I DEPT,05 SLO DESTP Midland Project: PO Box 1963. Midland, MI 48640 e (517) 6314650 OL l FILE b November 24, 1982 l
Mr. W. D. Shafer, Chief Midland Project Section i
US Nuclear Regulatory Commission Region III i
799 Roosevelt Road Gle.a. Ellyn, IL 60137 l
MIDLAND NUCLEAR C0 GENERATION PLANT REMEDIAL SOILS h0RK AUTHORIZATION File: 0485.16 UFI: 12*32 Serial: CSC-6437 42*05*22*04 l
We are enclosing the proposed list of work in accordance with the "NRC and CPCo Work Authorization Procedure" for the period between December 1,1982 and Decem-ber 31, 1982. Please review this work list and authorize the specific work items as established in the procedure.
We have also enclosed a Supplemental Work Activity List for January 1983. Your review, comments and authorization of the specific Work Items as in accordance with the procedure is similarly requested.
i For the work specified to be in progress in December, please provide the re-quested authorization by December 6, 1982.
We would appreciate priority handling for the following activities:
102150017 - West FIVP - Four Point Jacking Test 112150017 - East FIVP - Four Point Jacking Test 102550203 - Verify Post Tension Loads l
165052015 - Pier 12W - Drift From Access Shaft to Pier 12W 165053015 - Pier 12W - Excavate Pier 12W I
165054010 - Pier 12W - Install and Load Pier 12W 155052015 - Pier 12E - Drift from Access Shaft to Pier 12E
.j 155053010 - Pier 12E - Excavate Pier 12E i
155054010 - Pier 12E - Install and Load Pier 12E 207050605 - SWPS Dewatering - Install Ejector Wells 207050385 - SWPS Dewatering - Core Drill SWPS Slab for Ejector Wells 207050604 - SWPS Dewatering - Probe for Deep Utilities 207050600 - SWPS Dewatering - Install Piezometers 207050645 - SWPS Dewatering - Install Seal Between ShTS and CNIS 207050386 - SWPS Core Drill CWIS Slab for Ejector Wells 132550050 - Install wire, conduit and raceway from pier to data room for Pier Instrumentation g
1 0406050124 840517 I
RICE 84-96 PDR 0
e
REMEDIAL SOILS WORK AITIHORIZATION Noveracer 24, 1982 Page 2 202550163 - Remove Abandoned Fire Protection Pipeline 206050105 - Crack Map SWPS i
207050387 - Convert 7 wells used on 72" pipe repair to support SWPS dewatering 312150011 - Construct New Ring Beam Unit 1 BWST 32215011 - Construct New Ring Beam Unit 2 BWST 202550100 - SWPS Building Monitoring - Install Deep Seated Bench Marks 207050335 - SWPS Access Shaft and Open Cut Excavsting - Install Soldier Piles 312150005 - BWST Unit #1 Tank - Drill and Grout Shear Connectors 322150005 - BWST Unit #2 Tank' -Drill and Grout Shear Connectors 202550500 - Train 6
of 36" SW Pipe Replacement - Excavate Existing Pipe L
D. B. Miller Site Manager l'
DBM/GBJ/dmw Attachment i
?
I i
{
l l
i L.
g N
L'f 4
g
'i 1
.4
i
~.I T
~
ACTION INFORMATION l
- J W Cook, P26-336B X
R A Wells, P14-113A X
.. ~
'J A Boos, Bechtel Ann Arbor t
l
- J A P' ay P14-115A X
J X Brunner M-1079 I
J R Schaub, P13-305 X
R C Bassaan. P14-3125 X
W R Bird, P14-418A X
J K Meisenheimer, Midland X
A R Hollenkopf, P14-408A X
D B Miller, Midland X
T J Sullivan, P24-624A X
-D M Budzik, P24-517A X
N J Saari, Midland I
t D F Lewis, :7220 Ann Arbor Pouch X
R W Huston, Washington X
R L Touteberg, P24-505 I
NRC Correspondence File P24-517 X
IL&B:
F C Williams, Washington X
P Steptoe, Chicago X
R M Wheeler, Midland X
Neil Swanberg, Bechtel Ann Arbor File: 0485.16 UFI:
42*0$*22*04 j
GBJohnson, Midland n,
e i
f i
3
m -. _
,~
' -. = =.
