Notification of 780713 Meeting W/B&W in Bethesda,Md to Discuss post-preliminary Design Approval Resolution of Cold Shutdown Issue.Meeting Cancelled & Changed to 780720.Agenda Encl
ML20039F432
Person / Time
Site: 05000561
Issue date: 07/03/1978
From: Cox T
Office of Nuclear Reactor Regulation
To: Heltemes C
Office of Nuclear Reactor Regulation
Shared Package
ML111090060 List: ... further results
References
FOIA-80-515, FOIA-80-555 NUDOCS 8201120454
Download: ML20039F432 (2)


Text

-

s f

e

.0 3,

Y DISTRIBUTION b

tigc Mnntino Attende Bethesda Receptionist H. Cox,'SB, DRM Docket File July 3, 1978 tlRR Reading

/

('

SB Chron i

SB Reading Docket tio. 50-561 W P Gammill, SAR, DPM RCDeYoung, DPM MEMORAllDUM FOR:

C. J. llelterns, Jr., Chief, Standardization Branch DM FROM:

Thomas Cox, Project Manager, Standardization Branch, DPM

SUBJECT:

MEETI!G WITH BABCOCK & WILC0X (B&W)

TIME & PLACE:

1:00 p.m., Thursday, July 13, 1573

~~~ LOCATION:

Room P-501, Phillips Building

. e-e

~

PURPOSE To discuss post-Preliminary Design Approval resolution of the cold shutdown issue (see enclosed agenda).

PARTICIPA!!TS:

ilRC T. Cox, G. Mazetis, T. flovak, S. Itewberry,

/

V. Benaroya, D. Fischer, W. Lefav, R. Baer, D. Tibbitts 4

9{b, W

B&W i

h F. Levandoski, H. Bailey, D. Newton, E. Swanson.

v J. Concklin 9 10 l l

originals 4ned BU l

T.cos y i

Thomas H. Cox, Project Manager Standardization Branch d

Division of Project Management

Enclosure:

Agenda

  • f'"'t W

dW e

L. Er.gle D. Tibbitts S. Burwell i. Siiva

....... $k een-n 1'

[

gy a.

u.

<,.1., s,cu o,..

w...................,,,,,,,,,,_,,..

PD 54 830403 MADDEN 80-515 PDR

~

sa

!o AGENDA Meeting of Babcock & Wilcox and NRC Staff, July 13, 1978 B&W will describe its plans for responding to the staff's requirements as described in Regulatory Guide 1.139, " Guidance for Residual Heat Removal" (issued for comment in May 1978), and as required by the BSAR-205 k

Safety Evaluation Report and Preliminary Design Approval issued on May 31, f

1978.

Discussion topics will include:

1.

Steam generator dump valve capacity and qualification.

2.

Depressurization of the reactor coolant system.

l 3.

Boration to Cold Shutdown Conditions.

4.

Testing of natural circulation, boration, and depressurization capabili ty.

5.

Interface requirements for referencing applicants.

6.

Schedule for complete resolution of the post-Preliminary Design Approval issue.

99 l

~

e 5