MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
T-i ,, --.-
Pilgnm Nuclear Power Station Rocky Hdi Road -
I Plymouth, Massachusetts 02360 '
October to ,1990-BECo Ltr._ 1 90- 120 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Hashington, DC 20555
{
License No. DPR-35.
Docket No. 50-293
Subject:
September 1990 Monthly Report l I
Dear Sir:
In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning. Should you have any questions concerning this report please-contact me directly. .
Station Director-and Vice President, Nuclear Operations GJB/bal
-Attachment cc: Regional Administrator, Region 1 '
U.S. Nuclear Regulatory Commission <
475 Allendale Rd. >
King of Prussia, PA 19406 i
Senior Resident Inspector O
dfW 9010160291 900930 PDR ADOCK 05000293 9 '\
1 l
R PDC b b kib
AVERAGE DAILY UNIT P0llER LEVEL DOCKET NO. 50-293 +
UNIT Pilarim 1-DATE- n-emum, in ioon
~
COMPLETED BY G. Bai11esco ~~ R TELEPHONE (508) 747-8S34- I MONTH Sentember 1990 DAY AVERAGE DAILY P0HER LEVEL DAY AVERAGE DAILY P0HER LEVEL (MHe-Net) (MHe-Net) 1 654 -17 0 2 617 18 0 3 0 19 0 1
4 0 20 0 5 0 21 0 6 0 22 0-7 0 23- 0 8 0 24 0 j 9 0 25 136 10 0 26 502 11 0 27 633 ;
12 0 28 '661 l 13 0 29 504 i
14 0 30 639 i 15 0 31 N/A 1 16 0 !
This format lists the average daily unit power level in MHe-Net for'each day -
in the reporting month, computed to the_ nearest whole megawatt. i
'I
OPERATING DATA REPORT-DOCKET NO.- 50-293' DATE -October 10. 1990 COMPLETED BY G. Basilesco-TELEPHONE (508) 747-8534 R OPERATING STATUS Notes
- 1. Unit Name Pilarim 1 '
- 2. Reporting Period .Sentember 1990 l
- 3. Licensed Thermal Power (MHt) 1998
- 4. Nameplate Rating (Gross MHe) 678 i
- 5. Design Electrical Rating (Net MHe) 655 <
- 6. Maximum Dependable Capacity (Gross MHe) 696
- 7. Maximum Dependable Capacity (Net MHe) 670
- 8. If Changes Occur in Capacity Ratings (Items . Number 3 Through 7) Since Last Report. Give Reasons:
1 None
.i
- 9. Power Level To Hhich Restricted, If Any (Net MHe) __. None
- 10. Reasons For Restrictions, If Any N/A This~ Month Yr-to-Date' Cumulative
- 11. Hours In Reporting Period 720.0 6551.0 156119.0 !
- 12. Number Of Hours Reactor Has Critical 421.6 4986.5 90391.7 i
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0. 0 . !
- 14. Hours Generator On-Line 189.4 4577.8 86707.1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy: Generated (MHH)
- 17. Gross Electrical Energy Generated (MHH)
.J20904.0 108630.0.
8540448.0 149025360.0 2924890.0 50161714.0 l;
- 18. Net Electrical Energy Generated (MHH) 104302.0- 2812807.0 48195991.0 !
- 19. Unit Service Factor 26.3 69.9 '55 5 'i
- 20. Unit Availability Factor 26.3 69.9 55.5 i
- 21. Unit Capacity Factor (Using MDC Net) 21.6 64.1 46.1 l
- 22. Unit Capacity Factor (Using DER Net) - 2 2.1.. 65.6 47.1,
- 23. Unit Forced Outage Rate 73.7 15.2 13.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and-Duration of Each):
None '
a
- 25. If Shut Down At End Of Report Period Estimated Date of Startup -
N/A .
- 26. Units In Test Status (Prior to Commercial Operation):
N/A i Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) l
- > BOSTON EDISON COMPANY .
l PILGRIM NUCLEAR POWER STATION-DOCKET NO. 50-293 0 e Operational Summary for Seotember 1990 l
\
The unit-started the month at approximately 100 percent power. At 2155 hours0.0249 days <br />0.599 hours <br />0.00356 weeks <br />8.199775e-4 months <br /> !
on 9/2/90, Control room operators observed a slow unexplained increase in i Reactor Vessel water-level. Operators took manual control of the feedwater-Control System attempting to restore water level to normal, When it was !
determined that feedwater Control could not be reestablished, power was 'l reduced to 60 percent and the reactor was manually scrammed at 2233 hours0.0258 days <br />0.62 hours <br />0.00369 weeks <br />8.496565e-4 months <br /> by i placing the Mode Switch in Shutdown. After the shutdown, other equipment problems were experienced-with RCIC, HPCI and RHRS. After maintenance activities were performed, including a modification to the feedwater control system, the reactor was made critical on September 18, 1990 at 0342 hours0.00396 days <br />0.095 hours <br />5.654762e-4 weeks <br />1.30131e-4 months <br />.
Additional maintenance was then performed on the RCIC turbine and RHR HO-1001-50 valve, and on September 25, 1990 the generator was synchronized to the grid at 0106 hours0.00123 days <br />0.0294 hours <br />1.752645e-4 weeks <br />4.0333e-5 months <br />. Power was increased to approximately 100 percent by 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> on September 27, 1990. On September 29, 1990 power.was reduced to approximately 50 percent to perform a control rod pattern change. Power was then increased to approximately 100 percent by 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on September 30, 1990 and remained at that-level for the remainder of the reporting = period.
Safety Relief Valve Challenges Month of Seotemhgr 1990 -
Requirement: NUREG-0737 T.A.P. II.K.3.3 '
Date: September 3, 1990 Valve # 203-3B and 3C Reason: Reactor pressure control.