w-
-u
- * ="
l' 4
I
- 1
- 4 Coa.sumers Power Company AttachmenttoSerialCSC-643h Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR TE PERIOD BETWEN IECDBER 1,1982 AND DECEMBER 31, 1982 DEVEIDPED IN COWLIANCE WITM ASLB ORDER OF APRIL 30, 1982 MWOR ACTIVITY PREVIOUS REGION III MVISED ITEMS IDE NIFIER PROGRAN, WORE AREA & ACTIVITY DESIGNATION GEMRAL QUALITY PR3GRAN 102351110 Approval of feQF-1, Rev 4 A(10/22/8 %
..)
102351100 Approval of leQP-2, Rev 1 A(10/22/82)
AMEILIARY BUILDING & FIVP 18EERFINING PROGRAM ACCESS SMAFTS 105050906 Redress the slope lay back surfaces WST FIVP 102150010 Install Anchor Bolts & Reds I (8/12/82) A(8/13/82)
(includes hardness test on rods, drill concrete & steel and tensioning) 102150017 Proofload Jacking (fouc point jacking test)
EAST FIVF i
112150010 Install Anchor Bolts & Rods 1 (8/12/82) A(8/13/82)
(inclades hardness tests on rods, drill concrete & steel, ud tension) 112150017 Proofload Jacking (four point jacking test) 9
' ' mieSS2-2439dI73 m
JEKostielacy 11/24/82
& r
- 2 r - - rs Feuer Company Attachment to Serial CSC-64I7 Itidland Plant Units 1 & 2
. WDRK ACTIVITY LIST FOR TM PERIOD MTMEN MCEMBER 1,1982 AND DECEMBER 31, 1982 MVEIDPED IN COWLIANCE WITN ASLB ORDER OF APRIL 30, 1982 NW OR ACTIVITY PREVIOUS REGION III MV!MD ITEM IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION CONTROL toter POST TEllSION VERIFICATION 102550203 Verify Post Tension Loads R
BtJILDING MONITORING
-136050043 Maintain Instrument System 3(8/12/82)A(8/12/82j 132550050 Install,. wire conduit and raceway from pier to data room for Pier lastrumentation GEMRAL TEWORARY DEWATERING 125150050 Coatiane Monitoring Utility Protection Pits (4) 3 (8/12/82) A(8/12/82) 115150020 Coatione Operation of Freese System & Wells 3 (8/12/82) A(8/12/82) 115150026 Remove 36" casing and backfill 42" bole.
1 (9/17/82)
~**
115150025 Cleam ont and backfill =k= M ejector holes.
R (M 26A, M 28A and M 54) 125150051 Install Clay to Below Doct Bank (pit 4) 1 (8/12/82) 125150052 Repair Dact Bank (pit 4) 1 (8/25/82)
(incledes excavate, drift, repair and backfill)
CEACK NAPPING (incledes scaffolding platforms, ladders and extra-ordinary clean up) 102250200 EPA (East & West) l 3 (8/12/82) A(8/12/82) 102250105 FIVF (East & West) 3 (8/12/82) A(8/12/82)
I-t '
~
3 JEKostielney 11/24/82 gg_,m.
.~w.._.
