Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M1851999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates JPN-99-035, Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 11999-10-15015 October 1999 Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 JPN-99-034, Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping1999-10-13013 October 1999 Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping JPN-99-033, Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon1999-10-0808 October 1999 Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon JPN-99-030, Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days1999-09-29029 September 1999 Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days JPN-99-032, Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request1999-09-29029 September 1999 Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request ML20212F8341999-09-22022 September 1999 Forwards Insp Rept 50-333/99-07 on 990718-0828.No Violations Noted JAFP-99-0262, Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl1999-09-16016 September 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics 05000333/LER-1998-015, Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete1999-09-0808 September 1999 Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues JAFP-99-0258, Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld1999-09-0808 September 1999 Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld JPN-99-028, Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity1999-08-30030 August 1999 Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity JAFP-99-0247, Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 41999-08-26026 August 1999 Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 4 JAFP-99-0245, Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 19991999-08-19019 August 1999 Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 1999 ML20210U2621999-08-12012 August 1999 Forwards Insp Rept 50-333/99-06 on 990601-0717.No Violations Noted JPN-99-025, Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams1999-08-0505 August 1999 Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams JPN-99-026, Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds1999-08-0505 August 1999 Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds ML20216D9421999-07-28028 July 1999 Forwards Safety Evaluation Granting Requests for Relief from Requirements of ASME Code,Section XI for Second 10-year ISI Interval for James a FitzPatrick NPP JAFP-99-0229, Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1)1999-07-22022 July 1999 Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1) JAFP-99-0228, Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal1999-07-21021 July 1999 Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal ML20210A7001999-07-16016 July 1999 Forwards Request for Addl Info to Supplement Response Provided for GL 97-05, Steam Generator Tube Insp Techniques JAFP-99-0208, Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl1999-07-14014 July 1999 Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl ML20209D5511999-07-0606 July 1999 Informs That as Result of NRC Review of Licensee Response to GL 92-01,rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210C9031999-06-30030 June 1999 Summarizes Impact of Changes & Errors in Methodology Used by GE to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.Summary of Changes & Errors Provided in Attached Table JPN-99-021, Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend1999-06-22022 June 1999 Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend JPN-99-020, Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept1999-06-21021 June 1999 Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept ML20196G2981999-06-18018 June 1999 Forwards Insp Rept 50-333/99-04 on 990412 to 0529.Violations Being Treated as non-cited Violations ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First JPN-99-019, Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant1999-06-15015 June 1999 Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant ML20196L1451999-06-0707 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ss Bajwa Will Be Section Chief for Ja Fitzpatrick & Indian Point NPPs JPN-99-018, Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1)1999-06-0101 June 1999 Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1) ML20207D9191999-05-27027 May 1999 Informs That on 990521 NRC Staff Held Planning Meeting to Identify Insp Activities at Facility Over Next Six Months JAFP-99-0171, Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr1999-05-20020 May 1999 Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr JPN-99-016, Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl1999-05-19019 May 1999 Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl ML20207A6751999-05-17017 May 1999 Forwards RAI