monitoring Utility Protection Pits (4) 3 (8/12/82) A(8/12/82) i j

115150020 Continue Operation of Freeze System & Wells 3 (8/12/82) A(8/12/82) mi"882-2439d173-27 DFRonk 9/24/82

' o c.no.*9 4

_ Consumers Power Company Attachment to Serial,'

Hidland Plant Units 1&2 CSC-6335 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN OC10BER 1, 1982 AND OCTOBER 31, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION

^

115150026 Remove 36" casing and backfill 42" hole.

1 (9/17/82)

?

115150025 Clean out and backfili abandoned ejector holes.

3 (9/17/82) A(9/17/82) 125150051 Install Clay to Below Duct Bank (pit 4) 1 (8/12/82)

)

125150052 Repair Duct P.ank (pit 4) 1 (8/25/82)

(includes excavate, drift, repair and backfill)

CRACK MAPPING (includes scaffolding platforms, ladders and extra-ordinary clean up) 102250200 EPA (East & West) 3 (8/12/82) A(8/12/82)

.102250105 FIVP (East & West)-

3 (8/12/82) A(8/12/82) 102250100 Control Tower & Remainder of Aux Bldg 3 (8/12/82) A(8/12/82) i PIER 12W 165052015 Drift from Access Shaft to Pier 12W1 1 (8/12/82) 165053010 Excavate Pier 12W2 1 (8/12/82) t i

165054010 Install & Lord Pier 12W3 1 (8/12/82)

PIER 11W 165052027-Drift frca Access Shaft to Pier 11W1 1 (8/25/82) r 165053015 Excavate Pier 11W 1 (8/25/82) ciO882-2439d173-27 DFRonk 9/24/82

-b n -.n.n.

&. - Q,I w

' '. i

.....n

~e--

- - -, ~. - - - - - -

,'m 3

C;nsumers Power Company Attachment to Serial Midland Plant Units 1&2 CSC-6335 WORK ACTIVITY LIST FOR THE PERIOD EEWEEN OCTOBER 1, 1982 AND OCTOBER 31, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM. WORK AREA & ACTIVITY DESIGNATION 165054015 Install & Load Pier 11W8 1 (8/25/82)

(includes install bituminous plywood forms) 105050908 Perform Pier Load Test 1 (8/25/82)

DIER 9W 165052010 Drift from Access Shaft Under FIVP to Pier 9W1 1 (8/12/82) 165053005 Excavate Pier 9W2 1 (9/17/82) 165054005 Install & Load Pier 9W8 1 (9/17/82)

PIER 12E 155052015 Drift fros' Access Shaft to Pier 12E1 1 (8/12/82)

'155053010 Excavate Pier 12E2 1 (8/12/82) 155054010 Install & Load Pier 12E8 1 (8/12/82)

PIER 11E 155052027 Drift from Access Shaft to Pier 11El 1 (8/25/82) 155053015 Excavate Pier 11E2 1 (8/25/82) 155054015 Install & Load Pier 11E8 1 (8/25/82)

^

PIER 9E 155052010 Drift from Access Shaft Under FIVP to Pier 9El 1 (8/12/82) 155053005 Excavate Pier 9E2 1 (9/17/82) i 155054005 Install & Load Pier 9E8 1 (9/17/82) miO882-2439d173-27 DFRonk 9/24/82 n-

- ~ - ~ ~ -

~

-- = -

3 s

^

hA

~

  • - - - - - + - - - - - - "

<v 4

Consumers Power Company Attachment to Serial.'

Midland Plant Units 1&2 CSC-6335 l

t.

