ML20090B307

From kanterella
Jump to navigation Jump to search
Forwards Hn Singh Testimony for ASLB Hearings Re Diesel Generator Bldg & Svc Water Pump Structure & Wc Otto Testimony Re Diesel Generator Bldg
ML20090B307
Person / Time
Site: Midland
Issue date: 11/16/1981
From: Mccallister P
ARMY, DEPT. OF, CORPS OF ENGINEERS
To: Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML17198A223 List: ... further results
References
CON-BOX-13, FOIA-84-96 NUDOCS 8202050092
Download: ML20090B307 (1)


Text

- - - - -

r rb

,;6,;

(.

U i

o A

DEPARTMENT OF THE ARMY DETRCf70eSTRecT. COAPS OP useetsenne 90E 102F DETROIT.88tCMIGA88 44331 A IN OF 16 NOV :9:?

NCEED-T SUBJECE: Testimony for ASLB Hearings, Midland Nuclear Power Plant -

Diesel Generator Building and Service Water Pump Structure THRU:. Commander, North Central Division ATTN: NCDED-G (James Simpson)

N TO '

Mr. George Lear U. S. Nuclear Regulatory Commission Chief, Hydrologic and Geotechnical Engr. Br.

Division of Engineering Mail Stop P-214 Washington, DC 20555 The testimony of Mr. Hari N. Singh for the Atomic Safety and Licensing Board heariags pertaining to the Diesel Generator Building and Service Water Pump Structure is inclosed.

The testimony of Mr. William C. Otto pertaining to the Diesel Generator Building is also.uclosed.'

FOR THE CDMMANDER:

n

);)) 9 lO r A [

\\\\s W

t (. l'

.) Incl P. McCALLISTER, P.E.

as Chief, Engineering Division 4

l i

p~s~

g+

i

{

p~-

yea 9;t99R999125

-l

~

-- =.=

x

-