.... - _. ~. _ - _. _ _ _
. 3 Caesumers Power Campany Attachment to Serial CSC-643'7 Nidland Plant IInits 1 & 2 WDRE ACTIVITY LIST FOR TM PERIOD MTWEN MCDSER 1,1982 AND MCEMBER 31, 1982
+
MVEIAPED IN CoffLIANCE WITN ASLB neNR OF APRIL 30, 1982 EU OR ACTIVITT PREVI0llS REGION III i
MVISED ITE S IM NTIFITE PROGRAN, WORE AREA & ACTIVITT MSIGNATION L
182250300 Centrol Tower r. Remainder of Aux Bids 3 (8/12/82) A(8/12/82)
PIER 12W 165052015 Drift from Access Shaft to Pier 12W1 1 (8/12/82) s 165053010 Excavate Pier 12y2 1 (8/12/82)
~
1 (8/12/82)
{
165054010 Install & Imad Pier 12W8 PIER 11W 165052027 Drift from Access Shaft to Pier 11W1 1 (8/25/82) 165053015 Excavate Pier 11W2 1 (8/25/82)
I
+
165054015 Install & Load Pier 11W8 1 (8/25/82)
(includes install bituminous plywood forms) 195050908 Perform Pier Load Test 1 (8/25/82)
- I PIER 9W 1 (8/12/82) f 165052010
. Drift from Access Shaft Under FIVP to Pier 9W1 c;
[
,n 165053005 Excavate Pier 9W2 1 (9/17/82)
.,j_
165054005 Install & Imad Pier 9W8 1 (9/17/82)
PIER 12E 155052015 Drift from Access Shaft to Pier 12E8 1 (8/12/82)
'L 155053010 Excavate Pier 12E8 1 (8/12/82) 155054010
' Install & Load Pier 12E8 1 (8/12/82) mie082-2439dl73 JEEostielney 11/24/82 e~ees*w~
n 4
Consiemers Power Company Attachment to Serial CSC-6437 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN DECEMBER 1, 1982 AND DECEMBER 31, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III BEVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER 11E 155052027 Drift from Access Shaft to Pier 11El 1 (8/25/82) 155053015 Excavate Pier 11E2 1 (8/25/82)
)
155054015 Install & Load Pier 11E8 1 (8/25/82)
PIER 9E 155052010 Drif t from Access Shaft Under FIVP to Pier 9El 1 (8/12/82)
~ 155053005 Excavate Pier 9E2 1 (9/17/82) 1 155054005 Install & Load Pier 9E3 1 (9/17/82)
BEAM C00DIECTIONS 102250201 Modify Beam Connections at elev 646 ( 1 connection) 1 (9/17/82) 102250203 Modify Beam Connections at elev 659 ( 2 connections) 102250205 Modify Beam Connections at elev 704 (10 connections)
SERVICE WATER PUMP STRUCTURE IBIDERPINNING PROGRAN 4
L.
POST TENSIONING SYSTEM
'y 202555170 Post Tensioning Tendon inspection & maintenance DEWATERING
- ~
207050605 Install Ejector Wells R
207050385 Core Drill SWPS Slab for Ejector Wells R
207050386 Core Drill CWIS Slab for Fjector Wells 1 (11/1/82) c:
[.j
- miO882-2439d173 JEKostielney 11/24/82 4;
?
m
_ as.
5 Consumers Power Company Attachment to Serial CSC-643'7 Cidland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN DECEMBER 1, 1982 AND DECEMBER 31, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 207050603 Probe for Shallow Utilities 3 (9/17/82) A(9/17/82) 207050604 Probe for Deep Utilities 1 (9/17/82)
)
4 207050600 Install Piezometers R
207050645 Install Seal Between SWPS & CWIS 1 (8/25/82) p 207050635 Install Dewatering Discharge System 2 (9/17/82)
(including headers, tank, pumps and electrical) 207050387 Convert 7 Wells used on 72" pipe repair to support SWPS 1 (11/1/82) dewatering.
(Includes install new ejectors, temporary headers, operate, & maintain) l'.
S BUILDING MONITORING 202550100 Install Deep Seated Bench Marks 1 (8/12/82) 206050105 Crack Map SWPS 1 (9/17/82) 206050100 Install Extensometers 1 (9/17/82) 206050106 Install Instruments (Includes testing & calibration) 1 (9/17/82) 206050102 Install Brackets 1 (9/17/82)
MI 207550103 Install Conduit & Raceway I (9/17/82) 102550104 Install and Terminate Cable 1 (9/17/82) 206050101' Install Instrument Covers 1 (9/17/82) 8 miO882-2439d173 JEKostielney 11/24/82
% c.
