ML20039F432
Text
-
s f
e
.0 3,
Y DISTRIBUTION b
tigc Mnntino Attende Bethesda Receptionist H. Cox,'SB, DRM Docket File July 3, 1978 tlRR Reading
/
('
SB Chron i
SB Reading Docket tio. 50-561 W P Gammill, SAR, DPM RCDeYoung, DPM MEMORAllDUM FOR:
C. J. llelterns, Jr., Chief, Standardization Branch DM FROM:
Thomas Cox, Project Manager, Standardization Branch, DPM
SUBJECT:
MEETI!G WITH BABCOCK & WILC0X (B&W)
TIME & PLACE:
1:00 p.m., Thursday, July 13, 1573
~~~ LOCATION:
Room P-501, Phillips Building
. e-e
~
PURPOSE To discuss post-Preliminary Design Approval resolution of the cold shutdown issue (see enclosed agenda).
PARTICIPA!!TS:
ilRC T. Cox, G. Mazetis, T. flovak, S. Itewberry,
/
V. Benaroya, D. Fischer, W. Lefav, R. Baer, D. Tibbitts 4
9{b, W
B&W i
h F. Levandoski, H. Bailey, D. Newton, E. Swanson.
v J. Concklin 9 10 l l
originals 4ned BU l
T.cos y i
Thomas H. Cox, Project Manager Standardization Branch d
Division of Project Management
Enclosure:
Agenda
- f'"'t W
dW e
L. Er.gle D. Tibbitts S. Burwell i. Siiva
....... $k een-n 1'
[
gy a.
u.
<,.1., s,cu o,..
w...................,,,,,,,,,,_,,..
PD 54 830403 MADDEN 80-515 PDR
~
sa
!o AGENDA Meeting of Babcock & Wilcox and NRC Staff, July 13, 1978 B&W will describe its plans for responding to the staff's requirements as described in Regulatory Guide 1.139, " Guidance for Residual Heat Removal" (issued for comment in May 1978), and as required by the BSAR-205 k
Safety Evaluation Report and Preliminary Design Approval issued on May 31, f
1978.
Discussion topics will include:
1.
Steam generator dump valve capacity and qualification.
2.
Depressurization of the reactor coolant system.
l 3.
Boration to Cold Shutdown Conditions.
4.
Testing of natural circulation, boration, and depressurization capabili ty.
5.
Interface requirements for referencing applicants.
6.
Schedule for complete resolution of the post-Preliminary Design Approval issue.
99 l
~
e 5