Re 960626 Submittal & Suppl Related to IPEEEs for Plant.Licensee Committed to Revise Plant Fire IPEEE to Reflect Issues Associated with EPRI Fire PRA Implementation Guide within 120 Days of Issues Resolution JAFP-99-0168, Forwards Eight Operator License Renewal Applications for Listed Individuals.Without Encls1999-05-13013 May 1999 Forwards Eight Operator License Renewal Applications for Listed Individuals.Without Encls ML20206N0721999-05-11011 May 1999 Forwards Insp Rept 50-333/99-03 on 990301-0411.Four Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy JAFP-99-0160, Forwards 1998 Annual Radiological Environ Operating Rept for Ja FitzPatrick Nuclear Power Plant. Distribution for Rept Is IAW Reg Guide 10.1,Rev 41999-04-30030 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Ja FitzPatrick Nuclear Power Plant. Distribution for Rept Is IAW Reg Guide 10.1,Rev 4 ML20206C8551999-04-27027 April 1999 Informs That Util 990406 Submittal, Licensing Rept for Reracking of Ja FitzPatrick Spent Fuel Pool,Rev 7, Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) ML20205T1141999-04-22022 April 1999 Provides Comments from Technical Review of Draft Info Notice Re Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station,Unit 2,ANO,Unit 2 & JAFNPP JPN-99-012, Informs That Authority Identified Typographical Error on Page 3 of Attachment 3 of 990331 Response to NRC RAI Re App R.Corrected Response to NRC Question 3 Is Attached1999-04-16016 April 1999 Informs That Authority Identified Typographical Error on Page 3 of Attachment 3 of 990331 Response to NRC RAI Re App R.Corrected Response to NRC Question 3 Is Attached ML20205P4641999-04-15015 April 1999 Forwards for Review & Comment Draft Info Notice That Describes Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station Unit 2,Arkansas Nuclear One Unit 2 & Ja Fitzpatrick NPP ML20205P1991999-04-0909 April 1999 Discusses 990224 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review JAFP-99-0129, Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick1999-04-0909 April 1999 Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick JAFP-99-0127, Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld1999-04-0808 April 1999 Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld JAFP-99-0124, Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1)1999-04-0707 April 1999 Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) ML20205M8941999-04-0707 April 1999 Forwards Rev 21 to App C of JAFNPP Emergency Plan & Rev 1 to EAP-32, Recovery Support Group Manager JAFP-99-0125, Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1)1999-04-0707 April 1999 Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARJPN-99-035, Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 11999-10-15015 October 1999 Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 JPN-99-034, Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping1999-10-13013 October 1999 Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping JPN-99-033, Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon1999-10-0808 October 1999 Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon JPN-99-030, Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days1999-09-29029 September 1999 Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days JPN-99-032, Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request1999-09-29029 September 1999 Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request JAFP-99-0262, Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl1999-09-16016 September 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl JAFP-99-0258, Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld1999-09-0808 September 1999 Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld 05000333/LER-1998-015, Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete1999-09-0808 September 1999 Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete JPN-99-028, Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity1999-08-30030 August 1999 Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity JAFP-99-0247, Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 41999-08-26026 August 1999 Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 4 JAFP-99-0245, Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 19991999-08-19019 August 1999 Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 1999 JPN-99-025, Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams1999-08-0505 August 1999 Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams JPN-99-026, Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds1999-08-0505 August 1999 Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds JAFP-99-0229, Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1)1999-07-22022 July 1999 Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1) JAFP-99-0228, Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal1999-07-21021 