l ARKANSAS POWER & LIGHT COMPANY l
i I
I I
I QUALITY ASSURANCE MANUAL OPERATIONS l
l I
I REVISION 9 l
l I
I I
I I
I
/
/I I APPROVED:
_Er-v DATE: df//7/#pl l
l QUALITY ASSURATCE SUPERINTENDENT
/
I I
I I
I I
I I
[]-
APPROVED:
a u s. M DATE:
6 f
91 k
I NUCL' EAR [ALITY GENERAL t% NAGER [
l I
I I
I I
I i
i I APPROVED: M DATE: 4/A#/f/ l l
NUCLEAR OPER/@f0NS VICE PRESIDENT l
I I
I I
I I
I I
I I
l 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
l A
I QA MANUAL OPERATIONS REV.
9 l
l P
I IDATE 07/22/87 l
l 1
APPROVAL SIGNATURES I
I I
L I
I l
AhDCK D
O 13 P
PDR N
l l
l RECORD OF REVISIONS l
1 I
l REVISION l
_l NUMBER DESCRIPTION DATE l
0 Initial Issue 6/11/74 l
1 I
I 1
Response to AEC Questions Submitted 12/13/74 I
l 11/21/74.
Revisions'to Section 2, 1
I 4., and 7 as indicated.
l l
I l
2 Response to NRC Questions Submitted 3/4/75 l
l 2/7/75.
Procedure Numbers 1005.xx l
l changes to 1004.xx (Number Change Only).
I l
l l
3 General revision to change AEC to NRC, 9/8/76 1
l update organization, reflect NSP l
l revisions, minor program implementation l
l changes.
I I
I I
4 Eliminate Quality Assurance Committee 9/8/77 I
l Changes to Procurement Control -
l-l Qualification of Vendors.
Organizational l
l Changes.
Incorporate Technical l
I Specification Changes.
l I
I I
5 Incorporate Orgad zational Changes 10/10/80 l
1 and responses to aubsequent NRC l'
l Questlons.
Incorporate Regulatory l
0 l
Guides and retype document in its l
l entirety in standardized format.
I I
l l
6 Incorporate organizational changes, 5/30/84 l
l delete procedural references l
l throughout manual, and accurately
{
l reflect current regulatory commitments l
l and QA practices related to the l
l safe operation of AP&L nuclear plants.
I l
Manual has been reformated and retyped i
l in its entirety.
I l
l l
7 Changes given below are identified 05/31/85 l
l on the p'"es by a bar in the left l
l margin,,; aced next to the affected l
l area.
I l
l l
Corrected by errata (includes misspelled l
l words) on the fellowing pages:
1 I
l l
A-1 2-5 10-6 TI-9 l
l A-2 3-2 11-5 T1-13 l
l 1-10 3-3 13-2 T3-1 l
l 1
I I
A l
QA MANUAL OPERATIONS REV.
8 l
l P
l lDATE 06/10/86 l
l 1 SECTION:
RECORO OF REVISIONS IPAGE =1 l-I L
l l
l l
l l'
I I(
r l
l l
RECORD OF REVISIONS l
l l
l REVISION l
l NUMBER DESCRIPTION DATE l
l l
l 7 (Cont)
I l
l 1-12 3-4 13-4 T3-2 l
l 1-18 4-2 15-2 T3-3 l
i l
1-19 5-2 15-3 l
l 1-20 5-3 15-5 l
l 1-22 5-4 15-4 I
i 1-23 6-2 16-1 l
l 7-2 T1-6 l
l 9-1 l
I l
l Page C-7: revised definition l
1 l
Page C-8: revised definition l
l l
Page 1-9: revised paragraph-1.4.2(1) l l
Page 1-10: revised paragraph 1.4.2.1 l
l Page 1-11:added paragraph 1.4.2.1.1 l
l
- paragraph 1.4.2.2 redesignated l
l 1.4.2.1.2 l
l
- added paragraph 1.4.2.1.3 l
l
- paragraph 1.4.2.3 redesignated l-l 1.4.2.2 and revised l
l Page 1-12: paragraph 1.4. 2. 3.1 redesig-I.
I nated 1.4.2.2.1 l
l Page 1-13:added 7) to paragraph 1.5.1.3 l
l Page 1-14 & 15: revised paragraph 1.5.3 l
l l
to delete Planning / Scheduling Supervisor l
l Page 1-21:added paragraph 1.5.8 l
l Pages 1-1 to 1-23: paragraph locations l
l changed l
l Page 2-2: paragraph 2.2.2 redesignated l
l 2.2.3 and revised l
l Page 2-2: paragraph 2.2.3 redesignated l
l 2.2.4 l
l Page 2-2: paragraph 2.2.4 redesignated l
l 2.2.5 l
l Page 2-2: new paragraph 2.2.2 added l
l l
l Page2-3: revised paragraph 2.2.5(2) l l
Page 2-7 and 2-8: revised paragraph 2.6.4 l
l Pages 2-3 to 2-9: paragraph locations 1
(
l changes I
j l
Page 7-3: revised paragraphs 7.2.3 and I
i l
7.2.4
'l i
l Pages 7-3 to 7-7: paragraph locations I
i changes l
l Page 15-1: revised paragraph 15.2.1 l
I Page 18-3: revised paragraph 18.3.2 l
1
'l-l l
1 I
O I
I I
l l
h l
A l
QA MANUAL OPERATIONS IREV.. 8 l
l l
P l
lDATE 06/10/86 l
l 1 SECTION:
RECORD OF REVISIONS lPAGE 2 l
l L.
l l
l 1
l I
l
-l
(
l l
l RECORD OF REVISIONS l
l l
l REVISION l
q l NUMBER DESCRIPTION DATE l
I J
l l
l 7 (Cont)
{
l Pages 18-3 to 18-6: paragraph locations l
l changes l
l Page F-1: revised Figure 1 l
l Page F-2: revised Figure 2 l
l Page F-3: revised Figure 3 l
l Page F-5: revised Figure 5 l
l Page F-6: revised Figure 6 l
l Page T2-1: revised titles l
l Page AA-1 to AA-3: new Appendix A added l
l Page AB-1 to AB-8: new Appendix B added l
l l
l8 Changes given below are identified 06/10/86 l
l on the pages by a bar in the left l
l margin, placed next to the affected l
l area.
l l
Corrected by errata (including l
l misspelled words) on the following l
l pages:
l 1
l l
A-1 5-1 16-1 17-5 l
l B-1 6-1 16-3 AB-2 l
l 2-1 7-5 17-1 AB-4 l
l 2-6 11-5 17-2 AB-10 l
l
?-5 15-1 17-4 AB-11 l
l 4-1 l
l l
l Page A-1 : Revised 2nd, 3rd, and 4th j
l paragraphs l
l Page A-2: : Revised 1st paragraph l
l l
- Changed signature l
l l
Page B-5 :Added ANSI N3.1 l
l l
- Added paragraph at end of l
l l
section l
l Page C-7
- Revised definition l
l Page C-9 : Revised definition l
l Pages 1-1 : Rewritten to reflect i
j l
to 1-23 new organization l
j l
Page 2-1 : Revised paragraph-2.2.1 l
l l
- Added paragraph 2.2.2 l
l Page 2-2 : Paragraphs 2.2.3 and 2.2.4 l
l were 2.2.2 and 2.2.3 l
l
- Revised paragraphs 2.2.3 and 2.2.4 l
l l
l l
l l
l 1
1 l
l 1
I I
I 1
A l
QA MANUAL OPERATIONS lREV.
8 l
1 l
P l
'lDATE 06/10/86 l
l l
1 SECTION:
RECORD OF REVISIONS lPAGE 3 l
l l
L l
l l
l l
1 I
s
_ --___ _ __9
I I
l RECORD OF REVISIONS l
I I
l REVISION I
l l NUMBER DESCRIPTION DATE I
(q)
l I
l 8 (Cont.)
I l
Page 2-3 : Title changes, paragraph 2.2.5 l
l
- Paragraph 2.2.5 was 2.2.4 I
J
- 0ld Paragraph 2.2.5 incorporated I
l into Paragraph 2.2.2 l
l
- Paragraph 2.3.1, title change l
l Page 2-4 : Title changes, paragraphs 2.3.3 l
l and 2.3.4 l
l
- Revise'd paragraph 2.4.1 l
I Page 2-5 : Title changes, paragraphs 2.4.3, l
1 l
2.5.1, 2.5.2 l-l Page 2-6 : Revised paragraph 2.5.2 and 2.6.1 l
l
- Title change, paragraph 2.5.3 l
l Page 2-8 :New paragraph 2.6.6 added I
i
- Paragraph 2.6.7 was 2.6.6-l l
- Revised paragraph 2.6.7 & 2.7.1 l
l Page 2-9 : Title change paragraph 2.7.2 I
i l
Page 3-1 : Revised paragraph 3.2.1 l
l Page 3-2 : Title changes, paragraph 3.4.1 l
l Page 3-4 : Revised paragraph 3.5.1 & 3.5.3
'l i
Page 3-5 : Title change, paragraph 3.5.4 I
I Page 4-1 : Title change, paragraph 4.2.1 l
l Page 4-2 : Revised paragraph 4.3 1
l Page 4-3 : Revised paragraph 4.4 1
1 Page 5-2 : Revised paragraph 5.3.1 I
l
- Title changes, paragraph 5.2.2 l
s l
and 5.3.2 l
l Page 5-4 : Revised paragraph 5.4.2 l
l Page 6-1 : Revised Paragraphs 6.1 & 6.2.2 l
l Page 6-2 : Title change, paragraph 6.2.3 1
{
l
- Added paragraph 6.2.4 1
{
l Page 7-1 : Title changes, paragraph 7.2.1 l
l
& 7.2.2 l
l 1
Page 7-3 : Revised paragraph 7.2.3 l
1
- Title change, paragraph 7.3.1 l
l Page 7-4 : Title changes, paragraphs 7.3.2 l
l
& 7.3.3 1
i Page 7-5 : Revised paragraph 7.4.3 l
l Page 10-4 : Title changes, paragraphs 10.3.2.3 l
l
& 10.4.1 l
l Page 10-5 : Revised paragraph 10.4.2 l
l Page 10-6 : Revised paragraph 10.5.3 l
l Page 12-1 : Added paragraphs 12.1.2 & 12.1.3 l
l Page 12-2 : Title change, paragraph 12.2.4 l
1
- Revised paragraph 12.3.1 l
l Page 13-2 : Title changes, paragraph 13.3.2 l
l Page 13-3 : Title change, paragraph 13.5.3 l
I l
l i
/~
l i
I I
l A
1 QA MANUAL OPERATIONS lREV.
8 l
l P
l lDATE 06/10/86 l
l l SECTION:
RECORD OF REVISIONS IPAGE 4 l
l L
i l
i l
I I
l
\\
4
a 4
I I
J l
RECORD OF REVISIONS l
J l
l l REVISION l
l NUMBER DESCRIPTION DATE l
j (q
I l
i V) l 8 (Cont.)
l
]
l Page 13-4 : Title change, paragraph 13.5.5 l
1 l
Page 15-1 : Revised paragraph 15.1, 15.2.1 l
l
& 15.2.2 l
l Page 15-2 : Revised paragraphs 15.2.3 & 15.2.4 l
l l
Page 15-3 : Added paragraph 15.2.6 l
l
- Paragraph 15.2.7 was 15.2.6 l
l
- Moved old subsection 15.3 l
j l
to Section 16 l
l l
- Subsection.15.3 was 15.4 l
1 l
- Revised paragraph 15.3.1 & 15.3.2 l
1 l
Page 15-4 : Subsection 15.4 was 15.5 l
[
- Subsection 15.5 was 15.5.2 with l
y l
revisions l
l Page 16-1 : Revised paragraph 16.2.1 l
l
& 16.2.2 j
i l
Page 16-2 : Deleted paragraphs 16.2.4-l l
& 16.2.4.1 l
l
- Paragraphs 16.2.4 & 16.2.5 were l
l 16.2.4.2 and 16.2.4.3-l l
- Revised paragraphs 16.2.3, l
l 16.2.4 & 16.2.5 l
l
- Subsection 16.3 was 16.2.5 with l
l revisions l
O-
[
Page 16-3 : Subsection 16.4 was 16.3 l
l
- Revised paragraph 16.4(1) & (3) l l
- Subsection 16.5 was 16.3.2 and l
l
'and Subsection 15.3 l
l Page 16-4 : Subsection 16.6 was 16.4 l
l Page 17-4 : Title change, paragraph 17.3.4 l
j l
- Revised paragraph 17.4.1.2' l
j l
Page 18-1 : Title change, paragraph 18.2.1 l
1 l
Page 18-2 : Title change, paragrapn 18.2.2 l
)
l
- Revised paragraph 18.3.1 l
l Page 18-4 : Title change, paragraph 18.4.1 l
l Page 18-5 : Revised paragraphs 18.4.4,
[
l 18.4.5 & 18.5 l
l Page 18-6 : Revised paragraph 18.6 l
l Page F1
- Revised organization charts l
1 l
Thru F-8 l
l Page T1-1 : Revised first paragraph, third l
[
column l
l Page T1-2 : Add ANSI N18.7 (Sections 5.2.7.1) l l
Page T1-3 : Add ANSI N18.7 (Section 5.2.17) l l
Page T2-1 : Revised Table 2 l
l Page T3-1 : Revised all paragraphs l
l Page T3-2 : Revised all paragraphs l
l Page T3-3 : Deleted l
l l
1 l
A l
QA MANUAL OPERATIONS lREV.
8 l
l P
l lDATE 06/10/86 l
l l
[ SECTION:
RECORD OF REVISIONS lPAGE 5 l
l L
l
[
l i
i i
l I
1 I
i l
RECORD OF REVISIONS l
j l
I l REVISION l
l NUMBER DESCRIPTION DATE I
e *
(
l I
l 8 (Cont.)
I i
l Page AA-1 : Revised paragraph 1.1 l
l Page AA-2 : Revised introductory paragraph l
l Page AA-3 : Revised Section 12 l
l Page AA-4 :Added l
l Page AB-3 : Title change, paragraph 2.1(1)
I l
- Revised paragraph 2.1(2) l I
Page AB-4 : Title changes, paragraphs 2.1(3) l l
l (4) & (5)
I l
Page AB-5 : Revised paragraph 2.1(6) & 2.1(8)
I i
i l
- Title changes, paragraph 2.1(7)
I l
Page AB-7 : Revised paragraph 5.1 I
I All pages l
I in Manual : Title block revised l
I I
J l9 Changes given below are identified on 7/22/87 l
l 1
the pages by a bar in the left margin, l
l placed next to the affected area.
I I
I l
Corrected by errata (including misspelled l
l words) on the following pages:
l I
l l
B-5 C-10 10-5 I
I C-1 1-4 AA-2 l
n l
C-2 5-4 AA-3 1
V) t l
C-6 7-5 1
I I
i l
Page A-1:
Title change in 2nd paragraph l
I Page A-2:. Resigned Policy l
l Page B-5:
Clarify ANO Unit 2 Code Commitments I
l Page C-1:
Added definition I
i Page C-3:
Revised definition and added new definition l
l Page C-5:
Added definition l
l Page C-7:
Revised definition l
l Page C-8:
Revised definition I
l Page 1-1 l
l thru l-3:
Rewritten to reflect current l
organization l
l Page 1-9:
Revised responsibilities l
l Page 1-10: Changed name title l
l Page 1-13: Revised responsibilities in I
l paragraph 1.4.1.3.2.
l l
Changed name title I
i l
l I
I I
I I
I I
I I
A 1
QA MANUAL OPERATIONS REV.
9 I
P l
lDATE 07/22/87 I
I 1 SECTION:
RECORD OF REVISIONS IPAGE 6 I
l L
l l
l l
l 1
I e
I I
l RECORD OF REVISIONS l
l l
l REVISION l
n l NUMBER DESCRIPTION DATE l
O I
I l 9 (Cont.)
l l
7/22/87 l
l Page 1-14: Revised responsibilities l
l within paragraphs 1.4.1.3.2.1 l
l and 1.4.1.3.2.3 l
l Page 1-15: Changed name title l
l Pages 1-15 l
l thru l-16: Revised responsibilities in l
{
j paragraphs 1.4.1.3.2.3.3 and l
l 1.4.1.3.2.4 l
l Page 1-17: Added paragraph' 1.4.1.3.2.5.
l l
Changed name title l
l Page 1-18: Delete 1.4.1.3.3.e and changed l
l name title l
l Page 1-19: Clarified paragraph l
l Page 1-20: Revised responsibilities l
l Page 1-21: Revised responsibilities in l
I l
paragraph 1.4.2.2 l
l Pages 1-21 l
l thru l-23: Paragraph 1.5 deleted and l
l paragraphs 1.6, 1.6.1, 1.6.2, l
l 1.6.3, and 1.7 renumbered l
l accordingly l
l Page 1-22: Changed name title l
l Page 2-1:
Revised paragraph 2.2.1 l
b l
Page 2-3:
Revised paragraph 2.2.5 and l
i l
l Added paragraph 2.2.6 l
l Page 2-4:
Changed name title l
l l
l Page 2-9:
Revised paragraph 2.6.6.
l l
Page 3-1:
Revised paragraph 3.2.1 l
l Page 3-4:
Revised paragraphs 3.4.4, l
[
3.5.1, and 3.5.2 l
l Page 3-5:
Changed name title
[
i l
Page 4-1:
Changed titles l
l l
Page 4-3:
Revised paragraph 4.4 l
l
[
Page 5-2:
Changed name title l
j Page 5-3:
Changed organization titles l
l Page 5-4:
Changed name title l
l Page 6-2:
Revised paragraph 6.2.4 l
l Page 7-2:
Revised paragraphs 7.2.2(1) l l
and 7.2.2(5).
Deleted l
l paragraph 7.2.2(6) l l
Page 7-5:
Revised paragraph 7.4.3 l
l Page 10-3: Revised paragraph 10.3.2.2 l
l Page 10-6: Revised paragraphs 10.5.2 l
l and 10.6 l
l Page 11-3: Title changes l
l Page 13-2: Revised paragraph 13.3.2 l
l l
A l
QA MANUAL OPERATIONS lREV.
9
[
P l
lDATE 07/22/87 l
l 1 SECTION:
RECORD OF REVISIONS lPAGE 7 l
l L
l l
l l
l 1
I t
i l
l RECORD OF REVISIONS l
l l
l REVISION l
l NUMBER DESCRIPTION DATE l
O l
l 4
l 9 (Cont.)
l l
7/22/87 l
l Page 13-4: Revised paragraph 13.5.3 l
l Page 15-2: Changed name title l
I I
l Page 16.1: Revised paragraph 16.2.2 l
l Page 16.2: Deleted paragraph 16.2.3 and
.l l
renumbered 16.2.4 and 16.2.5 l
l accordingly.
Revised new l
l paragraph 16.2.3 l
l Page 16-3: Revised paragraph 16.5.2 l
l Page 16-4: Changed name title l.
l Page 18-6: Title changes
[
j Pages F-1 l
l thru F-7: Revised organization charts l
1 Page F-8:
Deleted page l
l Page T2-1: Revised Table 2 l
l Page T3-1: Revised section 2 to Table 3 l
l Page T3-2: Changed name title in section 4.
l l
Revised section 5 to Table 3 l
l Page AB-3: Moved from page AB-4 l
l Page AB-4: Changed name title in paragraph 2.1.3 and l
l Revised paragraph 2.1.4 l
l Page AB-5: Deleted paragraph 2.1.8 l
l The following pages were revised due to l
l format changes:
l l
C-4 1-11 2-6 AB-8 l
l 1-5 1-12 2-7 AB-9 l
l 1-6 1-23 2-8 AB-10 l
l 1-7 2-2 AB-6 AB-11 l
l 1-8 2-5 AB-7 AB-12 l
1 l
I l
l l
l l
l l
l l
l I
I I
I i
I l
1 l
1 l
I I
l 1
I I
I I
l l
I I
l A
l QA MANUAL OPERATIONS lREV.
9 l
P 1
lDATE 07/22/87 l
l l SECTION:
RECORD OF REVISIONS lPAGE 8 l
l l
L l
l l
1 1
I I
1 l
l l
l TABLE OF CONTENTS l
i I
Q l
i V
l Section Subject Tab Pm Rev.
I
-l l
'l I
l APPROVAL COVERSHEET I
l RECORD OF REVISIONS l
TABLE OF CONTENTS TC-1 9
l l
TC-2 9
l TC-3 9
l-l TC-4 9
l TC-5 9
l TC-6 9
i TC-7 9
l l
l TC-8 9
l POLICY STATEMENT A-1 9
l A-2 9
l INTRODUCTION B-1 8
l l.
B-2 8
I B-3_
8 l
l l
B-4 8
l B-5 9
l l
l TERMS AND DEFINITIONS C-1 9
l C-2 9
I l
C 9 l
C-4 9
i C-5 9
i C-6 9'
l l
C-7 9
I C-8 9
I C-9 8
l C-10 9
l 1
I i
i l
I I
I I
i l
l l
l A
l QA MANUAL OPERATIONS REV.
9 l
l P
l lDATE 07/22/87 l.