WORK ACTIVITY LIST FOR THE PERIOD BETWEEN OCTOBER 1, 1982 AND OCTOBER 31, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 1

NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WOhX AREA & ACTIVITY DESIGNATION i

BEAM COKhECTIONS 8

102250201 Modify Beam Con'nections at elev 646 (6 connections) 1 (9/17/82) l' SERVICE WATCR PUMP STRWTt'RE UNDERPINNING PROGRAM i

DEWATERI"G 207050605 InstallEjectorWells 1 (8/12/82) A(9/17/82) 207050385 Core Drill SWFS Elab for Ejector Wells 3 (9/17/82) A(9/17/82) 207050386 Core Drill CWIS Slab for Ejector Wells 207050603 Probe for Shallow Utilities 3 (9/17/82) A(9/17/82) 20'050604 Probe for Deep Utilities 1 (9/17/82) a 207050600 Install Piezometers 2 (8/25/82) A(8/25/82) 207050645' Install Seal Between SWPS & CWIS 1 (8/25/82) j 207050635 Install Dewatering Discherge System 2 (9/17/82)

(including headers, tank, pumps and electrical) 207050387 Convert 7 Wells used on 72 pipe repair to support SWPS dewatering.

(Includes install new ejectors, tempora ry headers, operate, _& maintain)

BUILDING MONITORING 202550300 Install Deep Seated Bench Marks-1 (8/12/82) miO882-2439d173-27 DFRonk 9/24/82 4

, g G 60eesHt.

.. =

~

c w

e

-w' 4

'S Consumers Power Company Attachment to Serial,'

Midland Plant Units 1&2 CSC-6335 2

WORK ACTIVITY LIST FOR THE PERIOD BETWEEN OCTOBER 1, 1982 AND OCTOBER 31, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 i

NEW OR ACTIVITY PREVIOUS REGION III

! REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 206050105 Crack Map EWPS 1 (9/17/82) 206050100 Install Extensometers 1 (9/17/82)

T 206050106 Install Instruments (Includes testing & calibration) 1 (9/17/82)

._/

206050102 Install Brackets 1 (9/17/82) 207550103 Install Conduit 1 (9/17/82) 202550104 Install and Terminate Cable 1 (9/17/82) 206050101 Install Instrument Cc<ers 1 (9/17/82)

ACCESS S!! AFT & OPEN CUT EXCAVATION 207050335 Install Soldier Piles 1 (8/12/82)

)

207056005 Excavate (including install lagging) 1 (8/25/82) 202550162 Relocate Fire Protection Pipeline 1 (8/12/82) A(9/17/82) 202550163 Remove Abandoned Fire Protection Pipeline BORATED WATER STOdAGE TANK FOUNDATION & TANK REPAIR PROGRAM UNIT 1 TANK 312150111 Rebar Mapping 3 (8/25/82) A(8/25/82) 312150011 Construct New Ring.Bram 1 (8/12/82)

(drill G grout dowels, set forms & place rebar, pour concrete)

I

- 312150211 Strip Waterproof Membranc on Valve Pit 3 (8/25/82) A(8/25/82) miOSS2-2439d173-27' DFRonk 9/24/82

,,::. t o.e-

=.

-5?

- - - -... - ~ ~. - - - - - - - - - -

%i 1

6

, Consumers Power Company Attachment to Serial,'

'Cidland Plant Units 1&2 CSC-6335 WORK ACTIVI'T LIST FOR THE IT.RIOD EETWEEN OCTOBER 1, 1982 AND OCTOBER 31, 1982 bEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 i

NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 312150015 Relevel Tank 1 (9/17/82) 312550019 Reinstall Electrical DuctLank 2 (9/17/82) i

,,-)

312550018 Reinstall Piping, Pipe Hangers and Electrical Facilities 3 (9/17/82) A(3/17/82)

UNIT 2 TANK 322150111 Rebar Mapping 3 (8/25/82) A(8/25/G2) 322150011 Construct New Ring Beam 1 (8/12/82)

(drill & grout dowels, set forms & place rebar, pour concrete) 322150211 Strip Waterproof Membrane on Valve Pit 3 (8/25/82) A(8/25/82) j_

