Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEAR05000254/LER-1993-0131993-08-27027 August 1993 LER 93-013-00:on 930729,identified Deviation from TS & Reg Guide 1.52 Requirements for Methyl Iodide Testing of Charcoal Sample Canisters.Caused by Failure to Implement Proper Canister Testing.Canisters Tested by Nucon 05000254/LER-1993-0121993-08-24024 August 1993 LER 93-012-00:on 930726,light Socket Shorted Out When Operator Reset HPCI Logic Power.Caused by Short Circuit in Light Socket.Light Socket & Blown Fuses replaced.W/930824 Ltr 05000254/LER-1993-0101993-08-19019 August 1993 LER 93-010-00:on 930720,HPCI Declared Inoperable & HPCI Outage Rept Qcos 2300-2 Initiated Because IST Flow Rate Fell in IST Required Action Range Due to New Procedure. Surveillance Procedure Will Be revised.W/930819 Ltr 05000254/LER-1993-0111993-08-18018 August 1993 LER 93-011-00:on 930721,discovered That 4kV Breaker 68 Feeding CS 1B Motor Pump Open & Discharged,Resulting in CS 1B Being Declared Inoperable.Wr Written to Investigate & repair.W/930813 Ltr 05000254/LER-1993-0091993-08-13013 August 1993 LER 93-009-00:on 930714,SBGT Methyl Iodide Test Failed Due to Age of Charcoal Combined W/Stringent Test Criteria. Replaced Charcoal Absorber in Both Trains of Sbgt. W/930806 Ltr 05000254/LER-1993-0081993-08-11011 August 1993 LER 93-008-00:on 930709,reactor Bldg Ventilation Radiation Monitor Setpoints Set non-conservatively Four Times in Five Yrs.Caused by Instrument Maint Program Error. New Computer Program developed.W/930805 Ltr 05000265/LER-1988-006, Errata to LER 88-006-02:on 880404,station Notified That Eleven Flued Head Anchors Did Not Meet Design Requirements. Caused by Misinterpretation of Scope & Design Structures.Mod Initiated to Revise Structure1992-06-0404 June 1992 Errata to LER 88-006-02:on 880404,station Notified That Eleven Flued Head Anchors Did Not Meet Design Requirements. Caused by Misinterpretation of Scope & Design Structures.Mod Initiated to Revise Structure 05000254/LER-1990-0131990-07-24024 July 1990 LER 90-013-00:on 900626,annunciators on Both Units & Reactor Recirculation Loop Sample Valve Closed.Caused by Actuation of Primary Containment Isolation Valve When Lightning Struck 345 Kv Line.Valve reopened.W/900724 Ltr 05000254/LER-1988-001, Sanitized Version of LER 88-001-00:on 880114,records Review Found Two Apparent Overexposures of Contractor Personnel During Fourth Quarter 1980.Caused by Inaccurate Secondary &/ or Primary Dosimetry.Dosimetry Sys Upgraded1988-01-28028 January 1988 Sanitized Version of LER 88-001-00:on 880114,records Review Found Two Apparent Overexposures of Contractor Personnel During Fourth Quarter 1980.Caused by Inaccurate Secondary &/ or Primary Dosimetry.Dosimetry Sys Upgraded ML20203L0281986-04-25025 April 1986 Informs of Planned Site Visit to Obtain Info Supporting Implementation of Emergency Response Data Sys,Including Availability of PWR or BWR Parameters in Digital Form & Characterization of Available Data Feed Points 05000254/LER-1984-018, :on 840922 & 24,reactor Bldg Fuel Pool Channel B Area Radiation Monitor 1705-16B Spiked High, Tripping Ventilation.Cause Unknown.Corrective Actions for Both Events Will Be Documented in Suppl to LER 84-0181984-10-11011 October 1984
- on 840922 & 24,reactor Bldg Fuel Pool Channel B Area Radiation Monitor 1705-16B Spiked High, Tripping Ventilation.Cause Unknown.Corrective Actions for Both Events Will Be Documented in Suppl to LER 84-018
05000265/LER-1983-021, Revised LER 83-021/01T-5:on 831028,ultrasonic Exams of Large Bore Stainless Steel Pipe Welds Identified 11 Welds W/Crack Indications.Caused by Intergranular Stress Corrosion Cracking.Weld Overlay Performed1984-02-28028 February 1984 Revised LER 83-021/01T-5:on 831028,ultrasonic Exams of Large Bore Stainless Steel Pipe Welds Identified 11 Welds W/Crack Indications.Caused by Intergranular Stress Corrosion Cracking.Weld Overlay Performed 05000265/LER-1983-018, Revised LER 83-018/01T-1:on 831011,discovered 1-1/4 Inch long,20% through-wall Linear Indication in Weld 12S-S27. Caused by Intergranular Stress Corrosion Cracking.New Welds & Elbow Installed1984-02-0202 February 1984 Revised LER 83-018/01T-1:on 831011,discovered 1-1/4 Inch