I l SECTION:
TABLE OF CONTENTS lPAGE TC-1 1
I L
l l
l l
1 I
l-
i i
l l
I l
1.0 ORGANIZATION 1
1-1 9
l I
l 1-2 9
O i
1-3 e
i l
1-4 9
l 1-5 9
l l
1-6 9
l 1-7 9
l 1-8
'9 l
I l
j 1-9 9
l I
I 1-10 9
I I
l 1-11 9
l l
1-12 9
l 1-13 9
l j
l 1-14 9
l 1-15 9
l l
l 1-16 9
l 1-17 9
l l
1-18 9
l 1-19 9
l l
1-20 9
l 1-21 9
l 1-22 9
l 1-23 9
l
- 2. 0 QUALITY ASSURANCE PROGRAM 2
2-1 9
j l
2-2 9
l l
2-3 9
l 2-4 9
l l
2-5 9
l 2-6 9
l I,
l 2-7 9
l 2-8 9
l l
l 2-9 9
l l
l 1
l l.
l l-l l
A I
I l
1
()
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
i lDATE 07/22/87 l
l l SECTION:
TABLE OF CONTENTS lPAGE TC-2 l
l L
i I
I I
I I
I
1 i
I I
i i
l i
l 3.0 DESIGN CONTROL 3
3-1 9
l j
~
r
(
l 3-3 8
1 l
3-4 9
1 3-5 9
l l
4.0 PROCUREMENT DOCUMENT 4
4-1 9
l CONTROL 4-2 8
-l l
l 4-3 9
l l
5.0 INSTRUCTIONS, PROCEDURES 5
5-1 8
l l
AND DRAWINGS 5-2 9
l 5-3 9
I l
5-4 9
l 6.0 DOCUMENT CONTROL 6
6-1 8
l l
6-2 9
l 6-3 8
l l
l 7.0 CONTROL OF PURCHASED 7
7-1 8
l MATERIAL, EQUIPMENT AND 7-2 9
l l
l l
SERVICES 7-3 8
l 7-4 8
l l
7-5 9
I 7-6 8
1 i
l 7-7 8
l 8.0 IDENTIFICATION AND CONTROL 8
8-1 8
l l
l OF MATERIALS, PARTS AND 8-2 8
l COMPONENTS 8-3 8
l l
9.0 CONTROL OF SPECIAL 9
9-1 8
l PROCESSES 9-2 8
l l
9-3 8
1 10.0 INSPECTION 10 10-1 8
l l
l l
10-2 8
l 10-3 9
l 10-4 8
l 10-5 9
l l
10-6 9
l l
l l
l l
(Vl I
i l
i l
A l
QA MANUAL OPERATIONS IREV.
9 l
l P
l 10 ATE 07/22/87 l
l l SECTION:
TABLE OF CONTENTS lPAGE TC-3 l
I L
l l
l I
l l
l
l~
l l
1 I
11.0' TEST CONTROL 11 11-1 8
-l I
I 11-2 8
11-3 9
l 11-4 8
l 11-5 8
l-l 12.0 CONTROL OF MEASURING AND 12 12-1 8
l TEST EQUIPMENT 12-2 8
l l
12-3 8
l 12-4 8
l l
l 13.0 HANDLING, STORAGE AND 13 13-1 8
l SHIPPING 13-2 9
l l
13-3 8
l 1
13-4 9
l l
l 13-5 8
l 14.0 INSPECTION, TEST AND 14 14-1 8
l l
]
l OPERATING STATUS 14-2 8
l 14-3 8
l l
14-4 8
l 14-5 8
l
'( )
l 15.0 NONCONFORMING MATERIAL, 15 15-1 8
l PARTS OR COMPONENTS 15-2 9
l l
l 15-3 8
l 15-4 8
l I
l 16.0 CORRECTIVE ACTION 16 16-1 9
l 16-2 9
l l
16-3 9
l 16-4 9
l I
l 17.0 QUALITY ASSURANCE RECORDS 17 17-1 8
I 17-2 8
l l
l 17-3 8
l 17-4 8
l l
17-5 8
l l
1 1
I I
I I
l l
l I
I 1
l
,\\
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 07/22/87 l
l 1 SECTION:
TABLE OF CONTENTS lPAGE TC-4 1
1 L
i l
l l
l l
l
l i
I.
I i
18.0 '
AUDITS 18 18-1 8
l I
l 18-2 8
i l
18-3 8
l l
18-4 8
l 18-5 8
l l
18-6 9
1 I
I I
I I
I I
I 1.
l l
I i
I I
i l
I I
i i
l l
I l
l 1
I I
I I
i I
I I
I I
I O
l
[j I
I I
I 1
l l
?
,{
1 I
l I
l l
l i
1 l
l I
1 I
i l
l I
l l
l l
l l
1 I
i l
i I
I i
i l
l I
I I
i
.I I
I I
I I
I I
I I
I I
I A
l QA MANUAL OPERATIONS IREV.
9
.j
'l P
l lDATE 07/22/87 l
l 1 SECTION:
TABLE OF CONTENTS lPAGE TC-5 l
l L
l l
l l
l l
l.
a
I i
i I
I l
FIGURES l
1
- l' I
Number Title
, Tab Page Rev.
l 1
AP&L Corporate F-1 9
i Organization l
2 AP&L Corporate Services F-2 9
l 3
AP&L Generation Trans-F-3 9
l l
mission, Engineering l
Organization l
l 4
AP&L Nuclear Quality F-4 9
l Organization l
]
l
)
5 AP&L Site Nuclear Operations F-5 9
l Organization l
l 6
AP&L Plant Operations F-6 9
l Organization l
J 7
AP&L Plant Support F-7 9
i Organization l
l l
1 l
p I
d j
[
4 l
1 l
l l
1 I
I I
I I
I I
I I
l 1
I l
l l
l l
l l
1 l
l l
l l
l l
1 I
I I
i l
l l
l l
l l
1 1
^
l l
l 1
h l
A l
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 07/22/87 l
l 1 SECTION:
TABLE OF CONTENTS lPAGE TC-6 I
I L
I i
l l
1 I
l
____-__________m__
l l
1 l-TABLES l
I 1
l-t l
Number Title Tab Page Rev.
l l
l 1
AP&L Exceptions / Inter-T1-1 8
l pretations of Regulatory T1-2 8
l Guides and ANSI Standards T1-3 8
l T1-4 8
l l
l T1-5 8'
l T1-6 8
l l
l T1-7 8
l T1-8 8
l l
T1-9 8
l T1-10 8
i T1-11 8
l T1-12 8
l T1-13 8
l T1-14 8
l l
l T1-15 8
l T1-16 8
I 2
Quality Assurance T2-1 9
I Procedures Matrix l
l 3
Quality Program Policies, T3-1 9
i Procedures and Instruc-T3-2 9
l i
l tion Manuals List I
I I
I I
I I
I l
1 I
I I
I I
I l
l l
l l
l 1
l l
l l
1 1
I I
I i
l l
A l
QA MANUAL OPERATIONS lREV.
9 l
P l
lDATE 07/22/87 l
l l SECTION:
TABLE OF CONTENTS lPAGE TC-7 l
l L
I I
l l
l l
1 1
O
I I
l l
l APPENDICES l
1 I
Number Title M
Rev.
I i
i I
4 l
A Quality Program For AA-1 8
l l
Transport Packages AA-2 9
l AA-3 9
l AA-4 8
l B
Quality Program For AB-1 8
l Fire Protection-AB-2 8
l AB-3 9
l l
AB-4 9
l AB-5 9
l l
AB-6 9
I AB-7 9
l AB-8 9
l AB-9 9
l I,
l AB-10 9
l AB-11 9
l l
l AB-12 9
l l
l l
l l
I I
l 1
I I
I I
1 1
I I
l l
1 l
l l
l l
I I
I I
I I
I I
I I
I I
l l
I I
I I
i l
I i
i l
1 A
l QA MANUAL OPERATIONS lREV.
9 l
l P
i lDATE 07/22/87 I
l 1 SECTION:
TABLE OF CONTENTS lPAGE TC-8 l
l L
l l
l I
I J
l
_ _ _ = _ - _
l l
1 I
l ARKANSAS POWER & LIGHT COMPANY POLICY. STATEMENT l
I I
QUALITY ASSURANCE PROGRAM FOR OPERATION O
l l
1 lItisthepolicyofArkansasPower&LightCompany(AP&L),fromthe I
highest level of corporate management, that its Quality Assurance Program 1
J for Operation meet the requirements of the Code of Federal Regulations, l
l 10 CFR 50, Appendix B, with respect to operation, maintenance, refueling, l-repair and modifications, and inservice inspection at the AP&L nuclear l
l plant.
The program shall also meet the requirements of the ASME Boiler l
landPressureVesselCodeswithrespecttoitemsconstructed,repairedor I
replaced to Code requirements.
)
I l
J l
I l
Under the program, the Nuclear Operations Vice President is the final l
management authority responsible for assuring that this policy statement l
l and the Quality Assurance Program are implemented within AP&L.
The l
Engineering Vice President, and Administrative Services Vice President l
are responsible for the procedural implementation of the program within I
their assigned areas.
The Executive Director AND Site Operations is l
l responsible for the daily implementation of the Program's procedural l
)
lrequirementsattheplantsite.
l l
l 1
lTheNuclearQualityGeneralManagerisresponsibleforestablishingthe l
l Program.
Responsibility for approval of the Program shall be identified I
l within this manual.
l l
I I
Nuclear Quality personnel reporting to the Nuclear Quality General l
1 l
1 Manager are responsible for auditing the Program as necessary and l
inspecting / monitoring activities required by the Program to assure l
compliance with its requirements.
Disputes involving quality, arising l
lfromdifferenceofopinionsbetweenNuclearQualitypersonnelandother l
l personnel, which cannot be settled interdepartmentally, shall be l
I I
l i
l l
I I
I I
I I
l l
A QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE //22/87 l
l l SECTION:
STATEMENT OF POLICY lPAGE A-1 l
l L
l l
l l
1 I
I
l l
l 1
l presented to the Nuclear Operations Vice President for resolution.
The I
I Nuclear Quality General Manager has direct access to the Generation, Transmission, Engineering Senior Vice. President as required for items I
requiring interpretation or resolution.
I I
The Nuclear Quality General Manager through the Quality Assurance l
Superintendent is to provide for annual review of the adequacy and l
1 overall effectiveness of the Program.
Any defects in the implementation I
of either this policy or the Program that are revealed during the review l
are to be reported to appropriate levels of management together with I
appropriate recommendations.
I l
I l
1 l
Implementation of this policy is necessary in order to achieve the I
reliability and safety required at our nuclear plant.
Each person I
involved in activities concerning our nuclear plant is to be responsible I
I for ascuring quality in his own work, and for compliance with the I
requirements of the Program.
The Quality Assurance Program policies, l
manuals, and procedures are mandatory requirements which must be l
l implemented and enforced by all responsible organizations and I
l individuals.
l ns,/
l T. G. Cariipbelff g
Nuclear Oper"ations g
Vice President g
g I
l l
l Date:
g _A6 97 l
l l
1 I
I I
l I
I 1
I l
1 l
l l
l l
l l
l l
I l
1 I
I l
A l
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
STATEMENT OF POLICY IPAGE A-2 l
l L
1 l
l l
l l
I
F l
I I
I I N3.1-1981 Selection, Qualification, and Training of l
l Personnel for Nuclear Power Plants 7
l l
lTheaboverequirementsareimplementedbycontrollingactivitiesas l
l described in this manual and by procedures referenced in this manual.
I I
I I
I I
I The AP&L Quality program is also designed to comply with the following l
l codes and standards, as applicable to those activities to which they are referenced within various. sections of this manual:
1 I
I I
I I
l ASME Section III, Division 1 - 1983 Ed., Summer 84 Addenda
- l l
ASME Boiler and Pressure Vessel Code - Nuclear Power Plant l
Components I
l l
i l
l ASME Section XI - 1974 Ed., Summer 75 (ANO Unit 2)**
l l
- 1980 Ed., Winter 81 (AND Unit 1) l ASME Boiler and Pressure Vessel Code - Rules for Inservice l
l
]
l Inspection of Nuclear Power Plant Components ASNT SNT-TC-1A-1980 l
Recommended Practice for Nondestructive Testing Personnel l
l Qualification and Certification l
l l
l AWS D1.1-1985 l
American Welding Society Structural Steel Welding Code l
I l
l 1
l ll Earlier editions / addenda of the Code may be specified for repair or I
replacement of components, within the rules of ASME Section XI.
l l
l Repair / replacement activities shall be to the 1980 Edition, Winter l
l 81 Addenda l
I l
l I
I l
Definitions of terms applicable to the AP&L quality program are found in l
ltheTermsandDefinitionssectionofthismanual.
l 1
1 I
I 3
l l
l l
(V I
A l
QA MANUAL OPERATIONS IREV.
9 l
1 l
l P
l lDATE 7/22/87 l
l 1 SECTION:
INTRODUCTION IPAGE B-5 l
l L
l l
l l
1 1
I l
l l
l
]
I I
I I
l TERMS AND DEFINITIONS l
l 1
The terms used in this manual follow the definitions provided in g ANSI N45.2.10-1973, supplemented by additional terms and definitions l
l applicable to this manual.
I I
l I
I I
Approval - An act of endorsing or adding positive authorization, or both.
1 I
I I
l l
l Appurtenance - A part that is attached to a component which has been l
I I
g completed.
l 1
l' i
As-Built Data - Documented data that describes the condition actually l
l l
achieved in a product.
l l
l l
l l
1 l Assembly - A combination of subassemblies or components, or both, fitted 1
together to form a unit.
I I
I I
g Audit - An activity to determine through investigation, the adequacy'of I
and adherence to, established procedures, instructions, specifications, l
codes, and standards or other applicable contractual and licensing I
requirements, and the effectiveness of implementation.
I I
I ll 1
l Basic' Component - A nuclear plant structure, system or component l
I i
g necessary to assure the nuclear safety criteria.
g j
l l
I Bid Evaluation - A formal evaluation of all proposals received in I
response to an inquiry to determine the vendor to whom the purchase order I
will be awarded.
I I
l I
l l Certificate of Conformance - A written statement, signed by a qualified I party, certifying that items or services comply with specific l
requirements.
I l
l l
l l
l l
l l
I I
I Q
l l
l l
l Q
l A
I QA MANUAL OPERATIONS lREV.
9 l
l P
I lDATE 7/22/87 I
i 1
SECTION:
TERMS AND DEFINITIONS lPAGE C-1 I
I L
I l
l 1
1 I
I
1 l-I-
i l
l i
l-Certificate of Compliance - A written statement, signed by a qualified l
I party, attesting that the items or services are in accordance with I
specified requirements and accompanied by additional information to
~
-lsubstantiatethestatement.
l' l
l Certified Test Report - A written and signed document, approved by a l
l l
qualified party, that contains sufficient data and information to verify I
the actual properties of items and the actual results of all required i
tests.
I l
l 1
l
- l I
l Certification - The action of determining, verifying and attesting, in I
writing, to the qualifications of personnel or material.
J l
i=
l Characteristic-Anypropertyorattributeofanitem, process,or I
service that is distinct, describable, and measurable, as conforming or l
nonconforming to specified quality requirements.
Quality characteristics I
are generally identified in specifications and drawings which describe the item, process, or service.
I l-I l
Checks-Thetests, measurements,verificationsorcontrolsplacedonan l
activity by means of investigations, comparisons, or examinations, to l
determine satisfactory conditions, accuracy, safety or performance.
l I
l l
Cleanness-Astateofbeingcleaninaccordancewithpredetermined l
standards, and usually implies freedom from dirt, scale, heavy rust, oil l
or other contaminating impurities.
I I
Code Inspector - A qualified nuclear inspector (ANI or ANII) employed by I
a legally constituted agency of a Municipality or State of the United l
States, or Canadian Province, or regularly employed by an Authorized-l Inspection Agency and having authorized jurisdiction at the site of I
l manufacture for installation, repair, modification, and in-service l
inspection of ASME Boiler and Pressure Vessel items designated l'
l safety-related.
l l
l I
l-A l
QA MANUAL OPERATIONS REV.
9 i
l P
l lDATE 7/22/87 l
l l
SECTION:
TERMS AND DEFINITIONS lPAGE C-2 l
1 L
l l
l l
l l
l
l i
s i
f I ' Commercial Grade - Those items contained in Q systems and equipment that l
l are:
(1) not subject to design or specification requirements unique to g
t l
nuclear facilities or activities; (2) used in application other than l
lnuclearfacilitiesoractivities;and(3)to.beorderedonthebasisof I
specifications set forth in manufacturer's published product description.
I I
I I
I l
Component - A piece of equipment such as a vessel, piping, pump, valve or i
i I
core support structure, which will be combined with other components to g
i form an assembly.
1 I
I l
l l
Computer Code - The application-software utilized within a digital l
l computer to accomplish a specific function or task, Computer codes I
requiring Quality Assurance are those whose satisfactory performance is l
lrequiredtopreventaccidentswhichmaycauseunduerisktothehealth I
l and safety of the public or relied upon to mitigate the consequences of l
j such accidents if they were to occur.
This involves those computer' codes d
l utilized in design and analyses of Q-list compo'nents, and those utilized I
as an active portion of Q-list components.
I l
l Contaminants-Foreignmaterialssuchasmillscale, dirt, oil, chemicals l
l and any matter than renders a fluid, solid or surface impure and unclean l
laccordingtopresetstandardsofacceptablecleanness.
I I
l Contractor-Anyorganizationundercontractforfurnishingitemsor l
I l
services.
It includes the terms Vendor, Supplier, Subcontractor, I
lFabricatorandsub-tierlevelsofthesewhereappropriate.
l l
\\
Dedication - Designating a commercial grade item for use as a basic l
l component after receipt.
This implies that all required inspections, i
l examinations, testing,anddocumentationarecompletedtoassure I
compliance with the Procurement Documents.
l l
l I
.I
.I l
Defective Material - A material or component which has one or more characteristics that do not comply with specified requirements,.
l l
l 1
A l
QA MANUAL OPERATIONS lREV.
9 l
l P
l IDATE 7/22/87 l
l 1
SECTION:
TERMS AND DEFINITIONS (PAGE C-3 l
l L
l l
I I
1 4
L
1 1
1 1
1 I
i l
Deviation - A nonconformance or departure of a characteristic froml l-l I
I O
lspecifieprequirements.
l i
Documentation - Any written or pictorial information describing,
.l defining, specifying, reporting or certifying activities, requirements,-
l l
procedures,orresults.
I l
l Examination-Anelementofinspectionconsistingofinvestigationof l
l materials, components, supplies or services to determine conformance to l
J those specified requirements which can be determined by such investigation.
Examination is usually nondestructive and includes simple l
physical manipulation, gaging, and measurement.
l l
l Handling - An act of physically moving items by hand or mechanical'means, l
l but not including transport modes.
l 1
1 I
l l
Inquiry - A document that contains the necessary information for a vendor l
ltomakeaproposal.
An inquiry may include specifications pertaining to l
l the equipment, materials, or services proposed to be procured.
l O
l l
Inspector (0wner's) - A qualified inspector employed by the Owner whose l
duties include the verification of quality related' activities or l
installations or both.
I l
l l
l l
Inspection - A phase of quality control which by means of examination, I
l observation or measurement determines the conformance' of materials, l
l supplies, components, parts, appurtenances, systems, processes or l
l lstructurestopredeterminedqualityrequirements.
l 1
I j
Item - Any level of unit assembly, including structure, system, l
l subsystem, subassembly, component, part or material.
I l
l I
l J
l l
l 1
I I
4 I
i 1
l l
l l
A l
QA MANUAL OPERATIONS lREV.
9 l
l P
l 10 ATE 7/22/87 l
l 1
SECTION:
TERMS AND DEFINITIONS lPAGE C-4 l
/
I L
l l
l 1
1 I
l L----.---_-------__---_--_----___--_.--_---.---_-----.--
o
1 l
l I
I
-l Job Order (J.0.) - The Job Order is the document used for identifying and l
= administratively controlling the work effort on station equipment and j
systems.
It identifies applicable procedures and drawings; documents reviews, approvals and results of inspections and tests; and provides a l
1 mechanism for planning, scheduling and authorizing work.
l I
I i
i l
i l Manufacturer - One who constructs any class of component, part, or 1
)
appurtenance to meet prescribed design requirements.
I I
J Material - A substance or combination of substances forming components, l
l parts, pieces and equipment items.
(Intended to include such as l
1 l machinery, castings, liquids, formed steel shapes, aggregates, and l-I cement.)
l I
I I
I l Modification - A planned change in plant design or operation and l
laccomplishedinaccordancewiththerequirementsandlimitationsof l
l applicable codes, standards, specifications, licenses and predetermined I
lsafetyrestrictions.
l l
l Nonconformance - A deficiency in characteristic, document, or procedure l
l which renders the quality of an item unacceptable or indeterminate.
j l Examples of nonconformance include: physical' defects, test failures, l
l incorrect or inadequate documentation, or deviation from prescribed I
processing, inspection or test procedures.
l l
l 4
lNuclearSafetyCriteria-(1)Integrityofthereactorcoolantpressure l
l boundary; (2) Capability to shutdown the reactor and maintain it in a l
safe shutdown condition; and (3) Capability to prevent or mitigate the l
l consequences of accidents which could result in potential offsite i
l exposures comparable to those referred to in 10CFR100.11.
l l
I l
l I
I l
t I
I I
I I
I I
I A
l-QA MANUAL OPERATIONS lREV.
9 l
l P
l 10 ATE 7/22/87 l
l I
SECTION:
TERMS AND DEFINITIONS
[PAGE C-5 l
l L
l l
l I
i l
l
(
g g:
1, I
a" d
i
.)
Objective Evidence - Any statement of fact, information, or record,
.I
^l l
'g either quantitative or qualitative, pertaining to the quality of an item j
or service based on observations, measurements, or tests which can be l-
- , verified.
l l
'/
1, i-s ;
l a
j Operation - Tiie total of administrative, maintenance and monitor g
i activ'ities necessary o sustain the power generating capabilities of the l
.j g
[
plant afl;er initial start-up.
j,/ { g 0;\\ w.:ner - The person, group, company or corporation who will have or has r
x l
l I
title to the facility or installation under construction.
