_ - _ . _ . _ . _ . . . _ . _ _ _ . _ _ _ _ _ _ _ _ ..__ _ _.__.__ _ __ ____ _

!2 4

  • 4 . . . .

assignments. The Manager, Modifications is also responsible for l providing engineering support during the implementation and closeout of ,

!' design modifications generated in support of ANO. The Manager, >

l Modifications provides technical direction and administrative guidance to the:

! (1) Superintendent, Installation '

(2) Superintendent, Modification Engineering

! 1.3.3.6 Manager, Nuclear Engineering Design 4

The Manager, Nuclear Engineering Design reports to the General Manager, Engineering and directs nuclear engineering activities in support of ANO.

The position provides nuclear engineering, nuclear safety analysis, core j reload and availability, reliability technical assistance in the resolution of operations and maintenance concerns at the request of plant staff, and is directly related to power generation operations, n 1.3.4 General Manager, Assessment The General Manager, Assessment reports to the Vice President, Operations ANO and provides planning, direction, control and overall supervision to the Plant Assessment Training and Emergency Planning, Licensing, Fitness For Duty, and Security Departments in support of the continued operation of ANO. Responsibilities involve ensuring the development and administration of programs in the areas mentioned above that meet or exceed industry standards and regulatory requirements in both varied technical and non-technical areas; all of which impact the capability and performance of maintenance, operations and support personnel and thus

affecting plant availability, performance and efficiency.

Responsibilities also involve the supervision of activities involving direct regulatory interfaces, station support, safety assessment and program oversight. The Technical Support and Assessment Department's QA MANUAL OPERATIONS REV. 12 DATE 07/22/90

%, , SECTION: 1.0 ORGANIZATION PAGE 1-15 b h b b. 13 p FDC

l-

  • i .

j c . .

y.. .

l

  • organization is shown in Figure 7. The General Manager, Assessment l '

I provides technical direction and administrative guidance to the:

(1) Manager, Licensing j l

1 (2) Manager, Plant Assessment l (3) Manager, Training and Emergency Planning (4) Manager, Security

(5) Medical Review Officer / Physician (6) Corporate Health Physicist [

I 1.3.4.1 Manager, Licensing The Manager, Licensing reportt to the General Manager, Assessment and has overall responsibility for the mana9 ment and oversight of NRC inspection l l

activities and interactions with the NRC regional ar.d Washington, DC offices, and overall management of ANO participation in the B&W and CE Owners Groups and other industry groups. The Manager, Licensing provides technical direction and administrative guidance to the: >

(1) Supervisor, Licensing / Compliance (2) Supervisor, Licensing (3) Project Manager, Industry Support 1.3.4.1.1

) The Supervisor, Licensing / Compliance reports to the Manager, Licensing and is responsible for the following duties: .

l  !

(1) interfacing with on-site and regional regulatory agencies and the Manager, Licensing pertaining to Licensing and regulatory matters O

ANO

% ,,, w %

QA MANUAL OPERATIONS SECTION: 1.0 ORGANIZA1;0N REV.

DATE 07/22/90 PAGE 1-16 12

t  !

t .

y.- . .

. 16.5.3 ,

! O- Upon completing the final draft of the report, the Manager, Licensing forwards the report to the General Manager, Assessment *or final approval. The PSC reviews Root Cause and Corrective Action plans for .

l

! reportable events through its review of Licensee Event Reports (LERs). ,

i I i i 16.5.4 -  ;

I The Licensing Department is responsible for transmitting approved reports to the NRC w' thin the time period specified in the Techn+ cal i Specifications and approved procedures.

l i

I 16.6 VERIFICATION ,

Verification by surveillance or audit of the effective implementation of-l corrective actions is to be periodically performed and documented by Nuclear Quality personnel. Audits are to be performed in accordance with Section 18.0 of this manual. 4 O t i

1 k

QA MANUAL OPERATIONS REV. 12 DATE 07/22/90

  • SECTION: 16.0 CORRECTIVE ACTION PAGE 16-4

, g