1
... a
.--~-
. 6 Consumers Power Company Attachment to Serial CSC-6437 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN DECEMBER 1, 1982 AND DECEMBER 31, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 206050104 Baseline, Operate, and Maintain Instrument System 3 (11/1/82) A(11/1/82)
ACCESS SHAFT & OPEN CUT EXCAVATION 207050335 Install Soldier Piles 1 (8/12/82) 1 207050332 Excavate for, & Install Concrete encased soldier piles 207056005 Excavate (including install lagging, walers, I (8/25/82) braces, utility supports and mudmats)
T 202550162 Relocate Fire Protection Pipeline 1 (8/12/82) A(9/17/82) 202550163 Remove Abandoned Fire Protection Pipeline 1 (11/1/82)
BORATED WATER STORAGE TANK FOUNDATION & TANK REPAIR PROGRAM UNIT 1 TANK 312150111 Rebar Mapping 3 (8/25/82) A(8/25/82)
-} ; -
312150005 Drill and Grout Shear Connectors
'*E 312150011 Construct New Ring Beam 1 (8/12/82)
~
(set forms & place rebar, pour concrete)
-3 312150211 Strip Waterproof Membrane on Valve Pit 3 (8/25/82) A(8/25/82)
=,
{-
312150015 Relevel Tank 1 (9/17/82) 9' 312550019 Reinstall Electrical DuctLank 2 (9/17/82) 4 312550018-Reinstall Piping, Pipe Hangers and Electrical Facilities R
mi0882-2439d173 JEKostielney 11/24/82 M C-.M
~ * " '
. _. _ ~ _. _. _ _,
^
. 7 Consumers Power Company Attachment to Serial CSC--6437 q
Midland Plant Units 1 & 2 i
- WORK ACflVITY LIST FOR TNE PERIOD BETWEEN DECEMBER 1, 1982 AND DECEMBER.31, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDDt'0F APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION UNIT 2 TANK 322150111 Rebr Mapping 3 (8/25/82) A(8/25/82)
. 322150005 Drill and Grout Shear Connectors
.j 322150011 Construct New Ring Bean 1 (8/12/82)
(set forms & place rebar, pour concrete) 322150211 Strip Waterproof Membrane on Valve Pit 3 (8/25/82) A(8/25/82) t 322150212 Repair Tank Weld Defect 1 (8/25/82) A(9/17/82) 322550019 Reinstall' Electrical Duct Bank 2 (9/17/82) 322550018 Reinstall Piping Pipe Hangers and Electrical Facilities R
UNDERGROUND PIPE REPLACEMENT, REBEDDING, AND MONITORING PROGRAM t[
TRAIN A & B OF SERVICE WATER PIPE REPLACEMENT 202550500 Excavate Existing Pipe 1 (8/12/82)
.202550510 Remove Existing Pipe 1 (8/25/82)
~ j-
' 202550520 Install new pipe & expansion coupling 1 (8/25/82) 202550525 Temporary Backfill 1 (8/25/82) i 402550515 Hydro Test new pipe R
402550507, Perform Profiling & 0vality Check on New Piping 3 (11/1/82) A(11/1/82) t miO882-2439d173 JEKostielney 11/24/82 7
A.Alom e***
vs-s
.2
7:-
4
~
i
+-w..
~ ~.-
8 Consumers Power Company Attachment to Serial CSC-643'7 Midland Plant Units 1 & 2 2
WORK ACTIVITY LIST FOR THE PERIOD BEIVEEN DECEMBER 1, 1982 AND DECEMBER 31, 1982 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982
.NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER FROGRAM, WORK AREA & ACTIVITY DESIGNATION PERMANENT DEWATERING PROGRAM Q
i 522150005 Install Remaining Wells 1 (9/17/82) f..