July 1999 Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal JAFP-99-0208, Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl1999-07-14014 July 1999 Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl ML20210C9031999-06-30030 June 1999 Summarizes Impact of Changes & Errors in Methodology Used by GE to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.Summary of Changes & Errors Provided in Attached Table JPN-99-021, Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend1999-06-22022 June 1999 Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend JPN-99-020, Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept1999-06-21021 June 1999 Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept JPN-99-019, Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant1999-06-15015 June 1999 Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant JPN-99-018, Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1)1999-06-0101 June 1999 Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1) JAFP-99-0171, Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr1999-05-20020 May 1999 Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr JPN-99-016, Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl1999-05-19019 May 1999 Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl JAFP-99-0168, Forwards Eight Operator License Renewal Applications for Listed Individuals.Without Encls1999-05-13013 May 1999 Forwards Eight Operator License Renewal Applications for Listed Individuals.Without Encls JAFP-99-0160, Forwards 1998 Annual Radiological Environ Operating Rept for Ja FitzPatrick Nuclear Power Plant. Distribution for Rept Is IAW Reg Guide 10.1,Rev 41999-04-30030 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Ja FitzPatrick Nuclear Power Plant. Distribution for Rept Is IAW Reg Guide 10.1,Rev 4 ML20205T1141999-04-22022 April 1999 Provides Comments from Technical Review of Draft Info Notice Re Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station,Unit 2,ANO,Unit 2 & JAFNPP JPN-99-012, Informs That Authority Identified Typographical Error on Page 3 of Attachment 3 of 990331 Response to NRC RAI Re App R.Corrected Response to NRC Question 3 Is Attached1999-04-16016 April 1999 Informs That Authority Identified Typographical Error on Page 3 of Attachment 3 of 990331 Response to NRC RAI Re App R.Corrected Response to NRC Question 3 Is Attached JAFP-99-0129, Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick1999-04-0909 April 1999 Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick JAFP-99-0127, Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld1999-04-0808 April 1999 Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld JAFP-99-0124, Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1)1999-04-0707 April 1999 Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) JAFP-99-0125, Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1)1999-04-0707 April 1999 Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) ML20205M8941999-04-0707 April 1999 Forwards Rev 21 to App C of JAFNPP Emergency Plan & Rev 1 to EAP-32, Recovery Support Group Manager JPN-99-011, Forwards Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will Delegate Responsibilities to Another Staff Member,In Writing1999-04-0505 April 1999 Forwards Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will Delegate Responsibilities to Another Staff Member,In Writing ML20205G4111999-03-31031 March 1999 Forwards Rev 7 to JAFNPP EP App J & Rev 6,pages 7 & 8 to EAP-5.3 05000333/LER-1999-001, Forwards LER 99-001-01 Re Incorrect EDG line-up During Fire Placing Plant in Outside Design Basis.Suppl Contains Results of Completed Root Cause Evaluations & Subsequent Corrective Actions Taken.Rept Contains No Commitments1999-03-31031 March 1999 Forwards LER 99-001-01 Re Incorrect EDG line-up During Fire Placing Plant in Outside Design Basis.Suppl Contains Results of Completed Root Cause Evaluations & Subsequent Corrective Actions Taken.Rept Contains No Commitments JPN-99-008, Forwards Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433, Rev 1.Synopsis of LAR for Conversion to Its,Pending Lars, List of Subsections,Scope of Changes & Commitments,Encl1999-03-31031 March 1999 Forwards Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433, Rev 1.Synopsis of LAR for Conversion to Its,Pending Lars, List of Subsections,Scope of Changes & Commitments,Encl JPN-99-010, Transmits Revised Exemption Request from Some of Requirements of 10CFR50,App R.Exemption Would Permit Use of CS for Rc Makeup to Achieve Safe Shutdown in Fire Area XI at JAFNPP1999-03-31031 March 1999 Transmits Revised Exemption Request from Some of Requirements of 10CFR50,App R.Exemption Would Permit Use of CS for Rc Makeup to Achieve Safe Shutdown in Fire Area XI at JAFNPP JAFP-99-0114, Requests That License OP-11037,for Bs Brooks,Be