1 I
I I
I l
Package - A wrapping or container ' including its contents of materials or l
l l
equipment.
t l
.f J.
l Packaged Unit - An assembly of items and parts which can be disassembled l
without destroying the integrity of the individual parts.
l l
l
)
As t
i I
l Part - An item which has ' work performed on it aM 'whfch is attached to l
l and becomes part of a component lefore completi6n of the component.
l I
l hi l
\\
l l
Plant - The equipment, piping, stru tures, buildings and property that y
l l ' comprise an installation or facility.
I I
l 9
l I
?
I l
Procedure - A documeed that specifies or'cescribes how an activity is to l
l l
be performed.
It may include methods to be employed, equipment or I
materials to be used and sequence of operations.
l I
I t'
L l
l
)
'g l
Procurement Documents - Contractually binding documents that identify and I
i I
I define the requirements that items or.. services must meet in order to be I
e I
(
l censidered acceptable by the purchaser.
1 l
A l
L l
.. s c.
l
^
I, Project - A planned series of activities including all actions necessary I
to provide, utilize, and maintain a facility or portion thereof.
I
\\
l l
._ _.1_._
___ l O
I l.
l l
( )j j
A l.
QA MANUnt. OPERATIONS lREV.
9' l
I P
l
\\
lDATE 7/22/37 l
4 l
1 SECTION:
TERMS ANDxDEFINITIONS lPAGE C-6 l
I L
i i
. j' l
I o
s,)
I i
I l
+
,v Q
q 1
[
t
l l
l l
t I
Proposal - A bid, usually written by a vendor in response to an inquiry, I
I which provides the issuing party with the vendor's proposed compliance to the inquiry and the cost.
l 4
l l
l l
l l
l Purchase Order (or Contract) - A document authorizing a vendor to provide l
l equipment,materialorservicesinaccordancewithstatedtermsand l
l conditions.
I j
l l
l l
l l
Purchaser - The organization or organizations responsible for issuance l
I and administration of a contract, subcontract, or purchase order.
I I
i Q-List - A list of safety-rela +ed structures, systems, and components -
l l
that is, those structure, sys. ems, and components that are relied upon to l
remain functional during and following design basis events to ensure that 4
l the Nuclear Safety Criteria are satisfied.
l I
I I
I l Qualification (Personnel) - The characteristics or abilities gained I
through training or experience or both that enable an individual to i
perform a required function.
l l
l l
l Qualified Party - A person or organization competent and recognized as l
lknowledgeabletoperformcertainfunctions.
I I
i Qualified Procedure - A procedure which incorporates all applicable codes l
and standards, manufacturer's parameters, and engineering specifications l
landhasbeenprovenadequateforitsintendedpurpose.
I I
I Qualified Vendor List - A listing of vendors having quality assurance l
l programs consistent with the requirements of applicable portions of l
For vendors supplying ASME Code items, they shall l
I also have a quality program consistent with the requirements of I
l applicable portions of ASME Section III, Division 1, subsection NCA.
l l
1 I
l 1
1 1
I I
A l
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l 1
SECTION:
TERMS AND DEFINITIONS lPAGE C-7 l
l l
L l
l l
l l
1 I
I
l l
l l
l Quality Assurance - All those planned and systematic actions necessary to l
I I
provide adequate confidence that an item-or a facility will perform satisfactorily in service.
I I
l Quality Control - Those quality assurance actions which provide a means l
l to control and measure the characteristics of an item, process, or l
facility to established requirements.
l l
l
.I j
l I
i l
Receiving'- Taking delivery of an item at a designated location.
l i
I j
i l
l Repair - The process of restoring a nonconforming characteristic to a l
l condition such that the capability of an item to function reliably and l
l safely is unimpaired, even though that item still may not conform to the l
original requirement.
I l
1 Report - Something (document) that gives information for record purposes.
)
l 1
l Review - Ar. element of inspection to determine conformance to specified l
1 l
requirements, which can be determined by examination of documents and I
i l
activities.
l l
1 Rework - The process by which a nonconforming item is made to conform to I
a prior specified requirement by completion, remachining, reassembling or i
other corrective means.
I I
Safety-Related (Q) - Safety-related structures, systems, and components l
are those that are relied upon to remain functional during and following j
design basis events to ensure that the Nuclear Safety Criteria are l
satisfied.
l l
l I
I l
Source Surveillance - A review, observation, or inspection for the l
purpose of verifying that an action has been accomplished as specified et I
the location of material procurement or manufacture.
l 1
l l
l 1
I I
l l
l l
l A
i QA MANUAL OPERATIONS lREV.
9 I
l P
l lDATE 7/22/87 l
l J
l 1
SECTION:
TERMS AND DEFINITIONS lPAGE C-8 l
l L
i l
l I
1 I
I
l-l I
l l Transit - The state of being conveyed or transported from one place to l
I I
another.
Transit Carrier (0 pen) - Trucks, trailers, railroad cars, barges, l
l aircraft or ships which do not afford items protection from the l
environment.
I I
lTransitCarrier(Closed)-Trucks, trailers,railroadcars, barges, I aircraft or ships which provide protection of items from the environment I
by nature of their closed design.
l 1
Use-As-Is - A disposition which may be imposed for a nonconformance when I
it can be established that the discrepancy will result in no adverse l
l conditions and that the item under consideration will continue to meet l
all engineering functicial requirements including performance, I
maintainability, fit and safety.
I I
I Vendor - Any organization under contract for furnishing items or l
services.
It includes the terms Contractor, Subcontractor, Supplier, l
l O
I I
Fabricator and sub-tier levels of these where appropriate.
Q g
i l
Verification - An act of confirming, substantiating and assuring that an l
I activity or condition has been implemented in conformance with the I
specified requirements.
l l
1 l
Work Instructions - Written instructions used to transmit detailed I
information on the specific measures necessary to comply with the i
requirements of quality assurance procedures or any complex or difficult l
l quality-related task.
l l
l l
l l Work Package - A work package is a collection of applicable documents, l.
such as procedures, cleanliness control forms, inspection and test forms, I
hold card forms, Ignition Source Permits, drawings, technical manuals, I
letc.,neededtoperformthejob.
I I
I I
rm l
l 1
1
()
l A
1 QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l i
SECTION:
TERMS AND DEFINITIONS lPAGE C-10 l
l L
i l
l I
l l'
I
l I
I I
i l
1.0 ORGANIZATION l
l 1
I l
1.1 SCOPE I
I l
i l
i l This section describes the AP&L organizational structure and l
I responsibilities for establishing and executing the Quality Assurance l
l Program for AP&L's operational nuclear plant in compliance with 10CFR50, l
Appendix B and applicable licensing commitments identified in the l
Introduction.
It also includes a description of the interfaces with l
lotherorganizationswhomaybedelegatedtheworkofestablishingand l executing portions of the Quality Assurance Program.
The AP&L Corporate l
l Organization relevant to the operation of its nuclear plant is shown in l
l Figure 1.
l l
l l
l' l
I l
1.2 GENERAL RESPONSIBILITIES I
l l
l 1
l The ultimate responsibilities for an operational nuclear plant within l
l AP&L, including quality assurance, lies with the Nuclear Operations Vice j President.
He provides management assessment of the Quality Assurance l
l Program through review of Nuclear Quality audit reports and reports of l NRC activities.
l l
1
{
l l
l 1.3 ADMINISTRATIVE SERVICES l
l l
l l
l l
l Administrative Services, headed by the Administrative Services Vice l
l President is involved in contract administration, procurement and human l
resource activities requiring execution of the Quality Assurance Program.
l-The Administrative Services organization is noted in Figure 2.
The l Administrative Service Vice President provides technical direction and l
l administrative guidance to the:
I g
l l
l a.
Corporate Services Executive Director l
b.
Human Resources Executive Director l
l l
l l
1 I
I I
O I
I I
I d
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
i lDATE 7/22/87 l
l 1 SECTION:
1.0 ORGANIZATION IPAGE 1-1 l
I L
l l
l l
1 l
l l
I I
I i
l 1.3.1 CORPORATE SERVICES l
l I
l The Corporate Services Executive Director, who reports to the.
l Administrative Services Vice President, is responsible for contract-l l
administration, the procurement of materials, parts and components l
requested by Little Rock General Office (LRGO) personnel and for j
supporting the procurement activities at the plant.
l l
I l
I I
I The General Manager, Procurement & Materials Management reports to the l
l Corporate Services Executive Director and is responsible for the l
following duties and activities:
l I
1.
Provides technical direction and administrative guidance to l
the:
l l
l I
i l
a.
Manager of Procurement l
b.
Manager of Contract Administration l
l l
l 2.
Prepares purchase orders based upon receipt of reviewed and l
approved Purchase Requisitions.
l l
1 I
l l
3.
Assist responsible individuals in the initiation and I
development of a contract packages and provides for the j
administration of approved contracts.
l I
I l
l l
4.
Performs the commercial interface functions between AP&L and l
vendors / contractors.
I I
5.
Assure that quality documentation prepared by AP&L personnel is l
included in appropriate procurement documents.
l l
I I
I I
I l
l 1
I I
I l
l l
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
1.0 ORGANIZATION lPAGE 1-2 l
l L
l l
l l
l l
1
l l
l l
I I
j 1.3.2 HUMAN RESOURCES l
I I
The Human Resources Executive Director, who reports to the Administrative Services Vice President, is responsible for the administration of the l
j l
training and development effort for LRG0 personnel.
The Human Resources l
Executive Director provides technical direction and administrative l
l guidance to the Training Manager.
l l
l I
I l
1.4 GENERATION, TRANSMISSION, ENGINEERING ORGANIZATION l
l I
I l
l This Organization, headed by the Generation, Transmission, Engineering l
Senior Vice President is responsible for activities related to the l
operation of the AP&L nuclear plant.
These activities include as a l
minimum:
design, operation, maintenance, inservice inspection and test, I modification and those additional activities discussed in Sections 2 l
through 18 of this manual.
Within this organization, the Nuclear l Operations and Engineering departments are involved in activities l
requiring execution of the Quality Assurance Program (See Figure 3).
I I
1.4.1 NUCLEAR OPERATIONS l
l Nuclear Operations is under the direction of the Nuclear Operations Vice l
President who reports to the Generation, Transmission, Engineering Senior l
Vice President and is responsible for the formulation, licensing, l
l implementation and discharge of operating policies and procedures i
relative to nuclear plant operations, nuclear quality and nuclear fuel I management.
His duties include the following:
l l
l l
l l
1.
Provide technical direction and administrative guidance to the:
l l
l l
l l
a.
Executive Director AN0 Site Operations l
b.
Nuclear Services General Manager l
c.
Nuclear Quality General Manager l
l l
1 I
I I
I I
I A
I QA MANUAL OPERATIONS lREV.
9 l
P 1
IDATE 7/22/87 l
l 1 SECTION:
1.0 ORGANIZATION lPAGE 1-3 l
l L
l l
l 1
I I
I
l l
I I
l.
2.
Assure conformance to the Quality Assurance Program by l
I instituting the necessary procedures and instructions within I
the Nuclear Operations Department.
I I
l l
l 3.
Provide for review arid approval of design and engineering l
)
performed for the operating nuclear plant.
l l
4.
Provide for review and approval of procurement documents for l
equipment, material and services.
l l
l l
l 4
1 l
5.
Provide for liaison between AP&L and applicable regulatory l
agencies.
(
l 6.
Provide and maintain a qualified and suitable staff to carry l
]
l out required departmental functions.
[
l 1
I I
I I
l 7.
Provide for procurement and design review of nuclear fuel.
l I
l I
I
)
l 8.
Overall responsibility for the fire protection, emergency l
1 l
planning and radiatian protection programs implemented at the I
nuclear plant.
l I
I I
I l
1.4.1.1 Nuclear Quality General Manager j
j l
l l
l l
The Nuclear Quality Organization (NQO) as shown in Figure 4 is under the j
direction of the Nuclear Quality General Manager who reports to the l
Nuclear Operations Vice President.
The NQ0 performs reviews, l
surveillance, inspection and audit functions during the operational phase l
of AP&L's nuclear plant.
The NQ0 is also independent of plant operations l
and has sufficient independence from cost and schedule when opposed to l
safety considerations.
The Nuclear Quality General Manager shall have l
I direct access to management levels, which assures his staff the ability I
I I
l to:
identify quality problems; initiate, recommend or provide solutions-l lthroughdesignatedchannels;andverifyimplementationofsolutions.
I I
l l
l A
l QA MANUAL OPERATIONS (REV.
9 i
P l
lDATE 7/22/87 l
l 1 SECTION:
1.0 ORGANIZATION lPAGE 1-4 l
l L
I I
I I
I I
I
1
~
1 l
l l
l The qualification requirements of the Nuclear Quality General Manager are l
l I
established within his job description which includes the following l
I prerequisites:
I l
l I
I i
1.
Possess a degree from an accredited school in engineering or a l
related scientific discipline or equivalent; l
l l
l 2.
Possess a minimum of four years e.xperience in the field of l
l quality assurance / control with at least two years in the l
l nuclear field or equivalent number of' years of nuclear plant l
)
l experience in a supervisory position with at least one year l
l experience in the implementation of the quality assurance l
j I
program.
l l
l l
l 1
l 3.
Exhibit the ability to plan, schedule and direct the activities I
of others assigned to or functioning within the NQO.
l I
I Duties and responsibilities of the Nuclear Quality General Manager l
I include the following:
l
/,D l
l I
O I
I l
i 1.
Provide technical direction, administrative guidance and l
l supervision to the Quality Assurance Superintendent and Quality l
l Control Superintendent.
l I
l l
l l
l 2.
Approval of the QA Manual Operations and revisions thereto.
l I
i l
I l
3.
Approval of QA/QC procedures and revisions thereto as i
established within NQA procedures.
l I
I 1.4.1.1.1 Quality Assurance Superintendent I
l l
The Quality Assurance Superintendent reports directly to the Nuclear l
l Quality General Manager.
Duties and responsibilities of the Quality i
Assurance Superintendent include the following:
l l
l l
A l
QA MANUAL OPERATIONS lREV.
9 i
P l
[DATE 7/22/87-l l
I SECTION:
1.0 ORGANIZATION lPAGE 1-5 l
l L
l l
l 1
1 I
I
I I
I I
.]
1.
Develop Quality Assurance Program requirements for operation, I
I I
maintenance, and modification activities related to p
I I
t, I
safety-related (Q-listed) systems, structures, and components.
I I
I I
I i
l 2.
Audit of the quality activities as described in Section 18 of I
l
]
this manual.
I I
3.
Review, approval and verification of the quality assurance I
requirements placed upon contractors or vendors that provide l
j equipment, material, or services fo'r the AP&L nuclear plant.
1 l
4.
Authority to stop work where conditions exist that prohibit l
l effective quality programs, or if faulty materials, incorrect l
l workmanship or procedures are detected.
l 1
l S.
Review, approval, distribution and control of vendor QA Manuals l
and QA Procedures and revisions thereto.
l 1
I I
l l
6.
Review and approval of QA programs for outside organizations l
l participating in the AP&L QA program.
I I
J 7.
Provide and maintain a qualified and suitable trained staff to l
l carry out required staff functions, i
l l
l l
l 8.
Formulate programs for maintaining the professional competence I
of personnel within the QA Section and provide assistance in QA l
l training and indoctrination programs for management, l
engineering and plant personnel whose activities affect l
quality.
l l
l 1
l l
9.
Provide technical direction and guidance to the Quality l
Engineering Supervisors and their staff.
I i
1 I
l l
I I
I I
l A
l QA MANUAL OPERATIONS REV.
9 l
l P
l 10 ATE 7/22/87 I
l 1 SECTION:
1.0 ORGANIZATION lPAGE 1-6 l
l L
l l
l l
l l
1
l i
I I
i 10.
Inspect, audit or review practices, records, files, I
I instructions, directions or documents concerned with all areas affecting quality.
I I
I I
I 11.
Schedule and coordinate audits or surveillance efforts in the I
areas assigned, document findings, and report results to the i
Nuclear Quality General Manager and the Manager of the audited I
area.
I I
12.
Provide to the Nuclear Quality General Manager on an annual I
basis the results of a review of the quality program to l
l l
determine the effectiveness and proper implementation of the l
program.
l l
l l
l l
1.4.1.1.2 Quality Control Superintendent l
I I
I I
l The Quality Control Superintendent reports directly to the Nuclear Quality General Manager and is responsible for verifying the l
implementation of the Quality Control program at the nuclear plant.
The i
duties and responsibilities of the Quality Control Superintendent include l
l the fnllowing:
l l
1 l
l l
l 1.
Interface with plant staff in developing quality control I
requirements and inspection points for operation, maintenance l
l and modification activities related to safety-related l
l (Q-listed) systems, structures and components.
l l
l l
2.
Interface with the Quality Assurance Superintendent or his l
representative for technical assistance in resolving I
l significant conditions adverse to quality.
I I
I I
I I
l l
l 1
l l
1 I
I
-l A
l QA MANUAL OPERATIONS IREV.
9 i
P l
lDATE 7/22/37 I
I I SECTION:
1.0 ORGANIZATION IPAGE 1-7 I
I L
l l
l 1
I I
I w__-_-____--
t I
I I
l l
3.
Authority to stop unsatisfactory work and authority to place an l
I I
item in a nonconforming status when such an item is determined l
to be in violation of purchase documents, applicable codes and standards or SAP requirements.
l l
4.
Assuring surveillance, inspections and reviews of plant l
activities and documents are conducted in accordance with NQA l
and/or plant procedures.
l l
I, 5.
Provide technical direction and guidance to the QC Engineering
'l Supervisor, QC Inspection Supervisors and their staff.
I I
I I
I l
6.
Provide and maintain a qualified and suitable trained staff to l
l carry out required staff functions and formulate programs for l
maintaining the professional competence of personnel within the l
QC section.
I l
I l1.4.1.2 Nuclear Services General Manager g
I I
The Nuclear Services General Manager reports to the Nuclear Operations l
l Vice President and is responsible for providing the necessary support l
lservicesrelatedtotheeffectiveoperationandmaintenanceoftheAP&L l
nuclear plant.
The duties include the following:
I I
I I
I l
1.
Provide technical direction and administrative guidance to the:
l l
l 1
I l
a.
Nuclear Engineering & Licensing Manager l
l l
b.
Nuclear Programs Manager l
c.
Nuclear Services Manager i
l l
I I
l 2.
Interface with other departments to assure effective l
I implementation of Regulatory and Company requirements.
I l
1 I
I I
I I
I I
A QA MANUAL OPERATIONS lREV.
9 l
P l
lDATE 7/22/87 l
l l SECTION:
1.0 ORGANIZATION iPAGE 1-8 l
l L
l l
l l
l l
1 4
I i
3.
Communication interface dealing with activities between the I
nuclear plant and LRG0.
l I
(,)
l i
l l
1.4.1.2.1 Nuclear Engineering & Licensing Manager g
I I
The Nuclear Engineering & Licensing Manager reports to the Nuclear l
l Services General Manager and is responsible for management of nuclear l
l lengineeringandlicensingactivities.
These activities include direct l
interface with regulatory agencies on licensing requirements / regulations, I
lcontrolofregulatorycommitmentsandcorrespondence,safetyanalysesand i
evaluations, nuclear fuel management and core reload analyses to ensure l
lrequiredlicensesandpermitsaremaintained.
The Nuclear Engineering &
l l
Licensing Manager is also responsible for the tracking of possible I
l lnuclearsafetyconcernstoassuretimelycloseout.
l l
l i
l1.4.1.2.2NuclearProgramsManager i
I lTheNuclearProgramsfianagerreportstotheNuclearServicesGeneral l
l Manager and is responsible for providing offsite support to the nuclear l
4 I
plant in the areas of fire protection, emergency planning, radioactive l waste and health physics / radiation protection.
He is also responsible l
lforensuringplantstaffiscapableofimplementingtherequirementsof l
l the Emergency Plan and its procedures.
l l
l 1
I l
1.4.1.2.3 Nuclear Services Manager l
l l
1 I
I The Nuclear Services Manager reports to the Nuclear Services General l
Manager and is responsible for coordinating major nuclear power plant l
l projects and providing nuclear services, technical assistance and l
lcoordinationofmajorcapitalprojectsdirectedfromthecorporateoffice l to ensure safe and efficient generation of nuclear power with emphasis on I
plant reliability and cost effectiveness.
I I
I I
I l
l l
l l
A l
QA MANUAL OPERATIONS lREV.
9 l
P l
lDATE 7/22/87 l
l 1 SECTION:
1.0 ORGANIZATION lPAGE 1-9 l
l L
l 1
l l
l 1
1
i l
I I
I i
1.4.1.3 Executive Director ANO Site Operations I
l i
The Executive Director ANO Site Operations reports to the Nuclear Operations Vice President on the corporate level (see figure 5) and has l
l-direct responsibility for operating the plant in a safe, reliable and I
efficient manner.
He is responsible for operating the plant in I
accordance with the provisions of the operating licenses.
I l
l I
I l The Executive Director AN0 Site Operations has the authority to shut I
the plant down if required and has final approval of plant procedures.
I I
l The Executive Director AN0 Site Nuclear Operations is to provide technical
[ direction and administrative guidance to the:
l q
l I
I I
{
l a.
General Manager Plant Operations l
l l
b.
General Manager Plant Support
)
I c.
Plant Modifications Manager I
d.
Special Projects Manager I
I 1.4.1.3.1 General Manager Plant Operations l
l The General Manager Plant Operations (Figure 6) reports to the Executive l
)
I Director ANO Site Operations and is responsible for the actual I
operation of the nuclear units, the maintenance of plant equipment and l
l facilities and the planning / scheduling of plant work activities.