long,20% through-wall Linear Indication in Weld 12S-S27. Caused by Intergranular Stress Corrosion Cracking.New Welds & Elbow Installed 05000265/LER-1983-020, Revised LER 83-020/01T-1:on 831028,weld 02B-S9,22-inch Pipe to Cap,Weld 02BS-S12,28-inch Elbow to Pipe & Weld 02BS-F14, 28-inch Pipe to Elbow Weld Had Circumferential Linear Indications1983-12-0909 December 1983 Revised LER 83-020/01T-1:on 831028,weld 02B-S9,22-inch Pipe to Cap,Weld 02BS-S12,28-inch Elbow to Pipe & Weld 02BS-F14, 28-inch Pipe to Elbow Weld Had Circumferential Linear Indications 05000265/LER-1982-018, Supplemental LER 82-018/03L-1:on 821006,emergency Diesel Generator Tripped on High Temp After Loading.Caused by Fouling of Diesel Generator Cooling Water Sys.Both HX Replaced1982-12-0101 December 1982 Supplemental LER 82-018/03L-1:on 821006,emergency Diesel Generator Tripped on High Temp After Loading.Caused by Fouling of Diesel Generator Cooling Water Sys.Both HX Replaced 05000254/LER-1982-022, Supplemental LER 82-022/03L-1:on 820816,maint Outage for 1/2B Diesel Fire Pump Exceeded 7-day Limit.Cause Not Stated. Diesel Pump Wear Rings Replaced1982-10-0707 October 1982 Supplemental LER 82-022/03L-1:on 820816,maint Outage for 1/2B Diesel Fire Pump Exceeded 7-day Limit.Cause Not Stated. Diesel Pump Wear Rings Replaced ML20150E1741978-11-20020 November 1978 /03L-0 on 781026:dual Position Indication Was Received for Supression Chamber to Drywell Vacuum Breaker, Valve 1-1601-33E.Caused by Position Indication Problem ML20062E6521978-11-15015 November 1978 /03L-0 on 781025:smoke Detectors Were Removed from Svc in Cable Spreading Room,Elec Equip Room & Control Room for Installation of New Fire Detection/Suppression Sys ML20062D5871978-10-25025 October 1978 /03L-1 on 780420:during Routine Hydraulic Snubber Surveillance Inspec,Snubber Mark 149 Was Found Inoper Due to Empty Fluid Reservoir & Mark 144 Was Found W/Missing Cotter Pin,Due to Component Failure ML20062D5161978-10-19019 October 1978 /03L-0 on 780920:A RHR Room Watertight Door Found Open.Caused by Contractor Personnel Ignorance. Personnel Admonished to Heed Procedures at All Times ML20084Q0021976-12-30030 December 1976 LER 017/03L-0:on 761203,Grinnell Corp Snubber 4755 on RCIC Steam Supply Piping Found to Have Empty Oil Reservoir. Caused by Leakage Through Reservoir End Gap Gaskets.Snubber Repaired & Reservoir Refilled w/oil.W/761230 Forwarding Ltr 05000265/LER-1976-012, Updated LER 76-012/03L-1 Correcting Event Type,Category & Rept type.W/761001 Forwarding Ltr1976-10-0101 October 1976 Updated LER 76-012/03L-1 Correcting Event Type,Category & Rept type.W/761001 Forwarding Ltr ML20084P4791976-08-25025 August 1976 LER 023/03L-0:on 760727,diesel Generator 1/2 Out of Svc for Monthly Insp for 55 Minutes Longer than Tech Spec Limit of 1.5 H.Caused by Maint Personnel Not Being Aware of Time Limit.Procedure to Be Changed ML20084Q0281976-05-27027 May 1976 LER 017/03L-0:on 760427,while Performing Low Reactor Water Level Functional Test,Level Indicating Switch LIS-1-263-58A Tripped,Exceeding Tech Specs.Caused by Instrument Drift. Switch recalibr.W/760527 Forwarding Ltr ML20084Q0511976-04-30030 April 1976 L-0:on 760427,while Performing MSIV Surveillance, Duel Indication Received for Valves AO 1-203-1B & AO 1-203-1D.Caused by Switches Being Out of Alignment.Minor Air Leak repaired.W/760430 Forwarding Ltr 05000254/LER-1976-002, Updated LER 76-002/03L Re Excessive Leakage from Double Gasketed Seal X-4.Initially Reported on 760202.Caused by Equipment Failure & Insufficient Compression.Hatch Bolts Tightened1976-03-0303 March 1976 Updated LER 76-002/03L Re Excessive Leakage from Double Gasketed Seal X-4.Initially Reported on 760202.Caused by Equipment Failure & Insufficient Compression.Hatch Bolts Tightened 1993-08-27