re-issued Without Restriction for Corrective Lenses.Nrc Form 369,encl. Without Encl1999-03-29029 March 1999 Requests That License OP-11037,for Bs Brooks,Be re-issued Without Restriction for Corrective Lenses.Nrc Form 369,encl. Without Encl JAFP-99-0112, Informs of Util Determination That Listed Individuals No Longer Need to Maintain Operating License for Ja FitzPatrick Nuclear Plant.Termination of Listed Licenses,Requested1999-03-29029 March 1999 Informs of Util Determination That Listed Individuals No Longer Need to Maintain Operating License for Ja FitzPatrick Nuclear Plant.Termination of Listed Licenses,Requested JAFP-99-0097, Forwards JAFNPP Referenced Simulation Facility Four Year Performance Testing Rept, Containing Description of Performance Testing Completed During Past Four Years & Description of Testing Scheduled During Next Four Years1999-03-17017 March 1999 Forwards JAFNPP Referenced Simulation Facility Four Year Performance Testing Rept, Containing Description of Performance Testing Completed During Past Four Years & Description of Testing Scheduled During Next Four Years ML20204B6241999-03-17017 March 1999 Forwards Plant Referenced Simulation Facility Four Year Performance Testing Rept, Per 10CFR55.45(b)ii 05000333/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73(a)(2)(i)(B).One New Commitment Is Contained in Rept1999-03-16016 March 1999 Forwards LER 99-003-00,per 10CFR50.73(a)(2)(i)(B).One New Commitment Is Contained in Rept ML20204C7371999-03-15015 March 1999 Forwards Revised EP Coversheets for Sections to Vol 1 & Rev 26,Vol 3 to EPIP SAP-10, Meteorological Monitoring Sys Surveillance JAFP-99-0085, Submits in-vessel Visual Insp Summary Rept for RFO 13 for Ja FitzPatrick Nuclear Power Plant.All Relevant Indications Recorded During Insp Were Satisfactorily Dispositioned IAW Util Internal C/A Tracking Sys & Were Found Acceptable1999-03-0808 March 1999 Submits in-vessel Visual Insp Summary Rept for RFO 13 for Ja FitzPatrick Nuclear Power Plant.All Relevant Indications Recorded During Insp Were Satisfactorily Dispositioned IAW Util Internal C/A Tracking Sys & Were Found Acceptable ML20207J3201999-03-0505 March 1999 Forwards Form NRC-369,requesting That Restriction for Corrective Lenses Be Placed on Current License SOP-10089-3, for Ks Allen.Encl Withheld Per 10CFR2.790(a)(6).Without Encl JAFP-99-0073, Submits Annual Rept on SRV Challenges & Failures,Per Plant TS 6.9.A.2.b.No Challenges to SRVs from Automatic Control Circuits or from RCS Pressure Transients,Occurred.Ltr Contains No New Commitments1999-02-26026 February 1999 Submits Annual Rept on SRV Challenges & Failures,Per Plant TS 6.9.A.2.b.No Challenges to SRVs from Automatic Control Circuits or from RCS Pressure Transients,Occurred.Ltr Contains No New Commitments JAFP-99-0071, Forwards Semi-Annual Radioactive Effluent Release Rept for Period of 980701-1231. Format Used for Effluent Data Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 41999-02-25025 February 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for Period of 980701-1231. Format Used for Effluent Data Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 4 JAFP-99-0068, Forwards Form NRC-5 Equivalent Records of All Individuals Monitored at JAFNPP from 980101-1231 on Electronic Media, Per 10CFR20.2206(b) & App a of NRC Reg Guide 8.7, Instruction for Recording & Reporting..1999-02-22022 February 1999 Forwards Form NRC-5 Equivalent Records of All Individuals Monitored at JAFNPP from 980101-1231 on Electronic Media, Per 10CFR20.2206(b) & App a of NRC Reg Guide 8.7, Instruction for Recording & Reporting.. JAFP-99-0019, Informs of Licensee Intent to Upgrade ERDS at Ja FitzPatrick in Preparation for Year 2000 (Y2K) Readiness,Per GL 98-01. Encl Contains Brief Summary of Proposed Changes to ERDS1999-01-25025 January 1999 Informs of Licensee Intent to Upgrade ERDS at Ja FitzPatrick in Preparation for Year 2000 (Y2K) Readiness,Per GL 98-01. Encl Contains Brief Summary of Proposed Changes to ERDS JAFP-99-0012, Documents Util Position Re Methodology for LPRM Calibr During Reactor Operation Using Traversing In-core Probe Sys1999-01-18018 January 1999 Documents Util Position Re Methodology for LPRM Calibr During Reactor Operation Using Traversing In-core Probe Sys 1999-09-08
[Table view] |
Text
y-(- .,
t g 123 Mmo Street
'- White Picins,Wew York 10601 .
014 481-6840 !
914-287 3309 (FAX)
N William J. Cahill, Jr.
.&hQ( Cn>cf Nuclear o*ficer June 29,1995 JPN-95-032 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, DC 20555 Subject. James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Submittal of Plant Specific Licensing Topical Report for Long-Term Solution on Reactor Stability 1 Generic Letter.94-02)
References:
- 1) "BWR Owners Group Long-Term Stability Solutions Licensing Methodology," NEDO-31960, June 1991, and NEDO-31960 Supplement 1, March 1992.
