SUBJECT:
TRAtlSMITTAL OF C0flSULTAflT'S TESTIMONY -
4 GE0 TECHNICAL ENGINEERING
/
U Plant Name: Midlar.d Plants Units 1 and 2 Licensing Stage:
Post CP Docket tiumbers:
50-329/330 Responsible Branch: LD No. 4 D. liood, LPM The enclosed transmittal letters (dated floyember 23, 1981 and December 8, 1981) with enclosures have been received from our consultant, the U.S.
Amy Corps of Engineers, and are forwarded to DL for docketing.
The ecciosures provide the testimony of !!. Singh for the Diesel Generator Cuilding, Service !!ater Pump Structure and Auxiliary Guilding and the testimony of W. Otto for the Diesel Generator Building.
f:0 further action, other than docketing, is. required of DL because the submitted Corps of Engineers (COE) testimon will be coordinated with NRC Staff testimony by GES and a composite OE-f!RC testimony will be prepared for ultimate submittal to OELD to meet the scheduled ASLB hearing
// W Original signed by George Lear George Lear, Chief flydrologic and Geotechnical Engineering Branch Division of Engineering
Enclosures:
1.
Ltr from Goodwin to Lear w/2 enc 1s., Nov. 23.. 398 2.
Ltr from Goodwirpto Lear w/2 encls., Dec'. 8,1981 8202050085 '
t cc: See page 2 i
M ome >..EEUDE E
MEMDI'
,.MED.:.9
! sunwas)
.JKane/m LHell GLear
=
.U 5.1.a2 -
1/f/.a2
.1/.5 /.B2...
om)
..=
(,
k^-
. 1
[
q..,'
r Elinor G. Adensam JAN 5 L982 cc: w/o enclosures R. Vollmer J. Knight G. Lear L. Heller w/ enclosures
~
E. Sullivan W. Paton D. Hood J. Kane
'L HGEB Contract File e
e e
i e
i 1
\\
4 O
L
' g -
S -
g a
__