ML20066D530

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 6.4.1 Re Training/Replacement Training Program for Licensed Operators
ML20066D530
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/08/1991
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20066D529 List:
References
NUDOCS 9101150136
Download: ML20066D530 (2)


Text

__ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

ATTACllMENT 2 PROPOSED TECilNICAL SPECIFICATION 6.4.1 Ai,0 5 N14 9101150136 910108 PDR ADOCK 05000408 P PDR

AlTA0HMENT A

  • ST HL AE 3650 hDMM51RWUJOR1AQL ,,sm,_____ ___ JAGLm y ,op ,f, 6.4 TRAINING 4

6.4.1 A retraining and replacement training program for the unit staff shall i be maintained under the direction of the Training Manager and shall meet or '

exceed the requirements and recommendations of Section 6.5 of ANSI N18.1-1971 and Append 4x-A-of 10 CFR Part bb -and-tho-supplemental-r+9uksen(+-+pM44d4+

Soc 44cn64-and.C-of4nclosure-14f-thaJiar4h48,4980 NRC !+tter-to-al44tcensem l

[ and shall include familiarization with relevant industry operational experience.

l 6.5 RIVIEW AND_AUDli 6.5.1 -PLANT OPERATIONS REVIEW COMMITTEE (PORC) -

TUNC110N 6.5.1.1 The PORC shall function to advise the Plant Manager on all matters '

related to nuclear safety. I COMPOSITION 6.5.1.2 The PORC shall be composed of the:

Plant Superintendent Member:

Member: Technical Scryices Manager Member: Plant Operations Manager Member: Plant Engineering Manager

- Member: Maintenance Manager '

Member: Quality Engineering Manager The PORC Chairman shall be appointed in writing from among these members by the Plant Manager, except for the Quality Engineering Manager. If the Technical Services Manager does not meet the qualifications of a Radiation Protection Manager as defined in Regulatory Guide 1.8 (Personnel Selection and i Training-Revision 1-R), then the PO<C composition will include the Health Physics Manager.

A_l.1[RNAlIS

6. 5.1. 3 All alternate members shall be appointed in writing by the Plant Manager to serve on a temporary basis; however, no more than two alternates shall participate as voting members in PORC activities at any one time.

ME1TMG.lREQUENCY 6.b.l.4 The PORC shall meet at least once per calendar month and as convened by the PORC Chairman or his designated alternate.

' QUORty l .

6.5.1.5 The quorum of the PORC necessary for the performance of the PORC

-responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or his designated alternate and three other members including alternates.

l SOUTH llXAS - UNITS 1 & 2 6-7 Unit 1 - Amendment No. 4 l

1 l

w ,, , a % ...w,,- ..,-y, . . - + - m

..w.. ,--

,p.a ~.< - -,ep4 , - - , - u o%,. .,es--- -m-, -sv--~ w