The l
lGeneralManagerPlantOperationsistoprovidetechnicaldirectionand l
l administrative assistance to the:
l I
I I
l l
a.
Operations Manager l
l b.
Maintenance Manager i
c.
Work Control Center Manager l
l l
l l
l l
l l
1 1
I I
I I
Q l
I I
Q l
A I
QA MANUAL OPERATIONS lREV..
1 9
l l
P I
lDATE 7/22/87 I
I I SECTION:
1.0 ORGANIZATION IPAGE 1-10 l
l L
I I
l l
l I
I
l l
l l
l 1.4.1.3.1.1 Operations Manager l
I l
)
The Operations Manager is responsible for directing the actual day-to-day eperations of the plant.
He supervises the operating staff and I
interfaces with the Maintenance Manager to accomplish operation-related l
]
maintenance activities.
The Operations Manager is to provide technical l
l direction and administrative guidance to the:
l l
1 l
l l
a.
Operations Superintendents I
b.
Operations Technical Staff I
i 1.4.1.3.1.1.1 l
l lTheOperationsSuperintendentsreporttoandassisttheOperations l
l Manager in directing the day-to-day operation of the nuclear plant.
They I
are responsible for coordination of the daily review of operating.
l l
surveillance tests and coordination of operation-related maintenance l
l activities. They assist the Operations Manager in the supervision of-l core refueling, which includes advance planning for the outage, plant I
preparation, equipment check-out and the refueling operations.
I i
l 1.4.1.3.].1.2 1
I I
lTheShiftSupervisorsreporttotheapplicableOperationsSuperintendents l
l and are responsible for the actual operation of the unit and for the l
l lactivitiesoftheoperatorsduringtheirassignedshift.
The Shift l
Supervisor is cognizant of operation activities being performed while on l-duty.
The Shift Supervisor on duty has the authority to shut down the l
I g
l unit if, in his judgement, conditions warrant such action.
I I
I I
I l
l 1
l l
1 i
l l
I l
1 l
1 I
I A
I QA MANUAL OPERATIONS lREV.
9 l
P l
lDATE 7/22/87-l l
1 SECTION:
1.0 ORGANIZATION lPAGE 1-11 l
l L
l
]
l I
I I
I
I l
l' I
l 1.4.1.3.1.2.
Maintenance Manager l
I l-The Maintenance Manager is responsible for the maintenance of plant equipment and facilities as defined by plant maintenance program l
l implementing procedures and to assure that maintenance of equipment is l
lconductedinconformancewithapplicablestandardscodes, specifications l
l and procedures.
The Maintenance Manager is also to coordinate I
operation-related maintenance activities with the Operations Manager'and I
is responsible to make repairs on any structure, system or component l
under his control.
The Maintenance Manager is to provide technical l
l direction and administrative guidance to the:
l l
l l
1 l
a.
Mechanical Maintenance Superintendent i
b.
Electrical Maintenance Superintendent l
1 c.
Instrument & Control Superintendent l
l l
l d.
Senior Maintenance Coordinator l
e.
Shift Maintenance Superintendent l
l l
\\
l l
l 1.4.1.3.1.3 Work Control Center Manager l
O l
l 8
i The Work Control Center Manager is responsible for the l
l planning /schedulingofstationworkactivitiesandthemaintenanceofthe l
equipment history and associated reports.
He supervises the Work Control l
Center staff and interfaces with the Operations Manager and Maintenance l
l Manager to accomplish the scheduling of the outage /non-outage work l
l activities.
The Work Control Center Manager is to provide technical l
direction and administrative guidance to the:
l l
1 l
l l
a.
Planning & Scheduling Supervisors I
b.
. Work Control Center T'-hnical Staff (Engineers) l l
l I
I I
I I
I l
l i
l l
1 l
l l
A l
QA MANUAL OPERATIONS lREV.
9 I
l P
l lDATE 7/22/87 l
l l SECTION:
1.0 ORGANIZATION lPAGE 1-12 l
l L
l l
l l
l l
l
i
.l I
I I
l I
1.
1.4.1.3.2 General Manager Plant Support l'
l l
The General Manager Plant Support (Figure 7)~ reports to the Executive Director AN0 Site Operations and is responsible for providing the l
necessary on-site support services for the operating nuclear plant in the I
areas of engineering, health physics, technical analysis, radwaste, i
I security, training and administrative services.
The General Manager l
Plant Support is to provide technical direction and administrative guide I
to the:
l l
l 1
I l
a.
Administrative Manager I
l b.
Training Manager l
c.
Engineering Manager l
l l
d.
Technical Support Manager l
e.
Security Superintendent l
l l
l I
l 1.4.1.3.2.1 Administrative Manager l
l l
1 I
I The Administrative Manager reports to the General Manager Plant Support l
l and is responsible for providing administrative services in support of I
plant activities.
The duties and responsibilities of the Administrative l
lManagerincludethefollowing:
l l
l
)
1.
Provide technical direction and administrative guidance'to the:
l 1
l a.
Office Services Supervisor l
lll b.
EIR Coordinator I
c.
Materials Management Superintendent l
l d.
Computer Support Superintendent l
l l
l 1
l 2.
Accumulation, storage and disposition of quality assurance l
l records related to all phases of the nuclear plant.
l l
l l
l l
l l
1 1
I I
A I
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 I
j i
l SECTION:
1.0 ORGANIZATION IPAGE l-13 l
I L
l l-l l
l l
l
1 1
l l
l I
l 3.
Material management, storage of materials, parts and equipment, 1
I I
issuance of tools and test equipment and the identification of O
I I
(g l
surplus materials.
l t
I I
I l
l 4.
Personnel employment and industrial relations at the plant.
l 1
I I
I i
l 5.
Maintenance, revision and development of computer software for j
the plant monitoring and control room simulator computers and~
l for providing technical assistance to the Reactor Engineering l
l l
Supervisor and Nuclear Engineers in development and use of test I
l t
l apparatus for evaluation of fuel, core and NSSS performance.
l l
I l
l l
1.4.1.3.2.2 Training Manager l
l 1
)
l I
l l The Training Manager reports to the General Manager Plant Support and is l
1 lresponsibleforthetrainingandre-trainingofplantpersonneland l general office personnel as established by plant procedures.
The l
Training Manager directs the activities of the ANO training staff and l
l l provides technical direction and administrative guidance to the:
I I
l l
a.
Unit 1 Operations Training Supervisor l
j b.
Unit 2 Operations Training Supervisor l
l c.
Maintenance Training Supervisor l
j d.
Administrative Training Supervisor l
l e.
Technical Support Training Supervisor l
1 l
l l
1.4.1.3.2.3 Engineering Manager l
l l
l l
l l
1 l
The Engineering Manager reports to the General Manager Plant Support and j
is responsible for providing on-site engineering support services j
(including fire protection and prevention) to the plant staff.
The l
'I Engineering Manager is to provide technical direction and administrative I
I i
l guidance to the:
l I
I I
I I
l l
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
1 IDATE 7/22/87 l
l 1 SECTION:
1.0 ORGANIZATION lPAGE 1-14 l
l L
l l
l l
l I
l
1 l
l l
l
)
I i
I a.
Reactor Engineering Supervisor l
b.
Plant Engineering Superintendent l
l c.
Engineering Services Supervisor l
d.
Operations Assessment Superintendent I
l I
l'1.4.1.3.2.3.1 l
1 l
The Reactor Engineering Supervisor is responsible for monitoring reactor l
l core and Nuclear Steam Supply System (NSSS) performance; conducting l
lreactorperformanceandphysicstestingtoassuresafeandreliable l
operation and to provide current, accurate information to operations; I
lcollectionandtransmittalofnuclearfuelmanagement.datatotheCore l
l Reload Design Sr. Engineer in Little Rock and the reactor vendors as I
required; on-site safeguards and accountability of the nuclear fuel; and I
assisting in the planning of all fuel movements' including new fuel l
receipt and inspection, fuel shuffling at refueling, inspection of l
l irradiated fuel and shipment of spent fuel.
l l
l i
l l
l 1.4.1.3.2.3.2 l
O l
l l
The Plant Engineering Superintendent is respor,sible for drawing control, I
lengineeringsupportofplantactivities,evaluatingequipmentandsystem l
l performance and plant efficiency, and investigating and evaluating l
equi ment malfunctions or failures.
I i
1.4.1.3.2.3.3 I
l The Engineering Services Supervisor is responsible for the implementation l
l and coordination of the Inservice Inspection program, site welding' l
l program, and the Inservice Testing program at the plant.
He is also l
responsible for providing engineering support to the fire protection l
program and coordination of the industrial safety and fire prevention l
l 1
I I
l l
l l
l 1
A QA MANUAL OPERATIONS lREV.
9 l
P l
lDATE 7/22/87 l
l l SECTION:
1.0 ORGANIZATION lPAGE 1-15 l
l L
l l
l l
l l
l
~
l l
l l
l l'
l l
program.
This program includes conducting periodic checks to examine l
lcontrolofcombustibles,housekeepingandotherfirepreventionefforts l
as well as to provide a centralization of OSHA and plant safety l
l programs..
l l
l 1.4.1,3.2.3.4 l
l l
l The Operations Assessment Superintendent provides the capability to l
l perform engineering evaluations of equipment and system performance over l
extended periods of operating experiences which occur both at the AP&L l
nuclear plant and at other nuclear power plants and to make l
recommendations as a result of these evaluations to help plant operations l
personnel in preventing or dealing with'similar occurrences..He also l
I l
l provides technical direction and administrative guidance to the Shift l
l l
Technical Advisers.
l l
l-l l
l 1.4.1.3.2.4 Technical Support Manager l
l 1
I I
I l
The Technical Support Manager reports to the General Manager Plant j
j Support and is responsible for the establishment and impl mentation of l
the health physics, radiochemistry, chemistry and environmental j
l monitoring and radioactive waste programs at the operating plarit.
His l
duties and responsibilities include the following:
l j
l l
1 I
l l
1.
Provide technical direction and administrative guidance to the:
l I
l I
l l
a.
Health Physics Superintendent l
l b.
Technical Analysis Superintendent I
lll l
l c.
Radwaste Supervisor l
1 I
I l
2.
Analyzing the reactor plant water conditions and providing l
recommendations to maintain conditions.
I I
l l
1 I
i l
1 l
A l
QA MANUAL OPERATIONS REV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
1.0 ORGANIZATION lPAGE 1-16 l
l L
l l
l 1
I I
I
l I
I I
l 3.
Process, package, store, and ship radwaste generated at the l
I I
nuclear plant in accordance with plant procedures and state and l
l f ederal regulations.
l l
l l
4.
Establish water chemistry criteria, analyze secondary plant 1
I water and auxiliary water conditions and provide l
I recommendations to maintain conditions within acceptable l
l limits.
I I
5.
Assure radiation exposure to. plant personnel is maintained as l
l low as reasonably achievable and authority to stop work in-l l
l radiation areas if it is determined that a potential for an l
unanticipated excessive exposure to plant personnel or the l
l l
environment may exist.
g l
i i
1.4.1.3.2.5 Security Superintendent l
I I
I The Security Superintendent reports to the General Manager Plant Support l
l l and is responsible for plant security including coordination of efforts I
of the security force and to manage the operation of the security system.
l I
1 l1.4.1.3.3PlantModificationsManager I
I The Plant Modifications Manager reports to the Executive Director ANO 1 Site Operations and is responsible for directing the activities of his i
lstaffrelatingtoworkassociatedwithplantconstructionand I modifications, interfacing with other departments to assure effective l
l implementation of job assignments and providing cost and schedule I controls for department activities.
He is also responsible for providing I
engineering support during the implementation and closeout of design l
l modifications generated from LRGO or the plant.
He provides technical ldirectionandadministrativeguidancetothe:
l l
1 I
I I
I I
I I
I A
l QA MANUAL OPERATIONS IREV.
9 l
P l
lDATE 7/22/87 I
I 1 SECTION:
1.0 ORGANIZATION IPAGE 1-17 l
l L
l l
l 1
I I
l
i i
I I
l' I
a.
Construction Superintendent i
I I
b.
Project Engineering' Superintendent l
c.
Field Engineering Supervisor y
d.
Project Controls Supervisor l
I I
I I
1.4.1.3.4 Special Projects Manager j
i I
The Special Projects Manager reports to the Executive Director AND Site l
l Operations and is responsible for on site Licensing activities I
l I
g and the administration and control of special projects pertaining to l
l plant operations, maintenance and administration.
The Special Projects I
Manager is to provide technical direction and administrative guidance to I
the:
l l
l I
I 1
(
l a.
Plant Projects Supervisor I
I I
b.
Plant Licensing Supervisor g
I c.
Plant Controller 1
)
l l
i I
l Additional duties include:
1 O
l l
l 1.
Serving as chairman of the Plant Safety Committee l
l 1
I I
I 2.
Interfacing with on-site regulatory agencies and the Nuclear i
l l
Engineering & Licensing Manager pertaining to Licensing and l
l regulatory matters.
I I
l I
I I
3.
Providing evaluations and recommendations in meeting regulatory l
l commitments.
I i
1.4.2 ENGINEERING I
I I
I g
LRGO Engineering is under the direction of the Engineering Vice President g
I who reports to the Generation, Transmission, Engineering Senior Vice I
I I
President.
The Engineering Vice President is responsible for providing l
1 1
I I
i A
I QA MANUAL OPERATIONS IREV.
9 l
l P
l lDATE 7/22/87 l
I 1 SECTION:
1.0 ORGANIZATION lPAGE 1-18 I
I L
l l
l l
l l
l
I I
I I
I l
technical support to the AP&L nuclear plant in the areas of generation l
I I
engineering and technical support services.
He provides technical g
(
l direction, administrative guidance and supervision to the:
l l
l 4
I I
I a.
Generation Engineering General Manager i
b.
Technical Support Services General Manager 1
I I
I 1.4.2.1 Generation Engineering y
I I
The Generation Engineering General Manager reports to the Engineering l
l Vice President and is ' responsible for LRGO design and engineering l
l activities related to nuclear plant operations.
His duties include the 1
following:
l l
l 1
l I
l l
l 1.
Provide technical direction and administrative guidance to; I
l l
l l
l l
l a.
Mechanical Engineering Manager l
I i
b.
Electrical Engineering Manager l
l c.
Civil Engineering Manager l
l d.
Instrumentation and Controls Engineering Manager l
l 2.
Assure conformance to the Quality Assurance Program by l
l instituting the necessary quality-related procedures and I
l l
instructions within Generation Engineering.
l l
l l
l 3.
Provide for review and approval of design and engineering l
l l
activities performed by contractors, vendors, and LRGO l
personnel for Generation Engineering projects.
l l
1 1
4.
Provide for review and approval of procurement documents for l
equipment, material and services for LRGO engineering projects, 1
l as appropriate.
I I
I i
i l
I I
l l
A QA MANUAL OPERATIONS IREV.
9 I
P l
lDATE 7/22/87 I
I l SECTION:
1.0 ORGANIZATION lPAGE 1-19 l
l L
1 I
l l
l I
I
i l
l 1
1 I
l 5.
Provide and maintain a qualified and suitable trained staff to I
l carry out required departmental functions.
l
_O l1.4.2.2 l
Technical Support Services General Manager l
g I
I The Technical Support Services General Manager reports to the Engineering l Vice President and is responsible for providing support to the AP&L l
nuclear plant in the areas of plant performance, maintenance and l
l l
availability, planning and scheduling, chemistry, environmental l
l monitoring, metallurgy and nondestructive examination.
His duties 1
include the following:
l I
I I
l-l 1.
Provide technical direction and administrative guidance to:
l I
I I
I I
a.
Production Services Manager
'l b.
Technical Services Manager I
c.
Planning, Scheduling and Cost Control Manager i
I I
d.
Technical Analysis Manager
)
l I
l 1
2.
Assure conformance to the Quality Assurance Program by l
instituting the necessary quality-related procedures and 1
instructions within the Technical Support Services Department.
l l
l l
3.
Provide for coordination of environmental surveillance programs I
l 4.
Direct development of programs aimed at maximizing efficiency l
l and availability.
l 1
l' I
I I
5.
Provide for review and analysis of outage data and make l
l recommendations for improving availability or performance.
1 I
i 6.
Provide project control systems, methods and reporting formats I
to support managerial requirements.
I l
l I
I I
i l
l A
l QA MANUAL OPERATIONS REV.
9 l
P l
lDATE 7/22/87 l
l l SECTION:
1.0 ORGANIZATION lPAGE 1-20 l
l L
l l
l l
l l
1 1
l I
i l
l l
7.
Direct the plant maintenance support activities that are l
l l
I assigned to the LRGO.
O l
l g
Provide and maintain a qualified and suitably trained staff to l
8.
l carry out required departmental functions.
I I
I I
I l
9.
Administration of LRG0 first tier procedures in support of the l
QA Manual Operations.
I I
I 1.5 INDEPENDENT REVIEW ORGANIZATIONS I
I In add'ition to the responsibilities of key individuals within the AP&L l
j l
organization who are involved with the overall quality program, AP&L has I
established the following committees as a management tool to I
independently review activities occurring during the operational phase of I
lanuclearplant.
I i
l
- 1. 5.1 Safety Review Committee (SRC) i I
The SRC reports to the Nuclear Operations Vice President and is l
responsible for providing off-site independent reviews, and/or audits I
relating to:
the Safety Analysis Report, Technical Specifications, l
Procedures and changes thereto; unreviewed safety questions; violations, I
Ig deviations and reportable events; and any other matter involving safe I operation of the nuclear plant which the committee deems appropriate or I
is referred to them by the on-site operating group.
The SRC is also to I
review the reports and meeting minutes generated from the Plant Safety l
Committee.
I i
l1.5.2 Plant Safety Committee (PSC) l I
l The PSC reports to the Executive Director AND Site Operations and is I
responsible for reviewing activities specified in the Technical i
l I
- Specifications for the purpose of
l l
l 1
I l
A l
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
1.0 ORGANIZATION lPAGE 1-21 I
I L
l l
l l
l l
1 L- - -- -------------
i i
l I
i 1.
Rendering determinations in writing with regard to whether or
_l I
I not an unreviewed safety question (defined by 10CFR50.59) is l
involved; and I
I I
I l
2.
Furnishing written recommendations' to the Executive' Director i
AN0SiteOperationsforadprodal.
l l
1 These activities include changes to plant procedures and Technical l
l Specifications, proposed modifications to plant systems, changes to l
plant security and emergency plans, and review of facility l
operations to detect potential nuclear safety hazards.3 l
l l
a I
I i
l 1.5.3 Committee Structure I
h I
I l
I I
l The organization structure and administrative requirements specific to l
each committee are described in the Technical Specifications for each l
l operating unit and in internal procedures / documentation.
l l
1 l
I l
1.6 ORGANIZATIONAL INTERFACES AND RESPONSIBILITIES l
O I
l l
I l
As owner and operator, AP&L assumes full responsibility and authority for l
l the plant including action to absure that the plant is operated in i
accordance with sound engineering practices, Licensing requirements and l
lapplicablecodes,specificationsandprocedures.
1 l
I Each supplier of equipment, material or services and each maintenance or l
modification contractor is responsible for administering the applicable l
lqualitycontrolfunctionsasrequiredbyAP&L.
NQ0 is responsible for l
assuring by surveillance, inspection, audit or review of objective l
I I
evidence (e.g., review audit reports conducted by others,.etc.) that I
I l
these functions are accomplishes for systems, structures and services l
lthataffectthesafetyandintegrityoftheplant.
l 1
l l
l l
l 1
I I
i 1
O l
l l
l l
\\
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 I
i l
1 SECTION:' 1.0 ORGANIZATION lPAGE 1-22 1
l L
l 1
l 1
I l
l l
l
l l
I I
l Visits to manufacturer's shops by Quality Assurance personnel'are l
I conducted, when deemed necessary, based upon safety significance, complexity, method of acceptance and past history of the vendor, to I
establish product quality and to assure that quality assurance and I
quality control programs function in accordance with AP&L requirements.
l l
l l
l' I
I I
I I
I l
l l
l l
1 1
I l
l l
l 1
I I
l l
l l
1 i
i l
I I
I l
1 I
I I
I I
I I
I O
l l
i l
i I
I I
i i
i l
i I
I I
I I
I I
I I
l l
1 I
I I
I I
l l
l 1
I I
I I
I I
I I
l l-1 I
I I
l A
I QA MANUAL OPERATIONS REV.
9 I
I P
l IDATE 7/22/87 l
l I SECTION:
1.0 ORGANIZATION lPAGE 1-23 l
l L
1 1
I l
I I
l-I
I I
I I
l
- 2. 0 QUALITY ASSURANCE PROGRAM l
1 l
l 2.1 SCOPE l
I I
l l
I This quality program is to assure that AP&L's nuclear plant is operated i
in a safe, reliable and efficient manner and in accordance with NRC
[
regulations, applicable industrial standards and codes and applicable l
Company policies, rules, procedures and licensing documents.
A matrix of l
quality procedures cross-referenced to each criterion of 10CFR50, App. B, l
lisincludedinTable2tothismanual.
l l
l l
2.2 GENERAL l
l-
{
2.2.1 i
l I
This quality program is applied to those safety-related structures, I
systems and components and to those expendable and/or consumable items
- l whose satisfactory performance is required to prevent accidents which may l
cause undue risk to the health and safety of the public or to mitigate I
l the consequences of such accidents if they were to occur.
These l
structures, systems, and components are identified in the summary level l
l and component level Q-lists f each nuclear unit.
The Summary Level l Q-Lists (SLQL) are located in the SAR's and information for the component l
l 1evel Q-lists (CLQL) are maintained current in the Station Information i Management System (SIMS) for each nuclear unit.
