83-037/03L-0:on 831005,during Daily Battery Surveillance, 250-volt Battery Charger Float Voltage Indicated Improper Float Voltage.Caused by Defective Amplifier Board.Defective Board Replaced
ML20081M202
Person / Time
Site: Dresden Constellation icon.png
Issue date: 11/02/1983
From: Ata H, Scott D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
83-1062, LER-83-037-03L-05, LER-83-37-3L-5, NUDOCS 8311170136
Download: ML20081M202 (3)


Text

-__

LICENSEE EVENT REPORT i

lh CCNTROL BLOCK: l l l l l l (Pt. EASE PRINT OR TYPE ALL REQUIRED INFORMATIONI i

e

.'; o I8i 9l l 1 lUCENSEE L l DCODE l R lS14l 3 15l@l 0 l 0 l- l0 l0 l0 l 0 l 0 l - l 010 UCENSE NumeER 25 l@l26 4 UCENSE l 1 l 1TYPE l 1 JO l 1 l@l 57 CAT 54l@

l CCN'T

?

oIij 8

Q.',"T60 l L }@l 0 lCOCXET 61 5 l 0NuMgEM l 0 l0 l2 l4l9l@l 110J0l5l8l3l@l1l110l2l8l3l@

68 69 i

EVENT CATE 74 75 REPCMT QATE 80 g

EVENT DESCRIPT1CN AND PROBA8LE CONSEQUENCES h

.t o l a t l While performing daily bat terv surveillance (DOS 6900-1) it was found that Unit 3, I o i s i l 250 volt battery charger float voltage is reading 243v while the proper float vol'tage l io i A; l is 261v. The charger equalizing voltage was also checked and found to read 243v while .l 10151 l the proper equalizing voltage is 270v, Since the 250v battery and the Unit 2/3 l

't o is l l charger were operable, safety significance was minimal. Similar occur ~rence was reported ;

l0l7l l by DVR~#12-3-78-49 l

J o ta l I I

": a9 so -

SYSTEM CAuSE CAUSE CooE COMP. VALVE Coot - suecoot COMPONENT CODE SU susCoos

,10191 7 8 l : E lC lh Wh Wh l Bl A! TI Tl R l Y lh lSCODElh 9 to 11 12 13 18 19 Z

20 Wh SEcuSNTIAL CCOURRENCE MEPony Revision LER EVENTYEAR R EPORT NO. CODE TYPE NO.

h ajug/RO y l8l3l l-l l013l7l l/l l 0 l 3 l' lL l, l--l l0l 21 22 23 24 25 27 28 29 30 31- 32 r

  1. $!N" ACWC C t T M

^ "" '

MouR5 3 e I17 Po"RM 8. Su"PP MA u"P7 REA l4 Z l@ l 0 l 0 l 0 @ll Nlg 0 l l N lg l XI@ lP l3 l1 l 9 lj l33 Al@l34Z l@ l Z lg 35 3 37 40 41 42 43 44 47 CAUSE DESCRIPTTON AND CCRRECTIVE ACTIONS @ f.

il 6 01 I It was determined that the amolifier board was defective. The defective board was I i: li I i replaced and the unit w'as returned to service. The float voltace was set at 261 volts I

, ,12 ; l and the equalizing voltage was set at 270 volts. No further action is required. I i 6 31 'l I t4II i a 9 30

% POWER OTNEM STATUS Os EM DISCOVERY DESCRIPTION 8 $ l l H lh l Ol 0 l 012l@l N/A l lAl@l Operator Observation l a4 ig is 44 4s 4s 30.

est.sAsEo cP ret. EASE LocAT1ow op REtaAst h i s**l l Z l @ 'l Zl@l N/AAMounToP AcTiv "

l TY h l N/A l

  • ERseNu[i. ExPosuAEs "

NuusER rYPE oEsCRimon h

' i 711l 0 l 0 l 0' l@l Zl@l N/A l

  • EmsoNuti.'iNau'EiEs "

