,[a:*%
Attachment for 8
umrrensTATas Question 3 o
i
,i NUCLEAR REGULATORY COMMISSION REGON V g
%, *... +,o 14e0 MARIA LANE. SUITE 210 WALNUT CREEL CAUFORNIA 9480H30B FEB 16 1990 MEMORANDUM FOR:
Richard E. Cunningham, Director Division of Industrial and Medical Nuclear Safety, NMSS FROM:
Ross A. Scarano, Director Division of Radiation Safety and Safeguards
SUBJECT:
AFFECT OF U. S. TESTING ENFORCEMENT ON MATERIALS PROGRAM GOALS As you know Region V has been involved in protracted escalated actions with U. S. Testing which involves the issuance of propo rcement Penalties of $280,000, and $5,000, and their response denying m violations.
our staff who have expended approximately 580 s of the this effort.
Redirecting such a large portion of our resources to this unplanned area has decreased our ability to do the budget num cases and inspections.
ensing Since the two inspectors who were directed to work on U on inspections, we request our program goals b
. S. Testing had been
_FY 1990 Number of Materials Licensing Cases
- FY 1990 Revised Number of Materials Inspections 210 190 125 99
- See attached calculations The settlement of the U. S. Testing actions appears near adjustment for this effort should not be necessary., so additional Thank you for your consideration in this matter.
W i
Ross A. Scarano, Director Division of Radiation Safety and Safeguards
Attachment:
As Stated l
4
4
- 1. Activities were budgeted as follows:
a) 1.7 FTE O 74% for Licensing
= 2617 hours0.0303 days <br />0.727 hours <br />0.00433 weeks <br />9.957685e-4 months <br /> = 12.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> per case ITU~ cases b) 2.9 FTE 9 27% for inspection = 1628 hours0.0188 days <br />0.452 hours <br />0.00269 weeks <br />6.19454e-4 months <br /> = 13.02 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 175 inspections n
II. a)
Dave Skov did 315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> of Enforcement.
according to his original program goals, If he had been working been spent in inspection, and 10% (31.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />) would h 90% (283.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> would have in licensing.
ent b)
Jim Montgomery did 265 hours0.00307 days <br />0.0736 hours <br />4.381614e-4 weeks <br />1.008325e-4 months <br /> of Enforcement working according to his original program go. If he had been have been spent in licensing.would have been spent in III.
Licensing Inspection Budget 2617 Skov 1628 31.5 Montgomery
- 212
- 283.5 2373.5
_ 53 1291.5 0 12.46 hrs. per case 190 cases 0 13.02 hrs. per insp.
99 inspections i
I
\\
Ta'le VI o
RESPONSE TO ITEM N0. 7. NMSS 1990 REGIONAL TRANSPORTATION INSPECTIONS Date Module Name Operations 86740 Last Docket No.
Class Performed Aerotest 50-228 II General Atomics Mark 1)50-089 II General Atomics ((Mark F) 3/27-30/89 10/11-14/88 50-163 II General Electric (NTR) 10/11-14/88 50-073 II Oregon State University 11/13-21/89 50-243 II Reed College 5/22-25/89 50-288 II University of Arizona 8/1-4/89 50-113 II University of California 50-224 1/8-12/90 at Berkeley 7/1/89 University of California at Irvine 50-326 II 8/28-31/89 University of Washington 50-139 III Washington State 1/8-9/90 University 50-027 II 5/24-26/89
- under decommissioning order MODULES 86721, 86740 AND 83750 COMPLETIONS AT OPERATING POW 83750 86721 FY 89 FY 90 FY 89 FY 90 FY 89 FY 90 86740 WNP-2 5/18/89 TROJAN 7/14/89' 12/22/89 9/15/89 R.S.
11/09/89 1/26/90 8/30/89 D.C.
7/14/89 2/89 SONGS 11/08/89 4/03/89 4/03/89 PV 9/01/89 12/88 12/01/89 12/88 GA ANF 3/3/89 12/16/88 and 9/29/89 GE-VAL 8/14/89
-