Excavate for, Construct, a'nd Backfill Electrical Duct Bank 1 (9/17/82)
,)
522550010 522550015 Install Electrical. Equipment & Conduit 1 (9/17/82) 522550020 Excavate for, Install and Backfill Neader Piping and Pumps 1 (9/17/82)
- l....
(including equipment slabs and metering pits)
CONSTRUCTION WORK IN SOIL MATERIAL PROGRAMS
!~
DIESEL FUEL STORAGE LINES 722050001 Install Missile Shielding 1 (8/25/82) 722050002 Excavate for,. Remove, Reinstall and Backfill 1 (11/1/82)
Diesel Fuel Oil Supply Lines PERMANENT INTRUSION DETECTION SYSTEM 732050002 Install Wire (incl conduit) 3 (8/25/82) A(8/25/82, 732050003 Install Fence (inc1 fence posts & concrete strip 3 (8/25/82) A(8/25/82)
?
732050004 Install Grounding 3 (9/17/82) A(9/17/82)
COOLING POND DIKE 742050001 Replace Armor Stone on N.E. dike R
miO882-2439d173 JEKostielney 11/24/82 g,m
.~
.u.
%m--
... - - ~
- + +.
9 Consumers Power Company Attachment to Serial CSC-6437 Midland Plant Units 1 & 2
- L
' J.-
WORK ACTIVITY LIST FOR THE PERIOD BETWEEN DECEMBER 1, 1982 AND DECEMBER 31, 1982 e
DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982
,( -
i NEW OR ACTIVITY PREVIOUS REGION III i REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION Y
,,].{,
.752050001 Drill & Replace Anodes (as necessary) 1 (8/25/82) y 752050002 Drill & Install New Anodes 1 (11/1/82)
./
-NITROGEN TANK INSTALLATION 782550005 Excavate for, Install, and Backfill Electrical Duct Bank 1 (9/17/82)
^;
782550010 Excavate for, Install and Backfill Piping 1 (9/17/82) 782550015 Excavate for, Install, and Backfill Concrete Pad 1 (9/17/82)
(
- i 782550020 Excavate for, Install, and Backfill Nitrogen Tanks and 1 (11/1/82)
Associated Concrete Strt:ctures
.2 EMERGENCY PERSONNEL LOCKS - UNIT 2 l
792550005 Excavate for, Install and Backfill Concrete Airlock Structure 1 (9/17/82)
Kl CONTAINMENT TENDON ACCESS VENT HVAC 802550010 Excavate for, Install and Backfill Electrical Duct Bank and I (9/17/82)
Equipment Pad for the Unit 1 HVAC FAN e
802550020 Excavate for, Install and Backfill Electrical Duct Bank and 1 (9/17/82)
Equipment Pad for the Unit 2 HVAC Fan 1
SIT /ILRT TEST FACILITIES 812550010 Excavate for, Install and Backfill Utilities and Concrete 1 (9/17/82)
Pad far the Unit 1 Test Equipment miO882-2439d173 JEKostielney 11/24/82
.go.m
~.
..t
~ _. -.. - - - -
10 Consumers Power Company Attachment to Serial CSC-6437-Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN DECEMBER 1, 1982 AND DECEMBER 31, 1982 DEVELOPED IN COMPLIANCE WITN ASLB ORDER OF APRIL 30, 1982
~
I NEW OR ACTIVITY PREVIOUS REGION III
~
. REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION i.. !
- i 812550020 Excavate for, Install and Backfill Utilities and Concrete 1 (9/17/82)
Pad for the Unit 2 Test Equipment ACID-CAUSTIC UNLOADING STATION
,,)
822550001 Excavate for, Install, and Backfill Drainline and Slab for 1 (11/1/82)
Acid-Caustic Unloading Station at East end of Turbine Building OBS-4 Repair L
522550018 Dutch Cone Soil Testing in Vicinity e
of OBS-4 for exploratory purposes f
i 7.s l
~
t t
miO482-2439d173 JEKostielney 11/24/82 s. q cmaeo*w-. __ _. _
- ^
- s
?