322150212 Repair Tank Weld Defect 1 (8/25/82) A(9/17/82) 322550019 Reinstall Electrical Duct Bank 2 (9/17/82) 322550018 Reinstall Piping Pipe Hangers and Electrical Facilities 3 (9/17/82) A(9/17/82) l UNDERGROUNJ PIPE REPLACEMENT, RR8EDDING AND MONITORING PROGRAM F

TRAIN A & B OF 36" SERVICE WATER PIPE REPLACEMENT

]

202550500

Excavate Existing Pipe 1 (8/12/82) t 202550510 Remove Existing Pig.e 1 (8/25/82) i 1

202550520 Install new pipe &' expansion coupling 1 (8/25/82) 202550525 Temporary Backfill 1 (8/25/82)

L miOSS2-2439d173-27 DFRonk 9/24/82 l

l1. i t C ~*H

~

1

-:...---,...-:----~-~--

7 Consumers Power Company Attachment to Serial, Midland Plant Units 1&2 CSC-6335 WORK ACTIVITY LIST FOR THE PERIOD BE'!VEEN OCTOBER 1, 1982 AND OCTOBER 31, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WOPK AREA & ACTIVITY DESIGNATION 402550515 Hydro Test new pipe 3 (9/17/82) A(9/17/82) t o

402550507 Perform Profiling & Ovality Check on New Piping PERMANENT DEWATERING PROGRA_M 522150005 Install Remaining hella 1 (9/17/82) 522550010 Excavate for, Construct, and Backfill Electrical Duck Bank 1 (9/17/82) 522550015 Install Electrical Equipment & Conduit 1 (9/17/82) 522550020 Excavate for, Install ano Beckf111 Header Piping and Pumps 1 (9/17/82)

(including equipment slaba and metering pits)

CONSTRUCTION WORK IN SOIL MATERTAL PROGRAMS DIESEL FUEL STORAGE LINES 722050001 Install Missle Shielding 1 (8/25/82) t 722050002 Excavate fce, Hemove, Reinstall and Backfill Diesel Fuel Oil Supply Lines

[-

PERMANENT INTEUSION DETECTION SYSTEM 4

732050002 Install Wire (inc1 conduit) 3 (8/25/82) A(8/25/82) 732050003 Install Fence (inct fence poeta & cancrete st rip 3 (8/25/82) A(8/25/82) 732050004 Install Grounding 3 (9/17/82) A(9/17/82)

.miO882-2439d173-27 DFRonk 9/24/82 i T 6 g g

^

~

8' Consumers Power Company Attachment to Serial.

Midland Plant Units 1&2 CSC-6335 WORK ACTIVITY LIST FOR THE PERIDO BETWEEN OCTOBER 1, 1982 AND OCTOBER 31, 1982 DEVELOPED IN CCMPLIANCE WITd ASLB ORDER OF APRIi. 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK _ AREA & ACTIVITY DESIGNATION COOLING POND DIKE 742050001 Replace Armor Stone on N.E. dike 1 (8/25/82) A(8/25/82)

CATHODIC PROTECTION s

752050001 Drill & Replace AA odes (as necessary) 1 (8/25/82)

.)

752050002 Drill & InsN11 New Annodes TECHNICAL SUPPORT CENTER 772050002 Excavate & Install Domestic Water Pipeline 1 (8/25/82) A(9/02/82)

.j

'772050003 Excavate & Install Sanitary Pipeline 1 (8/25/82) A(9/02/82)

NITROGEN TAhK INSTALLATION J

i 782550005 Excavate for, Install, and Backfill Electrical Duck Bank 1 (9/17/82) 782550010 Excavate for, Install and Backfill Piping 1 (9/17/82) 782550015 Excavate for, Install, and Backfill Concrete Pad 1 (9/17/82) 0 782550020 Excavate for, Instali, and Backfill Nitro 8en Tanks and Associated Concrete Structures EMERGENCY PERJONNEL LOCES - UNIT 2 792550005' Excavate for, Install and Backfill Concrete Airlock Structure 1 (9/17/82)