When structures, systems l
landcomponentsasawholeareontheSLQLorCLQL,portionsnotassociated I with a loss of safety function as determined by Engineering are to be l
considered Non-Q, unless otherwise dispositioned by Engineering.
I I
I I
- Expendable and/or consumable items are to include, as a minimum:
l nuclear fuel, weld rods, boric acid, and diesel fuel.
l l
l l
l 1
I I
I I
I I
I l
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
2.0 QUALITY ASSURANCE PROGRAM lPAGE 2-1 l
l L
I I
I I
I I
l
4
\\
- p'.
l l
t
~
I I
l 2.2.2 I
I I
f~
l l
,(,
I Expendable and/or consumable items where quality is necessary for the
}
performance of Q-listed structures, systems and components are. identified
_g I
and controlled in accordance with plant Technical Specifications and/or.
l
'a procedures.
,I h
f.j-The following expendable ard/or consumable items are to be controlled in 4
g g
i the.following manner to assure service quality:
l I
I i
1 l
1.
Diesel Fuel - Service quality is assured by applicable i
l I
l provisions / tests required by the Technical Specification for l-l l
each operating nuclear unit.
I I
l l
I
'l
.r.
Welding Rod - Service quality is assured by procurement from an i
evaluated source, requiring material test results when l,
I specified by the ASMF. Code or applicable design document, and l
l controllingtherodon'-siteprj;cv'touse,toprevent l
[
degrads t.i.in.
l O
l
~
ll l
3.
Boric R id - Service quality is assured by procurement from an
-l ev.rWated source, requiring a batch analysis to assure i
I conformance with our specification requirements, and on-site l
l control prior to use, to prevent degradation.
I i
l 2.2.3 l
l The quality pyogram for transport packages containing radioactive I
uterials is midrassed in Appendix A of this manual, and implemented I
l through appropriate LRGO and dlant procedures.
The effectiveness of this l
rdogram is verified througIsshequied audits conducted by the NQ0, under l
lthecognizanceoftheSRC.
l 1
I I
I I
I I
I
^
l l
l A
l QA MAH At GPERATIONS REV.
9 10 ATE 7/22/87 l
l l
P l
l i
l SECTION:
2.0 QUAUTi ASSURANCE PROGRAM lPAGE '2-2 l
l L
l 1
J l
l l
I I
1.
i
~
1 d
l I
I I
l 2.2.4 l
l l
i The quality program for fire protection is addressed in Appendix B of lthismanualandintheapplicablesectionof.theSARandTechnical l
l Specifications for each operating nuclear unit, and implemented through l
lappropriateLRGOandplantprocedures.
The effectiveness of the fire l
protection program is verified through scheduled audits conducted by the l
NQO, under the cognizanco of the SRC.
l l
l l
2.2.5 I
lTheSLQL(aspartoftheSAR)isunderthecontroloftheNuclear l
l Engineering & Licensing Manager.
The Nuclear Engineering & Licensing I
l Section maintains an up-to-date list of personnel issued a copy of the l
l l
SAR for each nuclear unit and assures that reviews, approvals, I
ldistributionsandchangestheretoareperformedinaccordancewith l
ll approved procedures.
Changes to the SLQL require review / approval by the l
lapplicableEngineeringManager,QualityAssuranceSuperintendentand i Nuclear Engineering & Licensing Manager.
I l
I 2.2.6 l
1 I
I l
I l The CLQL is maintained on a computer data base (SIMS) and is controlled l
linaccordancewithLRGOandplantprocedures.
Generation Engineering is l
responsible for the technical adequacy of the CLQL and assigned l
lindividualswithintheWorkControlCenterareresponsibleforthe I
administrative controls on the CLQL within SIMS.
Evaluations, reviews I
and approval to changes to the CLQL are performed in accordance with I
applicable LRGO and plant procedures, l
I l
i I
I 2.3 RESPONSIBILITIES I
I I
I I
I I
I I
I I
I i
l l
l A
I QA MANUAL OPERATIONS 1REV.
9 l
l P
l IDATE 7/22/87.
l l
1 SECTION:
2.0 QUALITY ASSURANCE PROGRAM IPAGE 2-3 l
l L
i I
I I
I I
I
l l
I I
l 2.3.1
]
1 I
l 1
- 'q l AP&L recognizes that quality assurance is an interdisciplinary function l
involving many organizational groups, encompasses many functions and l
l activities and extends to various levels in all participating l
l organizations (fromtheExecutiveVicePresidentstoallworkerswhose I
activities may influer.ce quality).
This quality program designates I
responsibilities and duties of specific individuals, which may be l performed by their appointed designees.
l 1
l l
l l
2.3.2 l
I I
I I
l This quality program assigns the responsibility for quality to the I
departments performing the work and includes as a basic requirement that l
l individuals responsible for verification of conformance are qualified and l
ldonotperformordirectlysupervisethework.
Additionally, independent l
l reviews, audits and surveillance are provided by individuals not l
l reporting to the groups responsible for performing the work.
l 1
l l2.3.3 l
1 I
This quality program also includes provisions that require suppliers, g
I contractors, subcontractors, consultants, etc. to maintain and use
]
quality assurance programs reviewed and approved by the Quality Assurance l
k l
Superintendent.
Audits or surveillance by the NQ0 provide assurance of l
lcompliancewithapplicableprocedures.
I I
l2.3.4 l
l l
I The Core Reload Design Sr. Engineer within the Nuclear Engineering &
l I
Licensing section and the Reactor Engineering Supervisor are responsible
]
for the assurance that nuclear fuel used in AP&L nuclear plar.ts is l
l designed, procured, manufactured, and utilized in accordance with I
regulatory requirements, and related industrial codes and standards.
I I
I I
l A
l QA MANUAL OPERATIONS REV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
2.0 QUALITY ASSURANCE PROGRAM lPAGE 2-4 I
I L
l l
l I
I I
l
I I
I I
l On-site quality control of nuclear fuel is implemented through the.use of.
l plant administrative procedures.
These procedures include the receipt, l
I inspection, handling, storage, and accountability of Special Nuclear l
l Material (SNM).The Reactor Engineering Supervisor maintains a listing l
l of those individuals qualified to perform receipt inspections, l
I I
I I
l 2.4 PROCEDURES l
1 I
I i
l 2.4.1 l
1 I
I I
l Activities which affect quality are defined in appropriate procedures, I
l which are developed to cover AP&L administration and control.
The l procedures state the policies and instructions necessary to fulfill the I
intent'of the program.
Procedures provide for standard forms, lists, and I check-offs used in. documenting the inspections, certifications, reviews, I
surveitlances and audits.
Programs and procedures are modified or i
supplemented from time to time as.the need for change arises during the l
llifeoftheplant.
Quality program policies, procedures and instructions I
are contained in the' documents listed in Table 3.
l O
l l
l 2.4.2 i
I I
I I
l Procedures assure that activities affecting quality are performed under I
suitably controlled conditions.
Controlled conditions include the use of I
appropriate equipment; suitable environmental conditions for performing l
the activity such as adequate cleanness; and assurance that required l
l prerequisites for the given activity have been satisfied.
Administrative l
procedures also assure that the need for special controls, processes, I test, and equipment to attain the required quality and the need for l
verification of quality by inspections, evaluation or test is taken into I
account.
l l
l l
1 I
I I
I I
I I
I l
l A
l QA MANUAL OPERATIONS REV.
9 l
l P
l lDATE 7/22/87 I
i l SECTION:
2.0 QUALITY ASSURANCE PROGRAM
'lPAGE 2-5 l
l L
l l
l 1
I l
1
l l
l l
I l
2.4.3 l
1 1
l l
Other AP&L organizations outside of Generation, Transmission,' Engineering lmayestablishwrittenprocedurestocontrolsupportactivitiesaffected l
l by the requirements of this quality program.
Procedures developed by l
q I
such organizations are prepared and reviewed for technical adequacy g
l within the cognizant organization, reviewed by the Quality Assurance l
)
Superintendent and approved by the cognizant organization's department l
I head.
l I
I I
I l
2.5 PROGRAM REVISION AND CONTROL I
I l
l I
I 2.5.1 l
l 1
l l
l 1
Program revision and control shall be the responsibility of the Nuclear I
Quality General Manager.
l l
1 l2.5.2 i
I gQ lProposedchangestotheQualityAssuranceManualOperationsaretobe
_l l
submitted by the Quality Assurance Superintendent to affected LRGO and l
plant management personnel for review and comment prior to approval and i
l transmittal to the Nuclear Regulatory Commission.
After resolution of l
comments, changes are to be approved by the Quality Assurance l
l Superintendent, Nuclear Quality General Manager and the Nuclear l
j lOperationsVicePresident.
I I
2.5.3 I
I lTheNuclearRegulatoryCommissionistobenotifiedofchangestothis l
quality program annually for those changes that do not reduce the i
j l
commitments in the program description previously accepted by the Nuclear l
l Regulatory Commission.
Changes to the program description that reduce l
the commitments are to be submitted and approved by the Nuclear l
l I
l A
l QA MANUAL OPERATIONS REV.
9 l
l P
l lDATE 7/22/87 l
I l SECTION:
2.0 QUALITY ASSURANCE PROGRAM lPAGE 2-6 l
l L
I l
l 1
1 I
I
l l
I I
I I
Regulatory Commission prior to implementation.
The Nuclear Quality l
I General Manager is to determine if changes do. or do not reduce the commitments of this quality program.
I I
I I
I l
i 2.6 PERSONNEL l
l l
l l
l 2.6.1 l
l l
l l
l l
Employees whose duties and responsibilities are related to the quality l
l program activities at or in support of the nuclear plant are to l participate in appropriate indoctrination and training programs to assure I
that suitable proficiency is achieved and maintained in the work they are I
performing.
Such training shall include, as a minimum:
plant security-l (badged personnel only); discussion of the overall Company policies, l
l procedures and instructions which estaolish the quality program; an i
explanation of the AP&L quality organization; and a discussion of those l procedures which implement the quality program related to'the employee's I
specific job-related activity.
l 1
I l2.6.2 l
1 I
The education, experience and responsibility requirements of individuals l
l involved in this quality program are documented in job descriptions which 1
J are approved and periodically reviewed by management.
Requirements for I
education, experience and proficiency levels are commensurate with the I
degree of importance of the job assignment.
Experience and training i requirements for plant staff personnel are to meet the requirements of I
ANSI N18.1-1971 and Regulatory Guide 1.8 (9/75), unless otherwise noted I
in Table 1.
Personnel whose qualifications do not meet those specified I
l linANSIN18.1-1971, and who are performing inspection, examination and l
l testing activities during the operational phase of the plant, are to meet l
ltherequirementsofANSIN45.2.6-1978, unless otherwise noted in Table 1.
I I
I I
I I
l I
l l
l A
QA MANUAL OPERATIONS REV.
9 l
l P
l IDATE 7/22/87 l
l 1 SECTION:
2.0 QUALITY ASSURANCE PROGRAM
[PAGE 2-7 l
l L
l l
l l
l l
l
l l
I I
l 2.6.3 1
I i
q l
l l
Personnel performing inspection and examination activities are to be l
indoctrinated and trained to assure they are aware of the requirements l which govern their activity.
Inspection and examination personnel are to l
be qualified according to the applicable codes, standards, l
specifications, regulatory requirements and LRGO and plant procedures.
I Personnel performing inspections on those activities occurring during the l
l operational phase that are comparable in nature and extent to related I
activities occurring during initial plant design and construction are to i
meet the provisions of Regulatory G., % 1.58, rev. 1 (9/80) and ANSI l
l N45.2.6-1978, in lieu of ANSI N18.1-1971.
l l
l l
2.6.4 l
l lPersonnelinvolvedwithweldingofmaterials,systemsorcomponentsare l
to meet the appropriate qualification requirements of the ASME Boiler and l
Pressure Vessel Code, Sections III and XI, or for structural welds, the i American Welding Society (AWS) Structural Steel Code 01.1.
Personnel l
O l
l Q
involved with nondestructive examination of materials, components or I
systems are to meet the qualification requirements of the American l
l Society Nondestructive Testing Standard SNT-TC-1A, or ASME Section III l
l and XI for ASME Code materials, components or systems.
Personnel are to I
be certified to perform these tasks in accordance with these codes and I
standards.
l l
1 I
I l
2.6.5 l
1 1
I I
i Personnel performing audits of the quality program are to meet the l
i l
experience, training and qualification / certification requirements of l
ANSI N45.2.23-1978, and regulatory guide 1.146 (8/80), unless otherwise l
lnotedinTable1.
l 1
I i
1 I
I l
l l
l r
l l
1 I
i l
A l
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
2.0 QUALITY ASSURANCE PROGRAM lPAGE 2-8 l
l L
l l
l I
I I
I l
I I
I l
l 2.6.6 I
I I
Personnel appointed to the SRC shall collectively have the experience l
landcompetencerequiedbyANSI/ANSN3.1-1981.
Personnel appointed to I,
I the PSC shall collectively meet those requirements identified in the i
Technical Specification applicable to each nuclear unit.
l l
l l
2.6.7 l
l Training records are to be maintained in accordance with AP&L approved l
l procedures.
For formal training programs, documentation is to include l
ltheobjective,contentoftheprogram, attendees,anddateofattendance.
I I
l 2.7 PROGRAM REVIEW I
1 l
2.7.1 l
l l
The Nuclear Quality General Manager through the Quality Assurance l
Superintendent is responsible for a raiew of this program on an annual l
j p
l V basis to determine the effectiveness and proper implementation of the l
l quality program.
I l
l 1
I i
l 2.7.2 l
l l
1 l
Management reviews of the status and adequacy of the quality program are I
accomplished through regular reports and presentations by the NQ0 and l
through reviews of quality assurance audit reports.
Quality Assurance l
l reports supply data on the status of outstanding audit and corrective l
l action items and may identify the status of other significant quality l
program activities as requested by management.
I I
I I
I l
l 1
l l
l l
l l
l 1
O I
I I
I i
b l
A l
QA MANUAL OPERATIONS IREV.
9 l
l l
P l
lDATE 7/22/87 l
l l
l SECTION:
2.0 QUALITY ASSURANCE PROGRAM lPAGE 2-9 l
)
I L
l l
l l
l l
l 1
l 1
-l l.
j l
3.0 DESIGN CONTROL 1
l l
1.
3.1 SCOPE l
)
l I
i l
I k
j Design activities are tc be controlled to assure that proposed plant l
changes to the structures, systems, equipment and components conform to l
applicable regulatory requirements and that design bases are correctly l
I translated into appropriate design documents.
Design Control. activities l
are to be in accordance with the requirements of Regulatory Guide 1.64 -
l l
Rev. 2 (6/76) unless otherwise noted in Table 1.
l 1
l I
l 3.2 GENERAL 1
l l
l J
l l
3.2.1 l
1 l
l l
Generation Engineering, Project Engineering and Plant Engineering l
are responsible for the continued upgrading and modification of plant
-]
I design.
Design documents (drawings, specifications, procedures and l
instructions) originating or released through these departments are to j
)
be based upon the required re;;ulatory requirements, licensing based.
l documents, functional requirements, quality standards and design bases l
I I
in accordance with NRC licensing requirements.
Design activities may l
l l
include calculations, analyses, materials selection, equipment l
arrangement and layouts, accessability for inservice inspection, and the j
specification of test and inspection criteria.
Those design activities l
l I
l performed by individuals within Generation Engineering, Project I
l Engineering and Plant Engineering are controlled by the use of plant l
]
I i
I modification process (PMP) control procedures and by applicable LRG0/ plant I
I l administrative and departmental procedures.
These procedures include j
l l controls to assure that verified computer codes are certified for use and l
l l that their use is specified.
l_
I I
i l
l l
1 l
l l
i l
1 l
I I
l l
I I
I h'T l
A l
QA MANUAL OPERATIONS lREV.
9 l
j l
P l
lDATE 7/22/87 l
1 l
1 SECTION:
3.0 DESIGN CONTROL lPAGE.3-1 l
1 L
l l
l l
l l
l
I l
l i
I I
l 3.4.4 l
l d
l I
Design work performed by organizations outside of AP&L is to recefve a
~
documented review and approval by engineering personnel in accordance l
l l with PMP control procedures and as applicable, LRG0/ plant departmental l
I I
I procedures, j
g I
I I
l l
3.5 DESIGN CHANGE l
I l3.5.1 l
l l
{
Methods for the preparation, review, approval and. implementation of l
l design changes, including field changes, are documented in PMP control l
)
procedures and departmental procedures for Generation Engineering, l
l Project Engineering and Plant Engineering.
Design changes are subject to l
l l
review and verification by the same organization which reviewed and i verified the original design unless otherwise specified in departmental l
procedures for design control.
If changes'to an approved design are l
required to meet plant requirements or conditions, Field Change Requests Q
g (FCR) may be issued or otherwise documented by a cognizant engineer and g
I transmitted with the changes for review and approval in accordance with l
lPMPcontrolproceduresandapplicableLRG0/plantdepartmentalprocedures.
l l
l3.5.2 l
l l
\\
Changes from specified design inputs, such as design bases, regulatory l
l requirements, codes and standards (including quality standards) are to be i
identified, approved, documented and controlled through PMP control l
l procedures and applicable LRG0/ plant departmental procedures.
I I
I I
I I
I I
I I
I 4
I I
I I
I I
I I
I I
l A
l QA MANUAL OPERATIONS IREV.
9 i
P l
lDATE 7/22/87 I
i l SECTION:
3.0 DESIGN CONTROL IPAGE 3-4 I
I L
l l
l l
l l
l
l l
l 1
l 3.5.3 I
.I l
r-l l
(
l During preparation of a design change, the responsible er.gineering l
l organization is to perform a safety and environmental review per l
l 10CFR50.59 to verify compliance with the Safety Analysis Report and to l
determine if NRC approval of the design change is required.
The I
review is to be documented, reviewed by the PSC and approved by the l
Executive Director AND Site Operations.
l l
I l
3.5.4 1
l Design changes are also to be submitted to the QC Superintendent prior to l
plant implementation to verify the use of appropriate quality codes, l
standards and inspection requirements in the design documents.
I I
l 3.6 CORRECTIVE ACTIONS I
I I
lWhendesignchangesaremadeasaresultofdesigndeficienciesor l
errors, corrective actions (for significant conditions) are to be taken l
linaccordancewithSection16.0,todeterminethecauseandtoinstitute l
l l
appropriate changes in the design process and/or Quality program to l
}
prevent recurrence.
When a significant design change is necessary l
because of an incorrect design, the design process and verification l
lproceduresshallbereviewedandmodifiedasnecessary.
l l
l I
I 3.7 DESIGN RECORDS t
I l
i l
l The plant Administrative Manager is responsible for maintaining permanent l
J lrecordsofthedesign,documentsfortheconstructionandtestingphases.
l In addition, he shall be responsible for maintaining records of the I
upgrading or modification of these documents as described in this j
section.
The controls for maintaining these records are established by l
specific procedures described in Section 17 of this manual.
These I
records provide the historic reference necessary for the safe and l
l reliable operation of the plant.
l 1
(
A i
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l 1 SECTION:
3.0 DESIGN CONTROL-lPAGE 3-5 l
1 L
i l
l l
l l
l
I l
l I
(
l 4.0 PROCUREMENT DOCUMENT CONTROL 1
)
I l
1 4.1 SCOPE I
I it l
-l i
Requirements for the procurement of items and services are to be clearly l
l stated and documented to assure that applicable regulatory requirements, 1
design bases, technical requirements and quality assurance criteria are l
included or referenced in the procurement documents, whether procured by l
8 l
LRGO or plant procurement groups.
Procurement document control I
activities are to be in accordance with LRGO and/or plant procurement l
l procedures and are to meet the provisions set forth in NRC Regulatory l
Guide 1.123, rev. 1 (7/77) unless otherwise noted in Table 1.
I I
i 4.2 PROCUREMENT DOCUMENTS I
l 4.2.1
)
l I
The procurement of materials, parts and components are generated through l
]
l the preparation of a Purchase Requisition (PR) and subsequent issuance of l
i O
l a Purchase Order (PO), or when additional services from the Vendor is l
Q g
y I
required, through the preparation and issuance of a Contract.
The l
I I
procurement of services is initiated through the preparation and issuance g
l of a Contract.
The preparation, review, approval and issuance of these
-l procurement documents is to be in accordance with applicable procurement l
and contract administration procedures.
Purchase Orders for items are I
issued through the AP&L Procurement Section and Contracts for items and/or I
services are issued through the AP&L Contracts Administration Section.
l l
l l
I 1
4.2.2 l
l l
I l
l Procurement documents are to include or reference specific design l
specifications for the items or services to be procured which define l
l specific codes, standards, tests, inspections, environmental l
l l
1 l
l l
l l
p i
l I
l Q
l A
I QA MANUAL OPERATIONS lREV.
9 l
l P
l (DATE 7/22/87 l
l 1 SECTION:
4.0 PROCUREMENT DOCUMENT CONTROL lPAGE 4-1 l
l L
l l
l 1
I I
I l
1 1
l I
I I
l 4.4 CHANGES TO PROCUREMENT DOCUMENTS I
I I
n i
I Q
l. Changes to procurement documents are to have the same degree of control I
and review as imposed on the original documents.
Changes such as I
inconsequential editorial corrections or changes to commercial terms and i
conditions may be made by Procurement or Contract Administration 1
personnel, as appropriate, after concurrence from the originator or i
organization which originated the document.
l l
l l
i I
I I
I I
I i
i I
I I
I I
I I
I I
I i
1 l
l l
1 1
1 I
l l
1 I
I I
I O
l l
1 I
I I
i l
l I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
l l
I o
t l
A 1
QA MANUAL OPERATIONS lREV.
