C-E Pswer Systems Tel. 203/688-1911 Combusbon Engineering, Inc. Telex 99297 1000 Prospect Hill Road Windsor. Connecticut 06095 POWER HiSYSTEMS Docket No.: STN-50-470F October 25, 1982 LD-82-084 Mr. Cecil Thomas, Chief Standardization and Special Projects Branch Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Withdrawal of Appendix C to CESSAR-F

Reference:

Letter LD-81-088, A. E. Scherer to C. Grimes, dated December 2, 1981

Dear Mr. Thomas:

Combustion Engineering (C-E) prepared and submitted, via the reference letter, a report describing reactor operation with two reactor coolant pumps in diametrically opposed cold legs. The report, designated Appendix C to CESSAR-F, supports operation of a System 80 NSSS at reduced power level with two pumps.

C-E hereby withdraws Appendix C from NRC review. Partial-loop operation is not required for the issuance of a Final Design Approval for CESSAR-F.

If you have any questions on the withdrawal decision please contact me or Mr. G. A. Davis of my staff at (203)688-1911, Extension 2803.

Very truly yours, COMBUSTION ENGINEERING, INC.

A. E. ScW rer Director Nuclear Licensing AES:ctk 8210280202 821025 PDR ADOCK 05000470 B PDR