An SRV challenge is defined as anytime an SRV has received a signal to operate via reactor pressure, auto signal (ADS) or control switch (manual). .Ref. BECo Itr. #81-01 dated 01/05/81.
i
~
we
. 1 REFUELING INFORMATION The following refueling information is included in the Monthly. Report as !
requested-in an NRC letter to BECo, dated January 18, 1978:
1 For your convenience, the information supplied has been enumerated so that,. -j each number corresponds to equivalent notation utilized in the request.
- 1. The name'of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
- 2. Scheduled date for next Refueling Shutdown: Second Quarter-1991 .
- 3. Scheduled date for restart following refueling: . Third Quarter 19911 4 Due to.their similarity, requests 4, 5, & 6 are responded 'to collectively '
.under #6.
, 5. See #6.
- 6. The new fuel loaded during the 1986/87 refue' ling outage was of the same-l design as loaded in the previous outage, and consisted of 192_ assemblies.
- 7. (a) There are 580 fuel assemblies in the core.
(b) There are 1320 fuel assemblies in.the spent fuel pool. [
- 8. (a) The station i; presently licensed to' store 2320 spent fuel assemblies. The actual usable spent fuel storage capacity is 2320 fuel assemblies. .
(b) The planned spent fuel storage. capacity is 2320 fuel assemblies.
- 9. Hith present spent fuel in storag'e, the spent fuel pool now has the
- capacity to accommodate an additional 1000 fuel r
- u mblies.
1 .
i l
i l
l i
A ?
Month September 1990 PILGRTM G CLEAR POWER STATION MAJOR SAFETY RELATED MAINTENANCE ,
SYSTEM COMPONENT MALFUNCTION CAUSE . MAINTENANCE CORRECTIVE ACTION TO ASSOCIATED l PREVENT RECURRENCE LER Feedwater Train "B" Packing Degradation of Repacked valves Refer to associated LFR 90-013-00 (FH) Feedwater leak stem and packing (FV-642 A&B) with LER System Regulating box. improved design.
Valve FV-642 B.
(F&MR 90-276)
Feedwater Startup Feedwater Air leak. Degradation of Repacked valve with Refer to associated LER 90-013 (FH) Regulating Valve internal diaph- live load packing; LER.
System FV-643. rage of the replaced booster (F&MR 90-284) booster relay. relay.
Feedwater Feedwater Reg- - Blown fuse Moisture accum- Replaced fuse and Refer to associated LER 90-013-00 i (FH) ulating Valve ulated in-press- pressure switch: LER.
System Power Supply ute switch from implemented design
. (640-42)- junction box, modification per.
as a result of PDC 90-56. Repaired FV-642 B packing-leak._ ,
packing leak. ,
Reactor RCIC Turbine Turbine-trips Looseness in Overspeed trip mech- Refer to associated LER 90-013-00L '
Core (F&MR 90-285,286) mechanica1' aver- anism disassembled LER.
' speed trip link- and cleaned; linkage Isolation Cooling age. adjusted.
(RCIC)
System Reactor RCIC Injection ' Valve failed . Valve disc . Valve modified to Refer to associated LER 90-013-00 Core Check valve to close. binding due_to reduce binding. LER Isolation 1301-50 loose shaft key. (FRN 90-03-84)
Cooling .
(RCIC)
System
__..m - - - -
Month ' September 1990 .' ?
PILGRIM NUCLEAR POMER STATION -
MAJOR SAFETY RELATED MAINTENANCE ~1 SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENAfE;E CORRECTIVE ACTION TO ASSOCIATED
_2R_DIENT RECURRENCE LER High HPCI turbine Flow oscill- EG-R hydraulic Needle valve adjust- Refer to associated - LER 90-013-00 Pressure (F&MR 90-291) ations; over- actuator needle ed; diagnostic test- LER.
Coolant speed trip. valve improperly ing on-going.
Injection adjusted; cause (Temporary Modifica-(HPCI) of overspeed- tion 90-31).
System trip under inve- .
stigation.
Residual Shutdown Cooling Valve did not failure of Relay replaced Refer to associated LER 90-013-00
' Heat Suction Isolation respond (open) seal-in relay LER Removal Valve MD-1001-50 to control 16A-K29 (RHR) (F&MR 90-292) switch. (CR-120A)
' System Residual Shutdown Cooling Body to Under Leak sealant compound None . N/A Heat Suction Isolation bonnet leak. investigation (Furmanite)' injected Removal . Valve MO-1001-50 into valve body.
(RHR) (F&MR 90-296)
System '
1
-F ~~ " ' " " ' ' * **""~"'~~~~'~"# ~ L- - - - - - ~ ~ - - - ' - ~ - - -
UNIT SHUTDONNS AND PONER REDUCTIONS DOCKET NO. 50-293. ..~
NAME Pilarir] - --
DATE october 10. 1990- ~ ' -! ;
COMPLETED BY G. Bas 11esco'- ' '- .._
TELEPHONE (508) 747-8534' REPORT MONTH September 1990 METHOD OF LICENSE CAUSE & CORRECTIVE. ,
NO. DATE TYPE I DURATION (HOURS) REASON 2
-SHUTTING DONN REACTOR 3 EVENT.
-REPORT #
SYSTEM C00E4 g ENT ACTION TO PREVENT' RECURRENCE 12 09/02/90 F 530.6 A 2 90-013-00 SJ FU Failure to maintain reactor water level.- !
PDC 90-56. implemented.-
13 09/29/90 S 0.0 -
5 N/A Power. reduction to' perform control rod-pattern change.
1 2 2 3 4&S -
F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H '
S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for -
C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet.
E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File-(NUREG-1022)-