9 l
l p
l lDATE 7/22/87 l
l l SECTION:
4.0 PROCUREMENT DOCUMENT CONTROL IPAGE 4-3 l
l L
l l
I l
l I
I l
l' l
l I
I I
l determine that important activities have been satisfactorily l
l accomplished. Each procedure is to be sufficiently detailed so that a I
l qualified individual may perform the required function (s) without direct l
supervision and is to include measures to document the activity'being l
performed.
l l
l 1
I l
5.2.2 l
j l
l
{
l 1
l To assure the accomplishment of activities in accordance with approved j
instructions, procedures and drawings, each supervisor is responsible for l
quality compliance of his personnel.
Verification that activities are l
I accomplished in accordance with approved instructions, procedures and I
a l
l l
l drawings is obtained through various levels of surveillance and l
inspection by Quality Control personnel and through periodic surveillance l
and audits by QA personnel.
[
l l
\\
l f
\\
l l
5.3 REVIEW 0F INSTRUCTIONS, PROCEDURES AND DRAWINGS l
1 l
l l
l 5.3.1 l
O I
I I
V l
l l
Instructions, procedures and drawings are prepared, reviewed and approved l
l in accordance with applicable LRG0/ plant administrative procedures.
I I
l 5.3.2 I
j l
I l
t i
I Plant procedures identified in the Technical Specifications for each unit I
l l
l and changes thereto which describe activities required to implement this l
quality program are to be reviewed by the PSC prior to submittal of the l
l procedures to the Executive Director AN0 Site Operations for approval l
l I
and subsequent issuance.
Plant Administrative procedures (1000.XX l
j l
l l
Series) l l
l l
l l
l l
l l
l l
l l
1 l
(~}
l l
I I
g l
A I
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
5.0 INSTRUCTIONS, PROCEDURES lPAGE 5-2 l
l L
l AND ORAWINGS I
l l
l 1
l
)
l
I I
I_
l l are also reviewed by NQ0 to verify compliance to AP&L's quality program l
l requirements.
LRGO Generation, Transmission & Engineering (GT&E) procedures describing activities required to implement this quality l program are to be reviewed and approved by a procedures task force l
I committee and NQ0 to assure compliance to AP&L's quality-program l
I I
requirements prior to submittal of the procedures to the Department Head l
i responsible for implementation, for approval and subsequent issuance.
I I
I I
I l
5.3.3 I
I I
i i
i i
Plant and LRGO procedures and instructions are to be reviewed no less I
l I
than every two years to determine if changes are necessary to meet NRC l
l commitments and current AP&L practices.
Applicable procedures (i.e.
l lthosethatrelatetotheincidentcause)aretobereviewedfollowingan I
unusual incident such as an accident, unexpected transient, significant l
l l
l operator error or equipment malfunction.
Applicable procedures are also I
to be reviewed following any modification to a plant system.
I I
I I
l 1
5.3.4 I
O l
l Drawings related to plant changes and modifications are controlled as l
ldescribedinSection3and6ofthismanual.
l l
l5.4 l
\\
CHANGES TO PROCEDURES I
l
)
l5.4.1 l
I l
Changes or revisions to approved instructions, procedures and drawings l
l l
are to be reviewed and approved by the same organizations or groups that l
I I
j l
performed the original review unless otherwise noted in specific AP&L l
l procedures and controlled in the same manner as the original.
I I
I I
I I
I i
i l
l I
I I
i l
A l
QA MANUAL OPERATIONS lREV.
9 I
I P
I IDATE 7/22/87 l
l 1 SECTION:
5.0 INSTRUCTIONS, PROCEDURES lPAGE 5-3 I
I L
l AND DRAWINGS l
l l
l l
l l
l l
i I
l 5.4.2 l
l l
A I
I t]
l Temporary changes (interim approval) to approved plant procedures which l
do not change the intent of the procedure may be made provided such l
l changes are approved by two members of the plant management staff, at l
lleastoneofwhomholdsaseniorreactorsoperatorslicenseontheunit l
affected.
The change is to be documented, reviewed by the PSC, and l-approved by the Executive Director AN0 Site Operations within 14 days I
of implementation.
Temporary changes to approved plant procedures which l
change the intent of the procedure may be made provided such changes are l
l reviewed by the PSC and approved by the Executive Director ANO Site l
l l
Operations prior to implementation.
Temporary changes to approved plant l
procedures are to specify the period of time during which they may be l
l used and made readily available to affected members of the plant staff.
l In the event of an emergency not covered by an approved procedure, l
I, operations personnel may take action, without obtaining approvals, so as l
to minimize personnel injury and damage to the facility and to protect l
lhealthandsafety.
I I
O l
\\
l l
I I
I i
I I
I I
l l
1
)
i I
I l
l 1
1 1
I I
l l
l d
1 I
I I
I I
I l
I I
I I
I I
I I
l l
.i i
l I
I I
l q
l l
I I
Q l
A l
QA MANUAL OPERATIONS lREV.
9
'l l
P l
lDATE 7/22/87 l
l l
l SECTION:
5.0 INSTRUCTIONS, PROCEDURES lPAGE 5-4 l
l L
l AND DRAWINGS l
l l
l 1
I i
I
I 1
'l i
l approved historical plant documents, and the storage of historical l
I drawing records.
The plant Engineering Manager is responsible for the I
control and issuance of drawings and revisions thereto to assure that-l they reflect the as-built conditions of the plant.
l I
l l6.2.4 l
l 1
lTheTechnicalSupportServicesGeneralManagerisresponsiblethrough l
l the Technical Services Manager for the control and issuance of LRGO I
Generation Transmission & Engineering procedures, and revisions thereto, l
l to assure distribution in accordance with departmental procedures.
I I
I l
I l
l 6.3 IDENTIFICATION l
I I
l l
I I
Documents are to be identified by a title descriptive of their purpose or i
applicability and marked or stamped as to their current status (Draft, I
For Information Only, Void, etc.) per departmental procedures.
Revision l
lstatusofdocumentistobeidentifiedindocumentregisters, I
distribution lists and/or within the revision record page/ block of the l
l l
document.
I I
H l6.4 l
DISTRIBUTION l
1 l
lDistributionlistsand/ordocumentregistersaretobemaintainedbythe I
organization responsible for issuance of the document.
These lists are l
l to identify the revision status of the document and are to be reviewed I
and updated periodically by the responsible organization to maintain them i
in a current status.
These lists are available to individuals using the I
document to assure they are in receipt of the current document.
These I
measures are to preclude the possibility of using outdated or I
inappropriate documents.
I I
I I
I I
I I
I I
I I
l 1
I l
A QA MANUAL OPERATIONS REV.
9 l
l P
i lDATE 7/22/87 l
1 l SECTION:
6.0 DOCUMENT CONTROL IPAGE 6-2 l
l L
l l
l l
l l
1 1
i l
l I
I l
(1) Source survey by AP&L to verify compliance to applicable 10CFR50, l
I I
Appendix B requirements or to applicable ASME Section III Quality q
l l
Q l
Assurance program requirements.
(This is not applicable to ASME l
l Procurement unless justified in accordance with the AP&L ASME l
l Section XI Repair and Replacement Program.)
l l
1 I
l l
(2)' Evaluation and acceptance of source surveys performed by others l
(ex. CASE, other utilities, NSSS suppliers, and prime contractors) l l
j l
indicating a program meeting the appropriate requirements of l
(This method is not applicable for ASME l
procurement.)
l I
I l
I l
(3) A review of the vendors / contractors current quality records l
supported by evidence of documented qualitative and quantitative l
information which can be objectively evaluated.
This includes l
review and approval of the vendor's/ contractor's quality assurance l
l program, marval and procedures, when available.
(This method is not l
l applicable for ASME procurement).
l l
l (4) Evaluation of the vendor's/ contractor's history of providing a l
product / service which performs satisfactorily in actual use.
l Evaluation information includes:
experience of users of identical l
or similar products / services of the prospective vendor / contractor; I
and/or procurement records that have been accumulated in connection l
l l
with previous procurement activities and operating experiences.
l j
(This method is not applicable to ASME procurement).
l I
l(5) l Verification that a vendor is a nolder of an ASME Certificate of l
Authorization issued as a result of an ASME survey.
(This method is l
applicable for both ASME and 10CFR50, Appendix B procurement.)
l I
I I
l l
l l
l l
l 1
I I
l l
l A
1 QA MANUAL OPERATIONS IREV.
9 l
l l
P l
lDATE 7/22/87 l
l l SECTION:
- 7. 0 CONTROL OF PURCHASED lPAGE 7-2 l
l L
l MATERIAL, EQUIPMENT AND SERVICES I
l l
l l
1
1 l
l i
I l
performed in accordance with plant procedures for receipt inspection.
I l
I i
7.4.2 l
l l
1 l
Receipt inspection activities are to be documented and include, as a I
minimum:
examination of material or equipment for shipping damage, i
proper identification, and quantity; and the review of vendor I
documentation to verify compliance with the procurement document.
In l
addition, if material and equipment received at the plant were not I
inspected at the vendor's facility by AP&L, an inspection is to be l
l performed by a Quality Control inspector at the point of receiving to l
verify that the material or equipment conform to the inspection l
requirements identified in the procurement documents.
l 1
l l
l l
7.4.3 l
l 1
I I
l Vendors are to furnish documentation as required by the procurement l
documents for objective evidence that the material or equipment conforms j
to the procurement requirements.
Review and acceptance of this l
i ldocumentationistobeperformedbyQualityControlpersonnelpriorto l
l installation or use of such material or equipment and the results l
l documented unless otherwise specified in plant procedures.
l Certificates l
of Conformance may be required by procurement documents which identify l
ltherequirementsmetbythevendor.
The validity of the vendor's l
l certification program is to be periodically verified through scheduled l
f source surveillance and audit activities or through independent testing l
l of the item by AP&L.
l I
l I
l l
7.4.4 l
l l
l l
l Accepted material and equipment is released, identified as to its l
inspection status and forwarded to a controlled. storage area or released i
for installation per applicable plant procedures.
l l
'l l
l 1
1 I
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87' l
l 1 SECTION:
7.0 CONTROL OF PURCHASED lPAGE 7-5 l
l L
l MATERIAL, EQUIPMENT AND SERVICES I
l l
l I
l
l l
l I
l l
l 3)
Identification of any special equipment and tools required to I
perform the inspection (when accuracy requirements for l
l inspections exceed the accuracy of normally available process I
or measuring and test equipment, such additional accuracy l
I requirements are to be specified within those inspection l
i I
procedures);
l l
4)
A step-by-step description of the method of inspection, l
)
l examination, measurement or test to be performed; and l
1 5)
Identification of those inspection results to be documented.
I 1
i l
I Inspection forms or checklists are to be used as an aid in j
]
g I
documenting the inspection activity to assure quality l
l l
g requirements have been met, g
l l
J l10.3.2 l
l l
l Operational inspections are to be performed by qualified individuals l
I other than those who performed or directly supervised the activity being l
)
l inspected.
Construction inspections are to be performed by qualified l
l individuals other than those who performed or directly supervised the I
activity being inspected and do not report directly to the immediate l
l supervisors who are responsible for the activity being inspected.
l l
l l
l
\\
l 10.3.2.1 l
l 1
i l
I l
Operational inspections may be performed by second-line supervisory I
l l
personnel or by other qualified personnel not assigned first-line I
supervisory responsibility for conduct of the work.
.I i
l I
i l
l l
l 10.3.2.2 l
J l
i I
I I
Construction inspections are to be conducted in a manner similar to that I
associated with construction phase activities in accordance with l
l applicable plant and departmental procedures, l
I i
i I
I I
l l
A l
QA MANUAL OPERATIONS IREV.
9 I
I P
l lDATE 7/22/87 l
1 SECTION:
10.0 INSPECTION
[PAGE 10-'3 I
I L
I l
l 1.__
l l
I
i I
j l
l l
'10.4.2 1
1 I
l l
Inspection hold points are inserted in procedures based upon safety significance, complexity of the item or activity, degree of l
standardization of the item or activity, past performance of the item or l
)
activity and the ability to verify quality by jobsite testing.
l I
l 10.4.3 I
I I
I Inspection responsibilities, requirements, information and acceptance I
l i
i criteria for the work activity are to be identified in appropriate, l
approved documents (e.g. procedures, checklists, etc.)
l l
l l10.4.4 l
l l
lForworkinvolvingthemodification, repair,replacementorin-service l
l inspection of ASME Code materials, parts and components, the work l
lpackagesaretobemadeavailabletotheCodeInspectorpriorto l
commencing work for his review and assignment of inspection = hold points.
l l
lThedepartmentresponsiblefortheworkactivityisresponsiblefor l
notifying the Code Inspector when the hold point is reached.
Work is not l
to proceed past a Code Inspector's inspection hold point until signed or l
waived by the Code Inspector.
l l
l l
l l
l l
10.5 DOCUMENTATION l
l l
I I
i l
l 10.5.1 l
1 I
I I
I i
l Inspections and process monitoring activities are to be performed and the results documented in accordance with approved procedures or l
instructions.
Records are to:
provide objective evidence that the l
inspections and monitoring activities were performed in compliance with' l
l l
l I
I I
I l
1 l
A QA MANUAL OPERATIONS lREV.
9 l
l P
I lDATE 7/22/87 l
1 SECTION:
10.0 INSPECTION lPAGE 10-5 l
l L
l
[
l l
1 I
I 1
L
l l
I l
j l procedures, instructions or drawings to verify design requirements; show l
1 I' compliance with acceptance criteria or identify the cause of rejected I
items; and identify the appropriate inspection personnel approving the
]
lresults.
l l
l l
l10.5.2 l
l 1
lRecordsaretobemaintainedinaccordancewithapprovedwritten i procedures and Section 17 of this manual.
Inspection results on ASME l
Code items are available to the Code Inspector for his review.
I l
i l
10.5.3 l
1
-l
]
The results of inspection and monitoring activities are periodically l
l evaluated per approved procedures and the results documented to determine I
whether the individual inspection programs demonstrate that the plant can l
be operated safely and as designed.
I l
l 1
l l
l 10.6 NONCONFORMANCES I
l D I
l l
l l
Nonconforming items found as a result of inspection and monitoring l
lactivitiesareidentified,segregatedanddispositionedinaccordance l
l with approved written procedures and Section 15 of this manual.
- Rework, i
repair or replacement performed after completion of inspections are to I
require reinspection to the extent necessary to determine acceptability l
ltoestablishedcriteria.
l l
l l
1 l
1 I
l l
1 l
l 1
I l
1 I
i l
I I
I I
I I
I I
I A
l QA MANUAL OPERATIONS REV.
9 l
P I
l0 ATE 7/22/87 l
1 SECTION:
10.0 INSPECTION lPAGE 10-6 l
1 L
l l
l l
l I
1
I I
I I
i 11.3.2.2 l
l l
Inservice inspections required to meet the requirements of ASME Boiler landPressureVesselCode,SectionXI,aretobeidentifiedinthe l
In-Service Inspection (ISI) Programs applicable to each unit at the l
l plant.
Engineering Services is to establish and maintain an ISI plan for l
l each unit.
The plan specifies the inspection items, inspection l
procedures, inspection intervals and type of inspections.
Engineering l
l Services is to coordinate the implementation of the ISI plans at I
appropriate scheduled outages.
The plans are also to be made available l
for review by the Code Inspector.
l l
l l
l l
l l
l 11.3.3 l
I I
J l
l I
l Tests following plant modifications, repairs, maintenance, or significant l
changes in operating procedures, are to be conducted to confirm that they l
l are not detrimental to the safe and efficient operation of the plant and l
)
lthatthecomponentsorsystemsdemonstratesatisfactoryperformance.
I I
11.3.4 I
I Requirements for the given test to be performed are to be identified in l
l the test procedures / instructions.
Evidence is to be available to assure l
I the following minimum requirements are met:
I I
l I
I a) test equipment and measuring devices are calibrated in accordance with the requirements of Section 12 of this manual
]
and are functioning properly; i
b) test personnel have been qualified to perform the test in l
accordance with the requirements of Section 2 of this manual; l
l c) appropriate witness and hold point notifications have been l
provided; I
I I
I i
l l
l I
I A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l 1 SECTION-11.0 TEST CONTROL lPAGE 11-3 l
l L
l l
l l
l l
I 1
m I
I I
I l documents and furnished to the plant prior to or upon receipt of the item j
I I
O lattheplant.
l l
13.3 SHIPPING CONTROLS 1
I i
l 13.3.1 l
1 lShippingrequirementsaretobespecifiedintheprocurementdocuments, I
l Suppliers compliance to these requirements'are to include controls to l
lassurethatitemsarecompleteandassembledasrequired;itemshavebeen
- 1. preserved and packaged in accordance with the procurement documents; l
items have been marked and identified in accordance with specifications and procurement documents; items have been loaded for shipment in such a j
manner as to prevent damage; and required documentation is complete and l
furnished in accordance with the procurement documents.
I l
l I
I I
13.3.2 I
I I
l l
l Special nuclear material and sources are to be shipped and stored as I
specified in the AP&L operating license and other appropriate regulatory k
l documents.
The Health Physics Superintendent is responsible for assuring l
that radioactive sources and instruments containing radioactive sources l
l are stored.and handled per these requirements and plant procedures.
The l
lRadwasteSupervisorisresponsibleforassuringthatlowlevelwaste l
l material is stored and shipped per these requirements and plant procedures.
I l
lTheReactorEngineeringSupervisorisresponsibleforassuringthat I
special nuclear material (SNM), as defined in plant procedures, is l
l shipped,storedandhandledpertheserequirementsandplantprocedures.
l l
l 13.4 RECEIVING I
I l
13.4.1 l
l Materials and equipment are to be received at the plant per plant l
l procedures and subjected to a receipt inspection in accordance with I
j l
l
\\
l I
A l
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
13.0 HANDLING, STORAGE AND lPAGE 13-2 l
l L
l SHIPPING l
l l
1 l
l
)
l I
I l'
l for control of radioactive sources, Low Level waste material and SNM) to l
I identify those items currently in storage arid to facilitate inspection i
and maintenance planning.
Issuance of items from storage for-installation or use are to be documented and controlled in accordance l with plant procedures.
I l
1 I
I I
13.5.4 I
I l
l l
l Items identified as requiring maintenance during storage are to be 1
maintained in accordance with a documented maintenance program.
I l
i l13.5.5 l
l l
Storage areas are to be monitored by individuals responsible for the i
storage areas so that the integrity and security of stored items is l
leffectivelymaintained.
Inspections and examinations under the control l
l of the Quality Control Superintendent are to be performed and documented l
lonaperiodicbasistoassurethattheintegrityoftheitemsandtheir I
containers are being maintained.
Periodic audits under the control of l
n()
ltheQualityAssuranceSuperintendentarealsoperformedtoassure l
l compliance to storage requirements.
I l
l l
l l
13.6 HANDLING CONTROLS l
l l
l l
l l
13.6.1 l
l 1
I I
l Special handling requirements are to be specified in the procurement l
documents and plant procedures to protect the quality of items l
susceptible to handling damage.
Special tools and equipment are to be l
provided to handle these items and are to be controlled and maintained I
per written procedure to assure safe and adequate handling.
I I
I I
I I
I l
l l
l l
l l
l
)
A l
QA MANUAL OPERATIONS IREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
13.0 HANDLING, STORAGE AND lPAGE 13-4 l
l L
l SHIPPING l
l 1
1 I
I
i i
f I
I l
-15.2.3 l
I 1
Nonconformance reports are to identify the group responsible for I 'dispositioning the nonconformance.
Thei esigned individual-within the I
j responsible group is to evaluate the nonconformance and confer, as l
l l
appropriate, with interfacing groups to determine a recommended l
disposition.
The disposition for materials, parts, components and as l
l
. applicable, services (including computer codes), which may be reject, l
l rework, repair or use-as-is, and any actions taken/ required to be taken l
lasaresultofthedispositionaretobedocumentedonthereport.
l l
l l15.2.4 I
I lReviewofthedispositionforconcurrenceistobeperformedbythe j
i individual / group identified within LRGO or plant procedures.
If the l
llthedisposition,theExecutiveDirectorANDSiteOperation review group or individual cannot agree with the assigned individual on l
l l
l lplantortheNucNarOperationsVicePresidentatLRGOistodecide.
For I
a repair or use-as-is disposition, a cognizant individual knowledgeable l
l r
l in the design requirements for the affected item is also to review the l
g l
report for concurrence of the disposition.
Written justification for the I
design change, repair or deviation that has been accepted is to be j
documented to denote the as-built condition and is to be made a part of l
the report.
I l
l I
-l 15.2.5 1
l l-The acceptability of rework or repair of materials, parts, components, l
systems and structuren are to be verified by reinspecting the item as l
originally inspected or by a inethod which is at least equal to the I
original inspection method.
The rework and repair inspection records are l
ltobedocumentedandbecomepartofthepermanentrecordsfortheitem.
I i
l l
l l
I I
l l
l A
l QA MANUAL OPERATIONS REV.
9 l
P l
lDATE 7/22/87 I
i l SECTION:
15.0 NONCONFORMING MATERIAL, lPAGE 15-2 I
I L
I PARTS AND COMPONENTS l
l l
l l
1
i i
l l
1 l
l 16.0 CORRECTIVE ACTION l
l l
16.1 SCOPE l
l l
l I
l A corrective actions system is to be established to assure that l
conditions adverse to plant safety, such as failure, malfunctions, i
deficiencies, deviations, defective material and equipment, abnormal l
occurrences and nonconformances are promptly identified and corrected.
I In the case of significant conditions adverse to safety, this system is l
to assure that the cause of the condition is determined and corrective l
action taken is documented and reported to appropriate levels of l
management for independent review.