CONTAINMENT TENDON ACCESS VENT HVAC 802550010 Excavate for, Install and Beckfill Electrical Duck Bank and 1 (9/17/82)

Equipment Pad for the I. nit 1 HVAC FAN miO882-2439d173-27 DFRonk 9/24/82

" I 0 "* *M'

- - - - - - - - - - - - - ~

9

.Crasumers Power Company Attachment to Serial [

Midland Plant Units 1&2 CSC-6335 WORE ACTIVITY LIST FOR THE PERIOD BETWEEN OCTOBER 1, 1982 AND OCTOBER 31, 1982 DEVELOPED IN CortPLIANCE liITH ASLB ORDER OF APRIL 30, 1982

'NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK _ AREA & ACTIVITY DESIGNATION 802550020 Excavate for, Install and Backfill Electrical Duck Bank and I (9/17/82)

Equipment Pad for the Unit 2 HVAC Fan

.j.

SIT /ILRT TEST FACILITIES 812550010 Excavate for, Install and Dackfill Utilities and Concrete 1 (9/17/82)

Pad for the Unit 1 Test Equipment

,I,1 812550020 Excavate for, Install.and Backfill Utilities and Concrete 1 (9/17/82)

..[

Pad for the Unit 2 Test Equipment ACID-CAUSTIC UNLOADING STATION

~ ~

822550001 Excavate for, Install, and Backfili Drainline and Slab for X,

' Acid-Caustic Unloading Station at East end of Turbine Building 4

5 i

miO882-2439d173-27 DFRonk 9/24/82 e Y, $ Q e ** WOW *

'l C nsumers Power Company Attachment to Serial, Midland Plant Unita 1&2 CSC-6335 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1982 AND NOVEMBER 30, 1982 DEVELOPED 'N COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION AUXILIARY BUILDING & FIVP UNDORPINNING PROGRAM WEST ACCESS SHAFT 165052020 Excavate Shaft to Elevation 597 1 (9/17/82) s (also remove material under FIVP on 3:1 slope) l EAST ACCESS _ SHAFT 155052020 Excavate Shaft to Elevation 597 1 (9/17/82)

(also remove material under FIVP on 3:1 slope)

PIER 8W 165052025 Drift from Pier 9W to Pier 8Wt 1 (9/17/82) 165053020 Excavate Pier 8W2 1 (9/17/82) 165054020 Install & Load Pier 8W8 1 (9/17/82)

GRILLAGE STRUCTURE AT PIER 8W 165052305 Drif t for and Install Boikhead from Pier 8W north to containment Wall i 1 (9/17/82)

!~

165059025 Excavate snd remove mudsla'o for Grillage Beans between 1 (9/17/82)

Pier 8W and Contair. menti 165053025 Excavate for Support Columns next to Containment 2 1 (9/17/82)

I 165055003 Install Steel Suppoct Columns next to Containment 1 (9/17/82) 165055010 Install & Load Grillage Structure at Pier 8W 1 (9/17/82)

PIER Ke 2 165052325 Drift from West Access Shaft to Pier Kc 21 1 (9/17/82) miO882-2439f173-27 DFRonk 9/24/82 3

n..seo*+

....- - - - ~ ~ ~ ~ - - -

~ ~2 Consumers Power Company Attachment to Serial,'

Midland Plant Units 1&2 4

t CSC-633$

SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1982 AND NOVEMBER 30, 1982 t

DEVELOPED IN CCMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 165053320 Excavate Pier Ke 22 1 (9/17/82) 165054315 Install & Load Pier Kc 28 1 (9/17/82)

. _)

PIER 10W 165052050 Excavate Access to Pier 10W2 i (9/17/82) 165053035 Excavate Pier 10W2 1 (9/17/82)

PIER SE 155052025 Drift from Pier 9E to Pier 8E1 1 (9/17/82) 155053020 Excavate Pier 8E2 1 (9/17/82) 155054020 Install & Load Pier 8Es 1 (9/17/82)