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data SVP-99-204, Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212J0501999-09-21021 September 1999 Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1 SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20210L8661999-08-0202 August 1999 Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs SVP-99-155, Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20195K1481999-06-16016 June 1999 Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety SVP-99-123, Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations SVP-99-104, Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with1999-04-30030 April 1999 Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with ML20205Q5291999-04-16016 April 1999 SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained ML20205J6011999-04-0707 April 1999 Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-071, Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20205C5671999-03-19019 March 1999 Simulator Four-Yr Certification Rept ML20207D2341999-03-0101 March 1999 Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205 ML20204B1571999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Quad Cities,Units 1 & 2.With SVP-99-021, Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With1999-01-31031 January 1999 Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With ML20205D1311998-12-31031 December 1998 1998 Decommissioning Funding Status Rept for Yr Ending 981231 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with SVP-99-007, Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With ML20196C8391998-11-30030 November 1998 Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1 SVP-98-364, Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196G1241998-11-30030 November 1998 COLR for Quad Cities Unit 1 Cycle 16 ML20196D9651998-11-30030 November 1998 Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by Licensee ML20196C8731998-11-30030 November 1998 Rev 0 to GE-NE-B13-01980-30-1, Fracture Mechanics Evaluation on Observed Indications at Two Welds in Recirculation Piping of Quad Cities,Unit 1 Station ML20196A9761998-11-20020 November 1998 Safety Evaluation Re Licensee 180-day Response to GL 95-07, Thermal Binding of Safety-Related Power-operated Gate Valves ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB SVP-98-346, Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-98-358, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With1998-10-31031 October 1998 Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With SVP-98-326, Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20153D0191998-09-18018 September 1998 Part 21 Rept Re Defect in Gap Conductance Analyses for co- Resident BWR Fuel.Initially Reported on 980917.Corrective Analyses Performed Demonstrating That Current Operating Limits Bounding from BOC to Cycle Exposure of 8 Gwd/Mtu ML20153C6771998-09-17017 September 1998 Part 21 Rept Re Defect Relative to MCPR Operating Limits as Impacted by Gap Conductance of co-resident BWR Fuel at Facilities.Operating Limit for LaSalle Unit 2 & Quad Cities Unit 2 Will Be Revised as Listed ML20151T2711998-09-0404 September 1998 Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002 ML20151Y7261998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Quad Cities Nuclear Power Station ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20151Y7301998-07-31031 July 1998 Revised MOR for Jul 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20237A6251998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Quad Cities Nuclear Power Station,Unit 1 & 2 SVP-98-328, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With1998-07-15015 July 1998 Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With SVP-98-249, Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 SVP-98-215, Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 2 ML20247N6281998-05-19019 May 1998 Rev 2 to COLR for Quad Cities Unit 2 Cycle 15 ML20216C0561998-04-30030 April 1998 Safe Shutdown Rept for Quad Cities Station,Units 1 & 2, Vols 1 & 2.W/22 Oversize Figures SVP-98-176, Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20217D0281998-04-22022 April 1998 Part 21 Rept Re Additive Constants Used in MCPR Determination for Siemens ATRIUM-9B Fuel by Core Monitoring Sys Were Found to Be non-conservative.SPC Personnel Notified All Customers w/ATRIUM-9B Lead Test Assemblies ML20217G3951998-04-0808 April 1998 TS 3/4.8.F Snubber Functional Testing Scope Quad Cities Unit 2 TS (Safety-Related) Snubber Population 129 Snubbers SVP-98-128, Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 2 1999-09-30
[Table view] |