I I
l16.2 GENERAL l
l I
l16.2.1 I
i lWhendeviations, deficiencies, malfunctions,r,onconformancesorother l
abnormal occurrences or conditions are encountered, they are to be l
O I
I
()
reported to responsible authorities for review and disposition in I
accordance with applicable LRG0/ plant procedures.
l I
l I
l l
16.2.2 l
l I
I l
l Cognizant supervisors are to review discrepancies discovered during the l
lcourseofstationoperationsandtakeappropriateactiontoresolvethe i
discrepancies and evaluate their safety significance.
For conditions l
l adverse to safety, they are to initiate corrective action to prelude l
recurrence.
For significant conditions adverse to safety, they are to l
I initiate action to identify their causes and take necessary corrective l
action to prelude repetition.
l l
1 I
I I
I I
I I
I I
I I
I A
l QA MANUAL OPERATIONS lREV.
9 l
l P
I IDATE 7/22/87 l
l l
SECTION:
16.0 CORRECTIVE ACTION lPAGE 16-1 l
l L
i l
l I
I I
I 4
_____..___..___.___i__
1 j
I i
i I
I
)
l 16.2.3 l-I l-I I
p g
l Evaluation of the corrective action is to be performed by the l
individual / group identified within LRGO or plant procedures to determine l
I l
its adequacy and completeness and to assure the need for additional l
lcorrectiveaction.
If the corrective action is acceptable, follow-up l
action to verify implementation, documentation and close out of the l
corrective action commitments is to be performed per LRGO or plant l
l procedures.
l j
l l
i I
i l
i 16.2.4 l
l l
I l
1 l
If the resolution cannot be agreed upon, it is to be referred to the next l
llevelofmanagementforresolution.
l l
l l
l 16.3 SUPPLIER DEFICIENCIES l
l 1
l When vendors furnish products or services that do not conform to the l
requirements of the applicable purchase contract and, in the opinion of l
)
ltheQualityControlSuperintendent,thevendorwarrantsconsiderationfor l
reappraisal, the Quality Control Superintendent is to submit a vendar I.
reappraisal request to the Quality Assurance Superintendent for l
determination of action to be taken.
Results of the reappraisal, l
1 together with a request for specific corrective actions, are to be l
l transmitted to the vendor.
If the vendor does not improve his quality l
lassurancesystemandproductsasrequested,theQualityAssurance l
Superintendent is to remove the vendor from the Qualified Vendor List l
l(QVL)inaccordancewithdepartmentalprocedures.
I I
I l
I I
I i
l I
I I
I I
I I
I I
I I
I i
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l
SECTION:
16.0 CORRECTIVE ACTION lPAGE 16-2 l
l L
l l
l 1
I I
I
\\
y g
1f, j
j 1
J l
1 16.4 SIGNIFICANCCONDITIONS I-s 1
I l
l l
Significant conditions adverse to safety are to include, as a minimum, I
the following:
l l
l (1) Conditions that have a direct adverse effect on the safety of l
the plant per the plant Operating License and Technical l
l Specifications l
(2) Cond1'tions that have caused the uncontrolled release of l
I I
radioactive materials (liquid, solid, gaseous or air i
//
I 1
l particulate) to the environs l
(3) Adverse quality trends which could lead,to unsafe plant l
l operations i
l l
1 l
l l
i 16.5 REPORTABLE OCC(GRENCES I
l c
j i
.e l
l 16.5.1 l
l t
l l
l s
l Wnen significant conditions adverse to safety are discovered, the l
responsible supervisor and department head are to evaluate the condition l
{
and determine if it is a reportable occurrence.
l i
l I
I j
i 16.5.2 l
l a
I i
.t l
J,'h.
l l
Adverse conditions which are detusined to be reportable per the l
l Technical Specifications to the,1NCad to be documented by the l
j' initiator per plant, procedurbs, reviewed by the responsible supervisor l
f,andforwardedtotile-SpecialProjectsManagdrsotheappropriatereport I
.I.
I can be prepared.
^,
I l
,(
l I
l I
l l
i l
I l
l l
8 1
/
l l
l l
i I
l l
l Q
l 1
."~
l i
V l
A l
QA MANUAL OPERATh0NS lREV.
9 l
l P
I,
'[
1 lDATE 7/22/87 l
(
'i '
'SECTION:
16.O CORRECTIVE l ACTION iPAGE 16-3 l
l l
L l
l l
1 I
I l
/
4
'h
l l
l l
l 16.5.3 l
l l
l Upon disposition of the report by the responsible group, the PSC reviews l
the report for concurrence and possible assignment of additional l
l corrective actions and forwards the report to the Executive Director ANO l
Site Operations for final approval.
]
l l'
l 16.5.4 l'
I l
The LRGO Nuclear Engineering & Licensing section is to be responsible for l
transmitting approved reports to the NRC within the time period specified l
j lintheTechnicalSpecificationsandLicensingprocedures.
l l
16.6 VERIFICATION-I I
Verification by surveillance or audit of the effective implementation of l
corrective actions is to be periodically performed and documented by l
lQualityAssurancepersonnel.
Audits are to be performed in accordance l with Section 18 of this manual.
l I
I L
I l
1 I
I I
I I
I l
i I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
A I
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l 1
SECTION:
16.0 CORRECTIVE ACTION lPAGE 16 l l
L l
l l
l l
l 1
l l
l l
l with Section 17 of this manual.
l l
l 18.6 NUCLEAR FUEL AUDITS I
l I
I l Arkansas Power & Light Company delegates to System Services Inc. (SSI)
I I
a wholly owned subsidiary of Middle South Utilities, Inc., the I
responsibility for performing those quality assurance functions necessary I
l to assure that its nuclear fuel is desigr.
and fabricated in accordance l with regulatory. requirements and accepted codes, standards and l
i l
specifications.
The SSI Quality Assurance section monitors the design I
and fabrication of the fuel through a program of audits of the fuel i
fabricator, including both design review audits and fuel fabrication l
l audits.
SSI also conducts audits of component suppliers as deemed l
lnecessarybytheManager,QualtiyAssurance(551),toensurethe-quality l
l of the fuel.
Formal audit reports are issued by SSI to document their l
audit activities and to identify nonconformances or other items requiring l
l action by the fuel fabricator.
Resolution of nonconformances or other l
items requiring action is verified by SSI and documented in follow-up l
I reports.
The AP&L Quality Assurance Superintendent is on distribution l
for all audit and follow-up reports.
These audit reports are to be l
l fowarded to the plant and stored in accordance with Section 17 of this l
l manual.
I I
I I
I I
i i
l l
I I
l l
1 1
I I
l l
l l
l l
l l
l 1
l l
l l
l l
l l
I I
I l
l A
l QA MANUAL OPERATIONS IREV.
9 l
P l
10 ATE 7/22/87 l
l l SECTION:
18.0 AUDITS lPAGE 18-6 l
l L
I l
l l
l l
l
O
,N, G S
NON T
AO N DSR E
ECE I
D ET I
I)
AIMEVE LA R SB
.S CR d
E NGRE U
E E
N O
R EANSR NP P
P O
GRE C N T
O TI H T G A G
Z I
T N
I F
R LI N
ER EE N
&A H
INI S C
V E CI G R R G F
N P DF E
NO ER A
WO E
RE S R P
A O S
P N R A O K
C R
~
E A
D E C
I FN VI T
I AT
- ES V E N
A R VE E H L I
VCA R E NICE E
TC l TI D
lSCSI 5AVI CI l
l
.I F
S U ENI F DRRV C RAI O ATE N
E R
E PNM SS X
I D
P E
F
. A O
sT om$3 o*
_,2.
m Sm o~s
_ 2em M 8m om3m O95%dO*
Rm p
l
1 I
I l
l l
l l
l lO l
~ l 1
l l
1 I
PRESIDENT AND CHIEF l
l l
EXECUTIVE OFFICER j
i l
l I
l l
l EXECUTIVE VICE l
l PRESIDENT CHIEF l
l FINANCIAL APO l
ADMINISTRATIVE OFFICER g
g I
l l
l l
l l
1 ADMINISTRATIVE I
SERVICES l
VICE PRESIDENT l
I l
1
{
l I
i l
l I
CORPORATE RE ES CORPORATE 3
1 SERVICES EXECUTlVE SECURITY l
EdsCT$E C"'
IRECTOR E NAGER l
i l
I N##
TR AINING l
AigaM^u'T*
MANAGER u
I 5"J"#R i
i i
l i
l I
l l
PROCUREMENT MANAGER MANAGER g
l l
l l
l l
l ARKANSAS POWER & LIGHT CO.
l I
CORPORATE SERVICES l
I I
I I
l l
G I
I I
I Q
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l I
FIGURE 2:
AP&L CORPORATE SERVICES lPAGE F-2 l
1 L
l l
l l
l l
1
O AT EI LL CA UU NO M R
S
~
Tl IN NT O
T
~
OS GT L i T
Il NA H
T N
S A
NI A
l 3
N EI ND SE Y%O C
E C P
I I
t S
I P
P O
S I
R A
.C bR P
S R E
RM EE P
AP AAG E
C OI E
ER V
O l
L A GN C
l NRM UOA P
S R
R R
pSO O
N 8O E
O S
TT I
SI CI CA S
CV IV EN S
T N
VR V R JI I
E E
RE M
EP SGD PO NNI SU SU O
S S
AIRE S
C RER I
A
_TEP I
EC LV RSR l
NIE CR N AEE N
EC I
NS M IG OGC UEf l
LVA IN V CRN T E UEA A
R R.
NSM E
S R
O GR E
N R
E NO gE O
I hA I
G N
S RS I
EI NR V
V E
R IE k
GP R
E P
G ES U
NU S
R S
R SR E
G A
l E
L A
C N
U A
S N DM N
O y
I TY A
I A
T L
C A
I U
NU O
M R
T M SA N
T O RE G
NG R
NNG C EL E
N OS OOINR I D TC N
O'n PgE ITRO C AN
/
R I
E TU IR f'
RI S
T S
UET A M AE G
S E E REI UI N ",
S A
IBEC F
G I
ER l
RNE R NN
.R N
MIIR OI NI P EI1 NG HgA STGI E
NS T SR ND N C C
RDE I
EC V
T T
E CN T
CO
~
I AC S
O s oMxM8*
52' eE 5b' 2C@~ w yo F e x%sO H
- . 5bA T"
a
)
R c
QS m" 2C 89z j Z
~
)
~
ER CO Y
USP (L OSU TN EE AS YCD TNN AE I
L A RT UN U
I O
IIIIIIlIIIj U
CO 9ll S
Y TNS )
T IAIO
~
LR VRN
~
AU H
EA US
(
QSPU G
.N, N
T YR L
T I
TE E
N I G GD
- S E L
NO OINI R
A N D A
S AI IOI U N ISI RE A
S A
)
R TSER ETE Q
E M
NRC RMEP LAR R
. LOON E
N C RP A A TOISA L
Y ESI E U E NNGC N PE E R IRTIN W
EANI V OC L
LTCV E
E GRE.
VI U
UOPE C N ANER T T
R E
I O
N G Q SPN S
CNUA
- ISM P
(
S A
T
)
S N
S E
NRN Y LD LOOI N
O T ON Y OIST S
I RE IRTIA A
T E
L TT LTCV REN C
V ANN ANERI K
I OTO U OI UOPEF R
TTII O CE l
R SPO OCNUO UC
- , ~
P ST IS A
U M
A CEO R S
(
ERNE XI AP S
D E
N O
O Y
I T
T ll N
A GR C
A Y
I LIO N
U TORS REI U
Q I
V LTE M
il R
ANHR M
S UOlGP A
E O
R O
E E
CNU C
L T
/
U C
A N A
M G F
NN R
OI E
N T
SR N
I SE EC E
CN T
I CO S
AC e
e e
y o> IE5' OyM oZ
- Q-T
_o$m n
p 2e$ I DP zC m$ sr4
_ mgm r
Og6$ e
O R
E L
TL NO AR T
N O
C S
TC R
KR GO E
N O G TIS R A NSIV P
ANR N
LA LE E
PC AM IP I
LU C
S P
E R
S T
E G R N
A O MU SO P
A P R
S T
L T S CI S
AT N V N
O NL P
E P PU I T RP TN S
AE E
G S
REN V
RD IOTO EI TTI I S
ST P E I
UC A
O R
CEO R
R P ERN E
XI AP O
AE D
E R S GR EC O
E N N
LI GO I O I
RS CV A T D
I EV U
N A L
ER E
_N A R IN E ME FI L P GP AO N U
~
S E
R T E N N A E L GP N
IO T
T N
A GE I
C R T ND I E CR N FG E
DA KE I
T E
ON ON N I
MA R I R M
P G E N
- N T
P R
E U TLO A
S COS L
RI P
ETV ONR E
T RO P NN PCU IOE S
TD N
ME T
T Sl N
O C
O
~
~
9ggh %9MgM
_NN e
_. SM ya y
~
~
- w$= m" g $M EEE 3M y g
~
oA$d$ a'9$gdE
-r
~
l
(V T
T T
T EN N
EN N
E E
L E
E CE C
ACE L C AE CND AND D
ND N R N
C N N
TAN a
N G I
AEN TEN
& N H
EA T
RN N
g T
T IE T
TN HTI CT I I R TI g
NA CNR ENR I
IAE P
A AP E A P P
M MU M
MU MU U
S E
S S
S R L
NAO ICI O S TNIV AHR RCE EEUP T
P T N
O S SE ND ON N
R 2IE O
O TT T
T INRI OI AN C T C S RS UER EN PE EEN GO OP A
RTO AI U
R TZ N T S
O II DST A
I S
A TI H N I
R FV M
IR EOA E
LP H
G A R
E VN AO S P E
R U
I I
TA T
LG P
E N S
~C N
U O E A S
L N R
& R C
(
E I G O
T X
R A A E
R N E S E A PM WN O
S R OIO L
N A O II V OCIS TN P T AH R A
RCE S R P
EE U T
PT N
C S A E SE ND 1ON S P IE N O TT T
NIAN A
RI LR U
R N N S
O R N O A C M T l A A S
FY K R L
~
t R H
R E P
S E T
O P
N U
WE S
C p)(_
o# 5E? Om$dozm
- Q-o o%m_
o lD l
g 28m 9
%? @>$ gmm ydOW m3m Oo$p> doz r
l
m C G e
A
~~
N C A3M T
N ER TO E
E ST NIY V
L A
L WR YN HA T
EHI E
N HPR CN D
E P
E E
A A U YD P
T TN U
RS I
R O
G T
NR IE C
R R
A P M
N ST U
T M
E E
A GR G
G N
S N
N R STE L
VOR A
NO I
ISO NND N
INE R
ORI A
OEN T
AP L
EIV U
N P CER AE NVR ASN C O E
AN LN" IRE REI E
PI G
EIGP G
GEP ES R E
R NU N
NSU PS E
.,V X
E S OA P ES E
U E
S GR N E IG INA A N
~
RA TM E
E V
T NGO NGO NGO TI R
R R S R S
R R
GO O O C
I ONS O
S A
TTNI ANS NS P S IINVI 2INIV NNIVI RII V
TNV AIR IAIR EIR SIR R
E ERP UERP ITU MIT NRP NR P H P PTU PTU U
C U
O S A
S O
S S
M D S E
A T
NA I M R
T T
M O
TN N
D R
A SO T
SNE E
D R
EES A
LE TD N
E CCI RN I
E TRN AM IIV l I RET UOE FVR ED EGN PPT FRE TAI MPN OEP R
ANR OUIR SU O
MA C E E
S S
P P
O MU U
C S
S
'v
- > 3 S um$4 O$
g 5
o
_ S4 m' y e
'so y.
>A o{zH E-uO$
_ 3om
,e" Ooy N> doz r
E
d m
g
^
m a w m,
5Ey x x z =
" O3 mO g x x y, j j j
a
?g.
4" 0d a
j *
"
- 5i3 n
hTe
,{.
. y5 m$?
b% y ;F m
" JS g a
hT e]Jf #,y0X" n
5*
- 5jre]~ 3 h 7 e; 2"h G 7~ "
=
a a
a m
x a
s
=
b3;;5 E$
x x m
m l;: g8 ' * ]E _5" x x x x f e#{ - yM" #! 3 m a x U;7" y;F a
a x
n m
38g h 4" 9 u
PM P
88 yt9 bc1e dl y efl der t
era t
c e
a ro T
ety A
p b
M ud sel 5
sa E
eiu R
b vn U
ea D
rrP E
e C
hrn R
i 2
O itoo E
P e)t L
sa B
E l ec A
C lii T
N arf A
hei 9
ssd U
o 5
- XM 5
L A
mN. t O
q a0n R
Y 0a T
L T
h0l L
N O
l t6P t
O R
l i(
n C
T A
w e a
N m
S N
W O
U sh T
O l
C Q
det E
er Y
N I
k uf T
t E
5 W
D rdo I
Y M
I E
N N
L U
V R
S O
A ae I
M O
K D
R II N
mcs y
C E
D ot B
epc I
t t
NN 5
N LC[
f r A sr D.
TU A
D E {lA I
S~
N A
S NC O
S u
r N
u T
T ul e O
NT o EA II M
O5 JE D e R m
N3R !Tl O r P T
Ai r ir A P
DCT R
EE NV A
x R
5 M
dor F
eri 5
E R
N ct u E
t EI N
L onq R
n M tT O
T IV CER O
O O Q NC C w E roe A
lIC C
UU AT(
R R
N r
D r Pcr D
An R R
E NR EPI Rd N
CDOMA e
r n N 0
TA QR FI7 F
T E
RM i
N R
G D
R R
EqN N
O NR COO u
A A
I R
N A
O M7N T
AAN CC MN EU%
r O M
D P
OM U
T RV0 IEIR ICAG N
RTQ /
T E
A GG IG RCh N
NNFI P
CfN GtlLLORTClED E
l 5 D A NITE i F r I A
TOT NIR T
E M DV K N T
O N
CU D
LAIAARI I
i NCCE A TR M
ZIu NN I AFO C
ts T a S lT L
T l!N Et A
II E T u t n I j
Om IIDA lO O1fOOIACI AT F M M U7 GItE E5E iC R 7iRRTFI r lMW E
AE AT MI I n Q U
N1 l
IIR5 GlPs E
NCAA o
MIT l
PEETTREWT RDRRUR LV C
A A D-NC TG L
F ARF F
0N FCITFFA r E IA7A9IfT ADMO EIAFfDBE kN NA D R
F fU^UOO A
O-R REVE E N r NDC TGl l
ITb PR I-tT T-O$
t UU ODIf M t A e
- U (f
ARd MTRFl LLECUUUFCR NT t.L t
P T
UA i E lU w
HL LRI S
OATEWC6 L
u r
I5IT U NNOURADDDREIEFRR0O I
iT G!Rr A LT W GCRRURIfEIl' MTOOR R
I RFATEEE0REru M
R UTMN H
T I1tICTCCCUWLUEDDTT V
N tiETR { 0 IP Ttf TRD C
ANO DA IIN S3 9LQ El@ORNONDU5AACCtN NNN R
GA T
R SGOL DOCCPCF FFDDDDI V
VCC S
CHDNDCRQIM 0PN INTIIU OER'1 RR OOtEEOO O0TMEUEA N
U t
e P S
C E
PS 6
1 27 39 4477a 7
95l 1
5 3
02 4
6 1.} 0 03
- 2. D.
}2D c.
1
?
H0 1
Ir331i000611l0M3 E:
2 6
. Jl.
00 C
1 2
37 01o O o051o
. M5 6CD5 ai0 6
.0120 t
0 E0 0
t 0
30 55 02 000 6#D6 n0 Z.tU6 00
?0 3
30 0
T0 0
1-000 1T 11 g40 P _PT T Pp10 1
O6
- 0 0
5350D D
60 E
E-Ei EEE -
-r-I1 P
IF
- 100 1PPP P
T T
I LAJ L1 OO7-1 AA -
O rQEQ-MP Q
IcF Ttp7 TfP9tT TF T0 AAP P
P P P1 F
r c P
P iAP T A P9p N_ - S_ M G
OOFF P
7 F GGf*7 G7,F
~ -
~
P~G~6G7*7 P7 gF7 JP AT fp
- *~
+
~
~
l
~
h 2'>ZC $ oTAhyMO2W 3
T S4m NNNC D
p mmOH"$-
Hhgm N 3om NeH r
F',!l
j l
l l
I i
s l
TABLE 3 l
1 I
l QUALITY PROGRAM POLICIES, PROCEDURES AND INSTRUCTION I
I MANUALS LIST l
1 I
I I
l 1.
Quality Assurance Manual Operations l
l l
)
1 I
l The Quality Assurance Manual Operations establishes the policies and 1
l guidelines of the AP&L quality assurance program for its operating l
l nuclear plant.
This program is to be followed by all organizations I
t involved in safety-related work applicable to the operating nuclear I
plant.
l l
l j
l 1
I l
I 2.
Generation, Transmission & Engineering Procedures Manual, I
l I
I I
I l
l Little Rock General Office (LRG0) employs a system r. procedures l
designated as Generation, Transmission & Engineering Procedures l
l (GT&E) in order to implement Program requirements for the control of l
I design, engineering, nuclear fuel, licensing,' training and l
procurement activities in support of the operating plant.
l i
O' l
l l
1 l
The GT&E's and revision thereto are prepared by LRGO personnel, l
l reviewed and approved by the Nuclear Quality General Manager, the l
l LRGO Procedures Task Force and the responsible department head.
l l
1 I
I l
3.
Nuclear Quality Administrative Procedures I
o l
l l
l 1
l The Nuclear Quality Organization employs a system of procedures l
l developed to assure proper implementation of this quality program, i
These procedures provide technical and administrative instructions I
I to the Nuclear Quality staff to aid in implementing their I
responsibilities within the quality program.
