Forwards Request for Addl Info Re Continuing Review of BSAR-205.Response Requested by 760628.W/o Encl
ML20040A332
Person / Time
Site: 05000561
Issue date: 05/14/1976
From: Stolz J
Office of Nuclear Reactor Regulation
To: Suhrke K
BABCOCK & WILCOX CO.
Shared Package
ML111090060 List: ... further results
References
FOIA-80-515, FOIA-80-555 NUDOCS 8201200773
Download: ML20040A332 (2)


Text

.

= <

i

~

1 DISTRIBUTION:

?,!AY 141976 m

v I

Docket File W Gamill, DSE NRC/PDR W Mcdonald, MIPC L/PDR OELD LWR-1 File IE(7)

R DeYoung ACRS (16)

Docket No: STN 50-561 20 F Williams R Maccary, SS J Stolz R Tedesco, SS Babcock & Wilcox Company H

th (2)

ATTN: Mr. Kenneth E. Suhrke R Heineman, SS bec:

Manager, Licensing H Denton, DSE JR Buchanan, NSIC Nuclear Power Generation V Moore, DSE TB Aberriathy, TIC P. O. Box 1260 R o DSE Lynchburg, Virginia 24505 y

Gentlemen:

As a result of our continuing aview of your Standard Safety Analysis' Report BSAR-205, we find that we need additional information to complete our evaluation. The specific information required is listed in the.

enclosure. Please note that the enclosure conforms to our new fomat and numbering system for requests for additional information. This numbering system differs from that used during our acceptance review and is des.-

cribed at the beginning of the enclosure for your information.

E Please note also that we have not completed our first-round review of Section 15 of your SSAR, and we expect that additional requests for infor-('

mation will be fomarded to you by separate letter.

Our review has identified certain areas of your. SSAR which are not accept-

, able to the staff.'?~To avoid future delays, we wish to advise you of our positions in these areas. These positions, identified by the notation (RSP) next to an item number in the enclosure, reflect our resolution of the safety issue which is acceptable for a decision concerning the issuance of a construction permit. Accordingly, we request that you amend your PSAR to clearly state your intent regarding compliance with each of these post-tions. We are prepared to meet with you to assure your complete under-standing of our positions and our bases for them, if necessary.-

To maintain our licensing review schedule for your SSAR, we need your responses to the enclosure items by June 28,1976. If you cannot meet j

these requirements, please infom us within seven days after receipt of this 1etter of the dates you plan to meet so that we may revise our schedules l

accordingly.

Please contact us if you have any questions about the information requested.

Sincerely, signed by Oriano John F. Stoh John F. Stolz, Chief f4aht th+ar Donetnre Rranch Nn_ 1 Diirision of Project llanagement.'

LWR-1 ph.

,,,,fgcl osum:

test'for Additional Information TCoxil'df/g JStelz

..fiS; See next pag a

,,,jfj 773 -

l g i g 73 810403 NADDEN80-515 PDR

a.

N Babcock & Wilcox Company MAY 141976 ss

\\

cc: Washington Public Power Supply System ATTH: Mr. J. J. Stein Managing Director P. O. Box 968 3000 George Washington Way Richland, Washington 99352 Mr. Robert Borsum Bethesda Representative Babcock & Wilcox Company Nuclear Power Generation Division Suite 5515, 7735 Old Georgetown Road Bethesda, Maryland 20014 B. G. Shultz Project Engineer Stone & Webster Engineeri'ng Corp.

P. O. Box 2325 Boston, Massachusetts 02107 Mr. A. H. Monteith Ohio Edison Company 47 North Main Street Akron, Ohio 44308 Mr. W. E. Kessler Commonwealth Associates, Inc.

209 East Washington Jackson, Michigan 49201