GRILLAGE STRUCTURE AT PIER SE 155052305 Drift for anJ' Install Bulkhead from Pier 8E north to Containment Wall i 1 (9/17/82) i 155059025 Excavate and remove mudslab for Grillage Beans between 1 (9/17/82)

Pier SE and Containment 1 155053025 Excavate for Support Columna next to Contair.mentz 1 (9/17/82) 155055003 -

Install Steel Support Columns next to Containment 1 (9/17/82) 155055010 Install & Load Grillage Structure at Pier 8E 1 (9/17/82)

+

PIER Kc 11 155052325 Drift from East Access Shaft to Pier Kc 11 1 1 (9/17/82) miO882-2439f173-27 DFRonk 9/24/82

. l,r. s o..sge-w~

  • 3 Consumers Power Company Attachment to Serial, Midland Plant Units 1&2 CSC-6335 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1982 AND NOVEMBER 30, 1982 DEVELOPED IN COMPLIANCE W TH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK _ AREA & ACTIVITY DESIGNATION 155053320 Excavate Pier Ke 112 1 (9/17/82) 4 155054315 Install & Losd Pier Kc 118 1 (9/17/82)

PIER 10E

_)

155052050 Excavate Access for Pier 10E8 1 (9/17/82) 155053035 Excavate Pier 10E2 1 (9/17/82)

SERVICE WA*ER PUMP STRUCTURE INDERPINNING PROGRAM DEWATERING 207050620 Activate Dewatering System 1 (9/17/82)

BUILDING MONITORING g

206050107 Install Strain Monitors 1 (9/17/82) 206050104 Baseline, Operate and Maintain Instrument System PIER 1E 207053005 Excavate Pier IE2 1 (9/17/82) 207054005 Install and load Pfer'1E8 1 (9/17/82)

PIER IW 207053010

. Excavate Pier IW2 1 (9/17/82) 207054010' Install and load Pier IW8 1 (9/17/82)

BORATED WATER STORAGF TANK FOUNDATION & TANK REPAIR PROGRAM UNIT I TANK 312550300 Install Instruments-(Includes testing and calibration) miO882-2439f173-27 DFRonk 9/24/82 2,, q r, s,.,g.

.l s

j C:Insumers Power Company Attachment to Serial, i

~ Midland Plant Units 1&2 CSC-6335 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1982 AND NOVEMBER 30, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION UNIT 2 TANK 322550100 Install Instruments (Includes testing and calibration)

\\.)

%L 1

b miO882-2439f173-27 DFRonk 9/24/82 ll l e o..'.psum.

- ~ _.

q s

e t

FOOTNOTES I

1 Drift Activity normally includes

- l 1.

fabricate steel sets g

_ j 2.

excavate j

3.

install steel sets (Hilti bolts as necessary) i 4.

remove concrete (as necessary) 5.

localized dewatering (as necessary) l 6.

install wood lagging 7.

place mudmat S.

stabilize soil (as necessary) 9.

brace and/or rebrace 2 Excavate Pier activity normally includes 1.

excavate 2.

concrete removal (as necessary) 3.

dewatering (as necessary) 4.

fabricate steel lagging i

5.

install steel lagging I

6.

auger bottom of pit to determine hydrostatic water pressure & plug (piers 10 & 12 E&W) j 7.

place mudmat 8.

stabilize soil (as necessary)

.x 8 Install & load Pier activity normally includes i

1.

fab & insttll embeds 2.

fab & install reinforcing stesi 3.

install telltales 4.

install Carlson meters (pier 11 E&W) i 5.

place concrete 6.

fab & icstall leveling & bearing plates, Jack-stands 7.

install jacks 8.

transfer load.

f Activity previously identified incorrectly as 206050102 i

I Activity previously identified incorrectly as 1025503010 I

f I

l miOS82-2439b173 1

4 c.

3

~

~

El.