Notice of Receipt of SSAR
ML20039F416
Person / Time
Site: 05000561
Issue date: 03/03/1976
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML111090060 List: ... further results
References
FOIA-80-515, FOIA-80-555 NUDOCS 8201120437
Download: ML20039F416 (2)


Text

"_

3, e

l UNITED STATES NUCLEAR REGULATORY C0t'J4ISSION DOCKET NO. STN 50-561

[

BA'BC0CK & WILC0X OMPANY NOTICE OF RECEIPT OF A STANDARD SAFETY ANALYSIS REPORT Babcock & Wilcox Company has filed withthe Nuclear Regulatory Commission (the Commission) its Standard Safety Analysis' Report (B-SAR-205), which was docketed on fiarch 1 1976.

The B-SAR-205 appii. cation was filed in response

~

to Option 1 (Reference System) of the Commission's standardization policy for nuclear power plants issued on March 5,1973, and pursuant to Appendix 0 to 10 CFR Part 50.

I i

B-SAR-205 was tendered on October 24,.1975.

During the acceptance review

~

for completeness, Babcock & Wilcox Company submitted additional information by letter dated February 13, 1976.

Sub'sequently, B-SAR-205 was found to be

( ' ' >, acceptable for docketing.

Docke't No. STN 50-561 has been assigned to B-SAR-205 and should be referenced in any correspondence relating thereto.

Under the " Reference System" opti'on, an entire facility design or major fractions of it can be identified as'a standard design to be used in multiple applications..

B-SAR-205 describes and analyzes the Babcock-205 nuclear steam

~

. system preliminary standard design for a pressurized water reactor nuclear power plant.

The B-SAR-205 reference design is designed to operate at core thermal power levels up to 3800 megawatts.

Major design features described in B-SAR-205 are similar to those of Babcock & Wilcox 205-fuel assembly nucl' ear steam systems now under construction or in construction permit review.

When its review of B-SAR-205 is complete, the Commission's Office of Nuclear Reactor. Regulation (staff) will publish a Safety Evaluation Report

~.

documenting the results of the review. Moreover, B-SAR-205 will be referred

$ ' $ 3l 810403 MADDENOO-515

~

PDR l'

\\,

to the Advisory Committee on Reactor Safeguards for its review and a report, thereon.

Copies of the Safety' Evaluation Report and the report by the Advisory Committee on Reactor Safeguards will be made available to the public.

A notice relating to the availability of these documents will be published

  • in the FEDERAL REGISTER.

All interested persons who desire to submit written coments for con-sideration by the staff and ACRS during their review of B-SAR-205 should send them to the Office of the Secretary, U. S. Nuclear Regulatory Commission,

, ashington, D. C.

.20555, Attention:

Docketing and Service Section by W

j l

l May 10,1976.

A copy of B-SAR-205 is available for p'ublic inspection at the Commission's Publ,1c Docuinent Room,1717 H Street, N. W., Washingtori, D. C.

20555. When f

available, the Safety Evaluation Report and the report by.the Advisory Comittee on Reactor Safeguards will also be made available for public in-l spection at the above location.

Dated a't Bethesda, Maryland this jrd ay of March,1976.

d I

FOR THE NdCLEAR REGULATORY COMMISSION pegrasig cdbz John F. Stolz, Chief Light Water Reactors Branch No.1 Division of Prvject Management 6