- 2) NYPA letter, W. J. Cahill, Jr. to NRC (JPN-94-046), " Response to
'eneric Letter 94-02 Regarding Thermal-Hydraulic Instabilities in Boiling Nater Reactors," dated September 9,1994.
Dear Sir:
This letter transmits the plant specific Ucensing Topical Report (LTR) for the James A.
FitzPatrick Nuclear Power Plant which contains the final analysis to demonstrate the application of the " Regional Exclusion with Flow-Biased APRM Neutron Flux Scram" Stability Solution (Option 1-D) of Reference 1. The LTR concludes that compliance with the applicable General Design Criterion is met with the Option 1-D solution for the FitzPatrick plant. This submittal is in response to commitment JPN-94-046-04 (Reference 2).
The Authority stated in Reference 2 that the Option 1-D solution will be augmented with the installation of an on-line stability monitor, and that a description of this monitor would be included in the plant specific LTR. Since Reference 2 was submitted, additional on-line stability monitoring products have become available. Because the Authority is currently selecting the type of monitor to be implemented at the FitzPatrick plant, this description is not included in this submittal. .
t A description of the on-line stability monitor and proposed Technical Specification changes resulting from the implementation of Option 1 D will be submitted to the NRC by i March 31,1996. There are no changes to the remaining long-term actions desenbed in Reference 2.
kr 9507050231 DR 930629 /~ I I p ADDCK 0500o333 PDR
\t $
f
\Y
p-g, The Licensing Topical Report is submitted as Attachment 1. In accordance with the provisions of 10 CFR 2.790, this report contains proprietary information which should be
!. withheld from public disclosure. Attachment 2 is the General Electric affidavit attesting to this proprietary information. A non-proprieta y copy of the LTR is provided in Attachment 3. The Authority's commitments associated with this submittal tre summarized in Attachment 4.
If you have any questions, please contact Mr. A. Zaremba.
Very truly yours, f
w William J. Luil, Jr.
Chief Nuclear Officer Attachments: As stated cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. C. E. Carpenter, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/II U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555
1 ATTACHMENT 11 TO JPN-95-032 General Electric Company Affidavit of Mr. George B. Strambsk With ResnecLto_P_toprietary Information New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50-333 DPR-59
L o
~
General Electric Company AFFIDAVIT I, George B. Stramback,l'eing duly sworn, depose and state as follows:
(1) I am Project Manager, Licensing Services, General Electric Company ("GE") and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(2) The information sought to be withheld is contained in the GE proprietary report GENE-637-044-0295, Application of the " Regional Exchision With Flow-Biased APRM Neutron Fhix Scram" Stability Solution (Option 1-D) to the James A.
Fit: Patrick Nuc/ car Power Plant, Class III (GE Proprietary Information), dated February 1995. The proprietary information is delineated by bars marked in the margin adjacent to the specific material.
(3) In making this application for withholding of proprietary information of which it is the owner, GE relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act,18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4), 2.790(a)(4), and 2.790(d)(1) for " trade secrets and commercial or financial information obtained from a person and privileged or confidential" (Exemption 4). The material for which exemption from disclosure is here sought is all " confidential commercial information",
and some portions also qualify under the narrower definition of" trade secret", within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Enerav Project v. Nuclear Reculatory Commission.,
975F2d871 (DC Cir.1992), and Public Citizen Health Research Grouo v. FDA, 704F2d1280 (DC Cir.1983).
(4) Some examples of categories of information which fit into the definition of proprietary information are:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention ofits use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies;
- b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; GBS95-2-afstabl6. doc Affidavit Page 1
r; ,
- c. Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of General Electric, its customers, or its suppliers;
- d. Information which reveals aspects of past, present, or future General Electric customer-funded development plans and programs, of potential commercial value to General Electric;
- e. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
The information sought to be withheld is considered to be proprietary for the reasons set forth in both paragraphs (4)b. and (4)d., above.
