ML20039F434
| ML20039F434 | |
| Person / Time | |
|---|---|
| Site: | 05000561 |
| Issue date: | 07/10/1978 |
| From: | Cox T Office of Nuclear Reactor Regulation |
| To: | Heltemes C Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML111090060 | List:
|
| References | |
| FOIA-80-515, FOIA-80-555 NUDOCS 8201120457 | |
| Download: ML20039F434 (2) | |
Text
.
~
DISTRIBUTION:
T. Cox, SB, PM Docket No. 50-561 d
.O NRC PDR i
Docket Files
~
~
~~
July 10,1978 SB Chron File 3 :
SB Reading File
^l W P Cammill, SAR, PM REVISED MEETING NOTICE C J Heltemes, SB, PM i
Meeting Participants Bethesda-MNBB Receptionist
. MD10RANDUM FOR:
C. J. Heltemes, Jr., Chief, Standardization Branch, DPM
.u.
FROM:
Thomas Cox, Project Manager, Standardization Branch, DPM
SUBJECT:
MEETING WITH BABCOCK & WILCOX (B&W)
[
TIME & PLACE:
9:30 a.n., Thursday, July 20, 1978 I
LOCATION:
MNBB 6110 PURPOSE To discuss post-Preliminary Desigr Approval _
.1._
resolution of the cold shutdown issue (see enclosed agenda).
PARTICIPANTS:
NRC T. Cox, G. Mazetis, T. Novak, S. Newberry.
V. Benaroya, D. Fischer, W. Lefav, R. Baer,
~
D. Tibbitts
<. - - - - - - - - - - - ~ - - - - -
~"
F. Levandoski, H. Bailey, D. Newton, E. Swanson, I b
_I..l J. Concklin
....p 4
- 7e 1,.. _....-..
. u. -J 1
.-.u..
c.
n a.....' L L.
^
A.. 5.:~
~
Thomas H. Cox, Project Manager' @
..r Standsidization Branch
.e Division of Project Management
~
L.,
Enclosure:
Agenda
...y
.e
\\
g i\\.
.\\
l-22745.
_SB!PM SB:PM
\\
f TCox; Jk S '.~
- i
..CJHetteces.
l eva=*=,,
' '~
y
.s...
. M
.ai-V. -- '
~ " " ' ' ",
- " *2.;' ' N,,
7/10/78..
__7/1$ff,2 l
.m
- t l
-r2011204'J7 810403 1'r un s. eovsa==awt pas = vine orrecs, sere.eas.eae N!C FoKM )IS (9 7H N'atv n*sa PDR FDI4 i
MADDENOO-515 PDR t
~
I
.e i
'AX NDA_
Meeting of Babcock & Wilcox and NRC Staff, July 13, 1978 B&W will describe its plans for responding to the staff's requirements as described in Regulatory Guide 1.139, " Guidance for Residual Heat Removal" (issued for connent in May 1978), and as required by the BSAR-205 f
Safety Evaluation Report and Preliminary Design Approval issued on May 31 j
1978. Discussion topics will include:
1.
Steam generator dump valve capacity and qualification.
2.
Depressurization of the reactor coolant system.
3.
Boration to Cold Shutdown Conditions.
4.
Testing of natural circulation, boration, and depressurization capabili ty.
5.
Interface requirements for referencing applicants.
6.
Schedule for complete resolution of th'e post-Preliminary Design Approval issue.
b.,
s%M
+
?
g
/
j; E
~ _..
a i
_ _ _ _ _ _ _ _ _