' } ?-b ; a i.
~
~1 i
=
.g, W
~.
l';
1 Ceasemers Power 'Campany Attachment to Serial CSC-6437 Midland Plant limits 1 & 2 SilPPLEMNTAL WORK ACTIVITY LIST FOR TM PERIOD BETWEEN JAIRIARY 1,1983 AND JAIRIARY 31, 1983 MVELOPED IN C019LIAllCE WITN ASLR ORDER OF APRIL 30, 1982 MW OR ACTIVITY PPEVIOUS REGION III MVISED ITDIS IllENTIFIER PROGRAN, WORK AREA & ACTIVITY DESIGNATION
. i ABIEILIARY BLIILDIIIG & FIVP 1REIERPIIBIIllG P90GRAN J
t l
W.ST arrrec 3 RAFT i
165052020 Excavate Shaft to Elevation 597 1 (9/17/82) s l
(also remove material under FIVP on 3:1 slope)
J
~
l EAST ACCESS SEAFT 155052020 Excavate Shaft to Elevation 597 1 (9/17/82)
(also remove material under FIVP on 3:1 slope)
PIER W 165052025 Drift from Pier 9W to Pier WI 1 (9/17/82)
~
165053020 Excavate Pier SW2 1 (9/17/82) 165054020 Install & Lead Pier SW3 1 (9/17/82)
GRILIAGE STBilCTLBE AT FIER W 165852305 Drift for and Install Bulkhead from Pier W morth to I (9/17/82)
Containment Wall 8 165059025
~
Excavate and remove mudslab for Grillage Beans between 1 (9/17/82)
Pier W and containment 3 s
165053025 Excavate for Support Columns next to containment 1 (9/17/82) z 165055003-Install Steel Support Columns meat to Containment 1 (9/17/82) 165455010 Install & Lead Grillage Structure at Pier W 1 (9/17/82)
PIER Ec 2 165052325 Drif t free West Access Shaf t to Pier Ec 21 1 (9/17/82) mig 082-2639fl73 JEKostielney 11/18/82 i
- - -. ~
2 Consumers P e r Company Attachment to Serial CSC-6437 Midland Plant Units 1 & 2 SUPPLEMENTAL EORK ACTIVITY LIST FOR THE PERIOD BETLT.EN JANUARY 1,1983 AND JANUARY 31, 1983 DEVEIDPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 SEV G ACTIVITY PREVIOUS REGION III RGISED ITDC IDENTIFIER PROCRAM, WORK AREA & ACTIVITT DESIGNATION 165053320 Excavate Pier Ke 22 g (9/17/82) 165054315 Install & Lo4d Pier Ec 23 1 (9/17/82)
)
PIER 10V 165052050 Eacavate Access to Pier 10W8 1 (9/17/82) 165053035 Excavate Pier 10W2 1 (9/17/82)
PIE 2 SE 155052025 Drif t f rom Pier 9E to Pier SE8 1 (9/17/82) 155053020 Excavate Pier EE2 1 (9/17/82) l 155054020 Install & Load Pier 8E8 1 (9/17/82)
CRILLACE STRUCTLM AT PIER BE 155052305 Drif t for and Install Bulkhead from Pier SE north to 1 (9/17/82)
Containment Vall3 155059025 Excavate and remove oudslab for Grillage Beams between 1 (9/17/82)
Pier SE and Containment 3 155053025 Excavate for Support Columns'next to Containment 2 1 (9/17/82) 155055003 Install Steel Support Columns next to Containment I (9/17/82) 155055010 Install & Ioad Grillage Structure at Pier 8E I (9/17/82) sp miOE32-2439 f173 JEKostielney 11/18/82 i
i
)
^
O O
O 3
Consumers Power CompaaY Attachment to Serial CSC-6 37 Ei4Imad Plant Units 1 & 2 s
SUPPIDEllTAL M)RE ACTIVITY LIST l'OR TE PERIOD ETWEN JAIRIARY 1,1983 AND JANUARY 31, 1983 E VEIDPED IN C0ffLIAIICE WITN ASLR ORDER OF APRIL 30, 1982
~
KW OR ACTIVITY PREVIOUS REGION III EVISED ITEMS IDEarTIFIER PROGRAN, WORK AREA & ACTIVITY DESIGNATION PIER Ec 11
~
155052325 Drift from East Access Shaft to Pier Ec 118 1 (9/17/82) 155053320 Excavate Pier Ec 112 I (9/17/82)
-)