(5) The information sought to be withheld is being submitted to NRC in confidence. The information is of a sort customarily held in confidence by GE, and is in fact so held.
The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GE, no public disclosure has been made, and it is not available in public sources. All disclosures to third parties including any required transmittals to NRC, have been made, or must be made, pursuant to regulatoy provisions or proprietary agreements which provide for maintenance of the information in confidence. Its initial designation as proprietary information, and i the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in paragraphs (6) and (7) followir.g.
1 (6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge. Access to such documents within GE is limited on a "need to know" basis.
(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his delegate), and 3 by the Legal Operation, for technical content, competitive effect, and determination 1 of the accuracy of the proprietary designation. Disclosures outside GE are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements.
(8) The information identified in paragraph (2), above, is classified as proprietary because it contains detailed results of analytical models, methods and processes, including computer codes, which GE has developed, obtained NRC approval of, and applied to perform thermal hydraulic stability performance evaluations for the BWR.
GBS95-2-afstabl6. doc Afridavit Page 2
The development and approval of the stability analysis computer codes und 'st this analysis was achieved at a significant cost, in excess of one-half million 3;tlars, to GE.
I The development of the evr.luation process along with the interpretation and application of the analytical results is derived from the extensive experience database that constitutes a major GE asset.
(9) Public disclosure of the information sought to be withheld is likely to cause ;
substantial harm to GE's competitive position and foreclose or reduce the availability of profit-making opportunities. The information is part of GE's comprehensive BWR safety and technology base, and its commercial value extends beyond the original development cost. The value of the technology base goes beyond the extensive physical database and analytical methodology and includes development of the expertise to determine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.
The research, development, engineering, analytical and NRC review costs comprise a '
substantial investment of time and money by GE.
The precise value of the expertise to devise an evaluation process and apply the :
correct analytical methodology is diflicult to quantify, but it clearly is substantial.
GE's competitive advantage will be lost ifits competitors are able to use the results of the GE experience to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.
The value of this information to GE would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GE of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in '
developing these very valuable analytical tools.
GBS95-2-afstabl6. doc Aflidavit Page 3
7 STATE OF CALIFORNIA )
) ss: >
COUNTY OF SANTA CLARA )
George B. Stramback, being duly sworn, deposes and says:
i That he has read the foregoing affidavit and the matters stated therein are true and correct to the best of his knowledge, information, and belief.
)
Executed at San Jose, California, this O PM day of FM 1995. !
/ .
n .-
~~bML b N$
Go6rge Bdtramback ;
General Electric Company i
Subscribed and sworn before me this c6L day ofviV-643(AMt 1 1995. .
(E i PAULA F. HUSSEY l us?a"l"LL
^
! Q a % a k sea Notary Public, State of Califdnia
{ wcE$[^ $c"b998 (
I l
1 i
GBS95-2-afstabl6. doc Aflidavit Page 4
7.
7 . fL i'
ATTACHMENT 111 TO JPN-95-032 i
Application of the " Regional Exclusion With Flow-Biased APRM Neutron Flux Scram" I Stability Solution (Option 1-D) to the James A. FitzPatrick Nuclear Power Plant Licensing Topical Report NON-PROPRIETARY COPY
^
'i t
1 1
i J
New York Power Authority J J
JAMES A. FITZPATRICK NUCLEAR POWER PLANT l Docket No. 50-333 DPR-59 l
USION EXCL FLUX
- GIONAL ON OF THE"RE NEUTR TIONID)
A TIONW BIA SED PRMUTION(OPTRICK SOL APPLICA FL WITH BILITYMES A.FITZPA M "OSTA THE JA RPO WER PLANT SCRA TO NUCLEA TopicalReport Licensing February 1995 Preparedby rEnergy GENuclea 0i Y/ ager Projects vedby: S. Post,ProjectMannEngine Appro ystemIntegratio
-