NuMeER cESCRIPTION@

i 3 l l 0 l 0 l 0 l@l N/A 9311170136 831102 PDR ADOCK 05000249 l CSS OP OR 0 ACE OPAC3UTY S PDR "

Tvet CESCRIPTION N/A

  • I 9. l2l Z l@lio l
loj I N issuf E CRtPTION l N/A h I e

4 9 10 68 69 ll ll llllll lIli

30. g 1

,/ m D / X DEVIATION REPORT g ',' Commonwealth Edison DvR NO. 12 -

3 - 83 -

73 N / STA UNIT YEAR NO.

PART Il TITLE OF DEYl ATION OCCURRED 10/5/83 2200 Unit 3 250v DC Battery CharOer Failure cATE TivE SYSTEM AFFECTED 6900 PLANT STATUS AT TIME OF EVENT TESTING

/ DC uoDg Shutdown , p a gu,7 3 0 . LOAD (MAE) 0 yO, g DESCRIPTION OF EVENT equalize or float charge. Unit 2/3 charger switched over to Unit 3 battery.

O 10 CFR50.72 NRC RED PHONE @

NOTIF IC ATION MADE YES NO EQUIPMENT FAILURE D30698 GYES O NO .ORx REOUEST NO. RESeONSiBtE SueERviSOn M. Korchynsky g,7g 10/5/83 PART 2 l OPERATING ENGINEER'S COMMENTS When the Unit 3 250 voit DC battery charger failed, the Unit 2/3 250 volt DC battery charger was switched into service; at that point all 250 volt DC system Technical Specification requirements were satisfied.

EVENT OF PUBLIC I N TE REST C 24-HOUR NRC NOTIFICATION REO*D TECH. SPEC. VIOLATION TELEPH N/A NON REPORTABLE OCCURRENCE TELEGM/TELECOPY N/A 14 DAY REPORTABLE /T.S. REGION lil DATE TIME

] 30 DAY REPORTABLE /T.S.

  • CECO CORPORATE NOTIFICATION MADE ANNUAL /SPECL REPORT REO'D IF ABOVE NOTIFICATION IS PER IOCFR21 A.I.R. #

0 5+ DAY WRITTEN REPORT REO'D PER 10CFR21

'L.E.R. ,83-37/03L-0 Telecopy ex Dennis P. Galle 10/20/83 1359 CECO CORPORATE OFFICER DATE TIME PRELIMINARY REPORT COMPLETED AND REVIEnED T.A. Cisla 10/20/83 OPERAtlNG ENGINEER DATE iliVESTiGATED REPORT & RESOLUTION ACCEPTED BY STATION REVIEW A N* ged W

U sA 2-\ n . & /P3 RESOLUTION APPROVED AND [ fr ,

AUTHOR 1 ZED FOR DISTRIBUTlON 4 6. S 1 *, e (FORW t5-52.ti 10-8I gj-

I e

C;..

N C0fninonweah Edison

) Dresden Nuclerr Power Sttion jgg

-m

  • ~' f RR.#1 7

/ Morris, Hlinois 0@E0 )

\s f s Tokphorm 815/942-2 20 ,

1 November 2, 1983 DJS Ltr #83-1062

James G. Keppler, Regional Administrator Region til U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Reportable Occurrence Report #83-37/03L-0, Docket #050-249 is being submitted to your office in accordance with Dresden Nuclear Power Station Technical Specification 6.6.B.2.(b), conditions leading to operation in a degraded mode permitted by a limiting condition for operation or plant shutdown required by a limiting condition for operation.

J Co D . Scott Station Superintendent Dresden Nuclear Power Station

  • DJS/kjl Er.cl osure cc: Director of Inspection & Enforcement l' Director of Management Information & Program Control

! U.S. NRC, Document Management Branch File /NRC s

I iN I zarI