155054315 Install & Load Pier Ec Ils I (9/17/82) l PIER 10E 155052050 Excavate Access for Pier 10E3 1 (9/17/82)
-155053035 Excavate Pier 10E8 1 (9/17/82)
SERVICE WATER PtBF STRUCTERE RESERPIIEfIIIG PROCRAM BEMATERIIIC
~
207050620 Activate, Ope ~ rate and Itaistain Deuntering System 1 (9/17/82)
PIER 1E 207053005 Excavate Pier IE2 3 (97377gy) 207054005 Imatall and load Pier IE8 1 (9/17/82)
PIER IV 207053010 Excavate Pier IW8 1 (9/17/82) 207054010 Install and load Pier IW8 1 (9/17/82)
J. ' mieSS2-2439ft73
~
JEEastielney 11/18/82 Y he~m
a
..._..._.m__.
a.
. 4
'l -.Crnsumers Power Company Attachment to Serial CSC-6437
[
Midland. Plant Units 1 & 2 Q
SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JANUARY 1, 1983 AND JANUARY 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III I, REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION BORATED WATER STORAGE TANK FOUNDATION & TANK REPAIR PROGRAM UNIT 1 TA*!K; 312550100 Install-Justruments (Includes testing and calibration) 1 (11/1/82)
UNIT 2 TANK 322550100-Install. Instruments (Includes testing and calibration) 1 (11/1/82)
- i.
'4 3
(
}
1
}
<t
- c. > {
s i'
4 e a
- I
\\
,~$
s n
n t
tiO882-24391173 JEKostielney 11/18/82 D o
..,w
m I
{
FOOTNOTES 1
1 Drift Activity normally includes 1.
fabricate steel sets 2.
excavate 1
3.
install steel sets (Hilti bolts as necessary) l 4.
remove concrete (as necessary) 5.
localized dewatering (as necessary) l 6.
install wood lagging j
7.
place mudsat j
8.
stabilize soil (as necessary) j 9.
brace and/or rebrace i
2 Excavate Pier activity normally includes 1.
excavate 2.
concrete removal (as necessary) 3.
dewatering (as necessary) 4.
fabricate steel lagging l
5.
install steel lagging g
6.
auger bottom of pit to determine hydrostatic water i
pressure & plug (piers 10 & 12 E&W) l 7.
place mudmat 8.
stabilize soil (as necessary) i a Install & load Pier activity normally includes 3
1.
fab & install embeds 2.
fab & install reinforcing steel i
3.
install te11 tales 4.
install Carlson meters (piet 11 E&W) 5.
place concrete 6.
fab & install leveling & bearing plates, Jackstands 7.
install jacks 8.
transfer load.
+
i h
miO882-2439b173 8
T
-6 m
' \\'
.A 4 g 9:;/s o
g
O NOTES i
(
A single asterisk (*) in left hand column indicates the work activity is a new l
item.
A double asterisk (**) in left hand column indicates the work activity l
description has been revised.
I Designation 1 in the right hand column indicates additional information is required by NRC Region III on this critical activity.
I Designation 2 in the right hand column indicates no additional information is j
required by NRC Region III on this critical activity.
Designation 3 in the right hand column indicates that the activity is not critical and work can proceed.
The date shown after the designation corresponds to the date of the NRC letter that provided the designation.
5 An "A" following the designation indicates that. Region III has provided approval to proceed with the activity. The date following the "A" corresponds with the date of the NRC letter that provides authorization to proceed with the work activity.