These procedures are l
l reviewed / approved by the applicable QA or QC Superintendent and the I
Nuclear Quality General Manager.
1 I
I l
l l
l 1
1
]L l
l 1
l l'
A l
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l 1 SECTION:
TABLE 3 lPAGE T3-1 l
l L
I l
l l
l l
l
1 I
l l
l 4.
Overall Plant Administrative' Procedures Manual l
l l
l 1
I (G) 1 The plant operation organization employs a system of procedures l
designated as Overall Plant Administrative Procedures.
These l
procedures implement Quality Assurance Program requirements and I
1 control on site activities.
Overall Plant Administrative Procedures I
and changes thereto are prepared by the plant staff, reviewed by the l
q Plant Safety Committee and approved by the Executive Director ANO Site l
Operations.
The procedures and revisions are also reviewed l
by the Quality Control' Superintendent to assure that Quality l
Assurance Program commitments are met.
l l
l l
l 1
l 5.
Departmental Plant Administrative Procedures l
-l l
l l
I l
Each department (operations, maintenance, engineering and technical I
support, training, etc.) at the plant has developed procedures in I
support of the Overall Plant Administrative Procedures and this l
l Quality Assurance Program.
These procedures provide technical and l
l 1
I administrative instructions to the various departments to aid in l
implementing their responsibilities within the quality program.
l Each department head is responsible to perform a review of their l
I procedures to assure conformance with the Quality Assurance Program.
l l
These procedures are reviewed by the Plant Safety Committee and l
l approved by the Executive Director AND Site Operations.
Plant l
Modification Process procedures (6000.XX Series) which stipulate i
I activities for LRGO Generation Engineering are also reviewed and g
I approved by the Generation Engineering General Manager.
l I
I I
I I
I I
I I
I I
I I
l l
\\
l l
1 I
I l
l l
I l
I l
\\
l l
l l
l A
i QA MANUAL OPERATIONS IREV.
9 l
I P
l lDATE 7/22/87 l
l l
SECTION:
TABLE 3 lPAGE T3-2 l
l L
I l
l 1
I i
l
i I
l l
l l
ATTACHMENT A l
O l
l J
The following section of the mcst currently approved revision of the QA l
Manual Operations will be applied as stated below (Note specific l
lll paragraphs are to rev. 9 paragraph numbers which could change during l
l subsequent revisions).
l 1
l l
Section 1 - Applicable l
I l
I I
l Section 2 - Applicable l
I I
l l
l Section 3 - Not applicable..AP&L will use only licensed packaging l
l which has been designed under a QA program which has been l
submitted to the NRC for approval.
l l
I l
1 l
Section 4 - Applicable l
l 1
i l
I l
Section 5 - Applicable l.
I i
l l
I l
Section 6 - Applicable l
l l
l Section 7 - Applicable l
l l
l l
l Section 8 - Generally applicable, except for paragraph 8.2.2 and 8,2.3.
l l
Due to size, uniqueness, low volume, and the method of-l supplier identification of each package, AP&L tagging of l
l each package is not necessary.
l 1
i I
Section 9 - Not applicable; we do not consider this subject as a i
"Special Process" in the context of 10 CFR 71, Appendix H l
Section 71.119 which is a restatement of 10 CFR 50, I
l Appendix B Criterion 9.
l 1
l l
l l
1 l
l I
I l
1 I
I l
A l
QA MANUAL OPERATIONS lREV.
9 l
P l
lDATE 7/22/87 l
1 SECTION:
APPENDIX A - QUALITY PROGRAM IPAGE AA-2 l
l L
1 TRANSPORT PACKAGES l
l-l I
I l
1 I
I I
I Section 10 - Applicable l
I 1
Section 11 - Not applicable; AP&L will not be testing the package in the context of 10 CFR 71, Appendix H, Section 71.123 which is a i
restatement of 10 CFR 50, Appendix B Criterion 11.
l l
l I
I l
Section 12 - Generally applicable except for paragraph 12.3.4.
This I
paragraph only applies to Health Physics measuring and l
l testing eauipment that is used to calibrate other devices l
]
(used as a standard).
Health Physics survey equipment are l
l response checked prior to each use.
l l
l
)
l I
1 1
Section 13 - Generally applicable except for paragraph 13.5.
AP&L does l
1 I
not " store" package, therefore the storage section does not I
apply.
I I
I l
i I
l Section 14 - Not applicable; see Section 11 comments above.
l l
l l
1 l
Section 15 - Generally applicable, except for references to the various I
types of dispositions in paragraphs 15.2.3 to 15.2.5.
-l d
I l
Nonconforming material or equipment will be returned to the l
l vendor or will be replaced.
I I
l Section 16 - Applicable 1
l lSection17-Applicable l
I I
lSection18-Applicable l
I I
I I
I I
I I
i l
l I
I I
I I
I I
I I
I
^/'
I I
l l
l A
I QA MANUAL OPERATIONS IREV.
9 I
I P
l IDATE 7/22/87 l
1 SECTION:
APPENDIX A - QUALITY PROGRAM lPAGE AA-3.
l I
L I
TRANSPORT PACKAGES l
l l
l l
l
l l
l l
l l
1.6 The above requirements are implemented by controlling l
I I
activities as described in this manual and appendix and by procedures referenced in this manual and appendix.
l l
l I
l l
l2.0 ORGANIZATION l
l 1
2.1 The organizational structure and responsibilities of key l
personnel associated with the administration, implementation l
l and evaluation of the fire protection program are described in l
l l
Section 1.0 of this manual and as follows:
l l
l I
I
{
l 1.
The Nuclear Operations Vice President is the offsite l
I l
managemenc position which has the responsibility for the j
l l
development, implementation, ani assessment of the l
l effectiveness of the fire protection program.
He reports l
directly to the Generation, Transmission, Engineering l
l l
Senior Vice President.
l 1
i l
2.
Reporting to the Nuclear Operations Vice President is the l
l Nuclear Services General Manager.
Under his direction is l
the Nuclear Programs Manager, who has responsibility for l
I l
development and implementation of the fire protection I
program.
Under his direction is the Nuclear Operations l
l l
Fire Protection Specialist whose responsibilities include:
l providing guidance and technical support to the nuclear l
plant in the area of fire protection; assuring that l
l applicable regulatory requirements are included in the i
fire protection program, AP&L commitments regarding fire l
protection are identified and tracked; safety evaluations l
l (10 CFR 50.59) and design reviews for fire protection l
l modifications are performed and evaluations / assessments of I
the fire protection program are performed and reported to l
AP&L Management.
The Nuclear Operations Fire Protection l
l Specialist also has responsibility for maintenance and l
l revision of the Fire Protection Program Manual.
1 I
I I
I
'O I
I I
I V
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
APPENDIX B - QUALITY PROGRAM IPAGE AB-3 l
l L
l FOR FIRE PROTECTION l
l l
l l
l
l l
l l
l 3.
The Executive Director AND Site Operations is the l
I I
on-site manager responsible for the overall administration and implementation of plant operations in accordance with I
He reports directly to the
]
l Nuclear Operations Vice President.
I I
l l
l l
4.
The plant Engineering Manager is responsible for the l
l establishment and monitoring of fire prevention aspects of l
the program at the plant including control of l
l l
combustibles, ignition sources, and postings.
He is also l
responsible for the fire protection aspects of the program l
l at the plant, such as evaluation of fire detection and I
suppression equipment, fire barriers, and alternate
[
shutdown equipment protection.
He reports directly to the l
l General Manager Plant Support.
Reporting to the plant l
l Engineering Manager is the Engineering Services l
l Supervisor.
Under his direction are the plant Safety and l
)
Fire Prevention Coordinators and the plant Fire Protection I
eg i
Specialist.
The Safety and Fire Prevention Coordinators l
l are responsible for implementing, maintaining and l
assessing th,e fire prevention aspects of the program as l
defined in plant procedures.
The plant Fire Protection l
l Specialist is responsible for providing support and l
technical assistance to Engineering design and review I
activities, performing fire protection evaluations, I
developing inspection and surveillance criteria, and l
coordinating ANI Fire protection inspections at the plant.
l The plant Fire Protection Specialist also monitors the i
fire protection program at the plant and provides input l
I for maintenance of the Fire Protection Program Manual.
I I
I I
l l
l l
\\
l l
I I
I l
1 l
1 l
l
(
l l
l l
?
\\
l A
l QA MANUAL OPERATIONS lREV.
_9 l
l l
P l
lDATE 7/22/87 l
l 1 SECTION:
APPENDIX B - QUALITY PROGRAM lPAGE AB-4 l
l L
l FOR FIRE PROTECTION l
l l
l l
l
I I
l 1
l 5.
The Nuclear Quality General Manager is responsible for i
l assuring that the fire protection program is implemented l
g l
in accordance with the QA Manual Operations, plant I
Technical Specifications, and applicable procedures.
This I
is accomplished by the performance of audits and other 1
provisions of the QA Manual Operations.
He shall assure i
that corrective action, when necessary, is taken.
He i
reports directly to the Nuclear Operations Vice President.
l l
l 6.
The Nuclear Engineering & Licensing Manager is responsible l
l for providing other responsible organizations with l
l regulatory information and interpretations on regulatory l
l issues related to fire protection.
He is also responsible I
for providing interface with the NRC on fire protection l
matters, Engineering evaluations and analysis of fire l
protection systems, as related to regulatory commitments l
l and control of license-based documents relating to fire I
protection.
He reports directly to the Nuclear Services l
i General Manager.
l l
t l
I l
I I
l 7.
The Generation Engineering General Manager is responsible l
I, for assuring that the technical requirements specified in i
the plant Operating License, Technical Specifications, and I
other design basis documents, with respect to fire I
protection, have been satisfied in design modifications.
l l
and design documents affecting the nuclear plant.
He I
reports directly to the Engineering Vice President.
I I
I l
I l
- 3. 0 QUALITY ASSURANCE PROGRAM l
l l
i I
l 3.1 This quality program is to ensure that the fire protection I
systems for safety-related areas (as defined in paragraph 1.2 l
l of this Appendix) are controlled in accordance with applicable l
NRC regulations, industrial standards and codes and AP&L I
I I
I O/
I I
I I
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l 1 SECTION:
APPENDIX B - QUALITY PROGRAM lPAGE AB-5 l
l L
l FOR FIRE PROTECTION l
l 1
l l
1 a
l I
I I
I l
l policies, rules, procedures and licensing documents.
The l
quality program is implemented through appropriate LRGO and
(/
l plant procedures.
The effectiveness of the fire protection l
program is verified through surveillance and scheduled audits l
conducted by the QA organization, under the cognizance of the l
j I
SRC.
General requirements for this program are also described I
l l
l in subsections 2.4 through 2.7 of this manual, except that l
personnel performing inspections need not be certified to ANSI l
N45.2.6, when inspections are performed on equipment not listed j
I I
on the Q-list.
i l
l I
I 3.2 Employees whose duties and responsibilities are related to this l
fire protection program at or in support of the nuclear plant l
j are to participate in appropriate training programs to assure l
that suitable proficiency is achieved and maintained in the' l
I l
I work they are performing.
l l
1 I
I l
l 3.3 Fire protection training for plant personnel is included as I
l l
1 I
)
l l
part of industrial safety in the General Employee Training l
j
(
I Program.
Personnel are periodically retrained in industrial I
l I
l l
safety in accordance with plant procedures.
Personnel assigned l
I to the plant Fire Brigade are to receive additional I
I i
l indoctrination and training to assure their capability to fight l
l I
fires is established and maintained.
The Safety and Fire I
l I
l l
l Prevention Coordinators have the overall responsibility for l
these training programs.
.j l
l l
l l
4.0 DESIGN CONTROL I
I I
l i
I I
4.1 Section 3.0 of this manual is applicav'e for design control l
l l
l activities pertaining to the fire protectica system.
l l
1 l
l l
l l
l l
1 I
l l
l i
O)
I I
I l
l
(,
l A
l QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/8/
I l
I SECTION:
APPENDIX B - QUALITY PROGRAM IPAGE AB-6 l
l L
i FOR FIRE PROTECTION l
l l
l l
l
I I
I I
l 5.0 PROCUREMENT DOCUMENT CONTROL l
l l
5.1 The control of procurement documents for fire protection l
related materials, parts and components is described in Section l
4.0 of this manual with the exception of paragraph 4.2.3, when I
j l-these items are not associated with the Q-list.
The l
procurement document is to include the requirement that items l
l be U.L. listed or F.M. approved for fire protection use, where l
)
l applicable, in accordance with LRGO and plant procedures.
I 1
l l
)
l l
l 6.0 INSTRUCTIONS, PROCEDURES AND DRAWINGS l
l 1
1 I
l 6.1 Inspections, tests, administrative controls, fire drills and l
training that govern the fire protection program are prescribed I
by documented instructions, procedures and drawings and are l
)
accomplished in accordance with these documents.
A listing and l
brief description of procedures relating to fire protection l
l activities is provided in the AP&L Fire Protection Program l
Manual.
Instructions, procedures and drawings are prepared, l
Ox reviewed, approved and revised in accordance with applicable l
l LRGO and plant procedures.
l l
I I
I l
7.0 DOCUMENT CONTROL l
l I
l l
l 7.1 Section 6.0 of this manual is applicable for the control of l
quality program documents related to fire protection.
I l
8.0 CONTROL OF PURCHASED MATERIAL, EQUIPMENT AND SERVICES l
l l
The control of purchased fire protection related materials, l
l equipment and services is described in Section 7.0 of this manual, l
l with the following exception related to subsections 7.2, 7.3 and I
l 7.5.
For the procurement of fire protection related items or l
l services not associated with the Q-list, the vendor / contractor l
l l
l l
O I
I l
l
' h l
A I
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
APPENDIX B - QUALITY PROGRAM lPAGE AB-7 l
l L
1 FOR FIRE PROTECTION l
l l
l l
l
l l
l I
l qualification criteria (including periodic reassessment of their I
I program), is not required.
Nonconformances dispositioned repair or l
use-as-is by the vendor are to be submitted to and accepted by AP&L l
only when so designated on the procurement document.
I l
l l8.0 CONTROL OF PURCHASED MATERIAL, EQUIPMENT AND SERVICES l
l l
The control of purchased fire protection related materials, I
equipment and services is described in Section 7.0 of this manual, l
with the following exception related to subsections 7.2, 7.3 and l
7.5.
For the procurement of fire protection related items or l
l services not associated with the Q-list, the vendor / contractor i
l qualification criteria (including periodic reassessment of their l
program), is not required.
Nonconformances dispositioned repair or l
)
l use-as-is by the vendor are to be submitted to and accepted by AP&L l
l only when so designated on the procurement document.
l l
l l
l l
9.0 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS AND COMPONENTS l
l l
9.1 Section 8.0 of this manual is not applicable for the identification and control of materials, parts and components l
)
l related to the fire protection system.
No particular I
requirements for this Section have been identified in BTP-APCSB l
l 9.5-1, Rev. 2.
The identification and control of materials, I
parts and components are conducted in accordance with existing l
l procurement and materials management procedures and practices.
l l
l 1
I l
10.0 CONTROL OF SPECIAL PROCESSES
(
l l
l l
10.1 Section 9.0 of this manual is not applicable for the control of l
special processes, as applicable to fire protection systems.
I No particular special process controls have been identified by l
BTP-APCSB 9.5-1 Rev. 2.
The control of special processes for l
the maintenance of the fire protection system are performed in l
l accordance with applicable plant procedures and practices.
l I
I l
l l
A l
QA MANUAL OPERATIONS lREV.
9 l
l P
l lDATE 7/22/87 l
l l SECTION:
APPENDIX B - QUALITY PROGRAM lPAGE AB-8 l
l L
I FOR FIRE PROTECTION l
l l
l l
l
I I
I I
i 11.0 INSPECTION l
l I
h l
l V
l 11.1 Inspection activities applicable to the fire protection system i
are described in Section 10.0 of this manual with the exception l
l of paragraphs 10.2.2 and 10.3.2.3, when inspections are l
' he l
l performed on equipment not associated with the Q-list.
T I
4 I
Regulatory Guides referenced in paragraph 10.2.2 are not l
l applicable to the fire protection system.
Individuals outside l
the QA and QC organizations who perform inspections only need l
to meet paragraphs 10.3.2 and 10.3.2.1.
l l
l 1
l In addition to the provisions of this manual, inspections and I
surveillance are provided for in applicable portions of the l
)
Fire Protection Program Manual and the Technical Specifications l
l for each nuclear unit.
l l
l 1
i l
l l
l 12.0 TEST CONTROL l
l 1
I l
l l
I 12.1 A test program is to be established and implemented to ensure l
f3 l
that testing is performed and verified on applicable systems l
l and components to demonstrate'conformance with design and l
l I
system readiness requirements.
The tests are to be performed g
l in accordance with written test procedures and test results l
l evaluated for conformance to the test objectives.
l l
l 12.2 The control of testing activities is described in Section 11.0 l
l 1
of this manual.
Surveillance testing requirements are l
l l
identified in the Technical Specifications for each nuclear i
unit.
l I
l 1
l l
l 13.0 CONTROL OF MEASURING AND TEST EQUIPMENT l
1 l
I l
l 13.1 Section 12.0 of this manual is not applicable for the control l
of measuring and test equipment.
No particular measuring and l
l 1
l l
A l
QA MANUAL OPERATIONS REV.
9' l
P l
lDATE 7/22/87 l
l 1 SECTION:
APPENDIX B - QUALITY PROGRAM lPAGE AB-9 l
l L
l FOR FIRE PROTECTION l
l l
l I
I
I l
l l
l test equipment controls have been identified in BTP-APCSB9.5-1, l
I I
Rev. 2.
Measuring and test equipment is controlled in accordance with applicable plant procedures and practices, i
l l
l l
14.0 HANDLING STORAGE AND SHIPPING l
l l
1 I
I l
14.1 Section 13.0 of this manual is not applicable for the handling, I
)
storage and shipping of fire protection related materials and l
l equipment.
No particular requirements for this Section have i
been identified in BTP-APCSB 9.5-1, Rev. 2.
Handling, storage I
and shipping activities are controlled in accordance with l
. applicable plant procedures and practices.
I I
i l
15.0 INSPECTION TEST AND OPERATING STATUS l
l l
15.1 Measures are established to provide for the identification of l
I items that have satisfactorily passed required inspections and l
tests and are documented per approved instructions or procedures.
l
\\
l l
1 15.2 Section 14.0 of this manual is applicable for identifying the l
inspection, test and operating status of the fire protection I
system.
1 I
I l
1 l
16.0 NONCONFORMING MATERIAL, PARTS AND COMPONENTS l
l I
I I
l 16.1 The control of nonconforming materials, parts and components l
related to the fire protection system is described in Section 1
l 15.0 of this manual, with the exception of paragraph 15.3, when I
l the item is not associated with the Q-list.
Vendor l
nonconformances are to be submitted to AP&L only when so l
designated on the procurement document.
l l
1 l
1 l
l 1
I l
1 A
l QA MANUAL OPERATIONS lREV.
9 l
P l
lDATE 7/22/87 l
l l SECTION:
APPENDIX B - QUALITY PROGRAM lPAGE AB-10 l
l L
l FOR FIRE PROTECTION l
l l
I I
l
l l
l l
l 17.0 CORRECTIVE ACTIONS l
l l
17.1 A corrective action system is to be established to ensure that conditions adverse to fire protection, such as failures, g
i malfunctions, deficiencies, deviations, defective components, I
l uncontrolled combustible materials and nonconformances, are l
l promptly identified, reported and corrected.
I I
I I
I l
17.2 Correctiva action activities are controlled as described in l
l Section 16.0 of this manual, with the following exception l
I related to paragrapn 16.3.
Vendors furnishing fire protection l
l items not associated with the Q-list are not required to be l
j l
listed on the QVL.
I I
I l
l i
18.0 QUALITY ASSURANCE RECORDS 1
I I
I 1
l 18.1 Records which furnish evidence that the criteria enumerated in l
I this program are being met for activities affecting the fire i
protection program are to be prepared and maintained as O
l I
i described in Section 17.0 of this manual.
A listing of I
documents and records (including calculations, test reports, I
I I
code reports and design change packages) relating to fire I
protection is included within the AP&L Fire Protection Program I
l Manual.
I l
l19.0 AUDITS I
i 1
19.1 Audits are to be conducted and documented to verify compliance I
with the fire protection program, including design and i
procurement documents, instructions, procedures and drawings l
I and inspection and test activities.
Section 18.0 of this I
I manual is applicable for the control of audits related to the j
I l
l l
l-1 I-1 I
A l
QA MANUAL OPERATIONS REV.
9 l
P I
lDATE 7/22/87 l
l l SECTION:
APPENDIX B - QUALITY PROGRAM lPAGE AB-11 l
l L
l FOR FIRE PROTECTION I
l l
1 I
I
y I
l l
I I
19,2 As a minimum, audits of the fire protection program are to be I
I I
scheduled at specified frequencies in accordance with the Technical Specifications applicable to each nuclear unit.
l l
l I
l I
I l
l l
l l
l l
l 1
I I
I I
I I
l I
I I
I I
I i
I I
t I
l I
I I
I I
I I
I I
i l
i l
I i
l b
I O
\\
i l
l I
I I
I I
I I
I I
i l
l 1
1 I
I I
I l
l l
l l
1 l
l l
i I
I l
l I
I I
l-I I
I I
I I
I I
I I
i A
l QA MANUAL OPERATIONS lREV.
9 i
P l
IDATE 7/22/87 l
l 1 SECTION:
APPENDIX B - QUALITY PROGRAM lPAGE AB I l
L i
FOR FIRE PROTECTION I
l l
l l
l i