Text
e
-t
--i 3 1
ycnog h,
UNITED STATES s
E 8' NUCLEAR REGULATORY COMMIR510N n.
i f
wAsHawoTow, p. c, roses kg***** /
May 1, 1989 Bradley W.. Jones, Esq.
LU.S. Nuclear Regulatory Commission Mail.$ top 16 H3 Washington, D.C.
20555 o
Re Contract No. NRC-34-89-347 d
Dear Mr. Jones:
,q As required by Section F.4 of the above contract, this i
is my letter progress report for the period between' April.1 and April 30, 1989.
During that period, I worked on all four of the investigations involving the Office of Investigations-(OI) j
'or which I have contractual responsibility.
In connection with the investigation involving the OI handling of the Ellison allegations and certain related' matters, I continued j
my review'of the voluminous materials contained.in the
.j investigative file; provided general'and specific guidance to the Office of the General Counsel (OGC) attorney detailed to, assist in the investigation;' consulted with OGC attorneys
. concerned with the enforcement of the-subpoena ducas tecum issued to Stephen B. Comley at my request; met with. members of the-staffs of Congressmen Gejdenson and Miller to discuss
'the release of investigative material to them; and-prepared a partial investigation report.
That report willibe 1
forwarded-to the Commission later this week.and will cover all issues' associated with the Ellison allegations other than those that cannot be resolved prior to the outcome of the subpoena matter.
With respect to two of the other three investigations, memo'pleted my review of the investigative files and sent I com randa to the Commission on April 10 and'12 that contained my recommendations respecting the disposition of
)L
.the allegations that triggered those investigations.
The recommendations were accepted by the commission, with-the consequence that those investigations are now completed.
The remaining investigation contains many broad assertions of wrongdoing on the part of several OI officials and employees.
I am being assisted in the conduct of that investigation by an investigator who was detailed from the now Office of the Inspector General.
In the interest of completing the investigation as soon as possible, I have 9003050115 900301 S
(/
AIRDZO90-3 PDR 6
f x,. :, ' '~
'L 7...
o b
2 consulted daily with the investigator with. regard to strategy and have closely monitored her progress.
l
-As. earlier-noted, the refusal-of Mr. Comley to comply-with the subpoena ducas. tecum issued to him, and the resultant' necessity to seek judicial. enforcement, is' delaying the. completion of the investigation.to which that
.subpogna relates.
That. delay.may be appreciable but is.
+
beyond my control'., No'other problems or delays were encountered during the reporting period.
My daily log is attached.
As required, it reflects.the ntudaer. of hours devoted each day to work specifically. in the performance of the contract and, if any, work as a member of the Atomic Safety and Licensing. Appeal Panel.
I The. contract costs incurred during this reporting period. consist entirely of my compensation, as follows:.
8 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> days at $500.00 per day- $4,000.00 5-7 hour days at $ 62.50 per hr
$2,187.50 4
'6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> days at $ 62.50 per hr 750.00 3
5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> days at $ 62.50 per hr 937.50 2
- 4. hour days at $ 62.50 per hr 500.00 Total
$8,375.00 All services were performed within the 7:30 a.m. to o
6:00 p.m., period (as specified in Section B.3).
1 If any other information is desired, please'let me Sincerely, Alan S. Rosenthal AttaEhment As stated
cm
., p
...j;., * -
e
' C ALAN 86 ROSENTHAL' U.
TIME) SHEET-FOR-. INVESTIGATION AND APPEAL PANEL-WORX-c Q
Investigation-
-Appeal Panel
'Date-3.
'Apr:3; 7
1 (11:00-12:00)
E' eApr:4 6-
- 2. (10:00-11:00).
P (1 30-2:30)'
Apr'5' 8
g;
/
Apr 6-8 Apr 7 7-1 (10:00-11:00)-
e.
Apr:10 7
1 (1:15-2:15) 1 s
s' Apr ll' 8.
]
JApr-12 8
AprJ13; 8
Apr 14-5 3-(7:30-9:30)
(2:00-3:00),
iAprI17 7
1 (2:30-3:30)
Apr 18.
5-3 (1:15-4:15)
~
'Apr'19 4
4 (7:30-11 30)
I Apr;20 4
4 (8:'30-11:30)
(1:30-2:30)
Apr 21-5 3 (l ': 15-4 : 15 )
- Apr'24 7
4 1Apr!25 8
'Apr 26 8
I Apr,27.
6 2 (1:00-3:00)
-Apri28 8
o
}
m