b
..a e
p>* "* %[c(
(
4 UNITED STATES 8.
NUCLEAR REGULATORY COMMISSION
^
ei
.f wAsmwovow, o. c. pnu j
%**..*.c8 November 1, 1989 i
Stephen G. Burns, Esq.
U.S. Nuclear Regulatory Commission Mail Stop 16 H3 Washisgton, D.C.
20555 Ret Contract No. NRC-34-89-347
]
Dear Mr. Burns:
l As required by Section F.4 of the above contract, this is my letter progress report for the period between October 1 and October 31, 1989.
During this period, I prepared for, and testified at I
(on October 12), the hearing conducted by the Subcommittee on General Oversight and Investigations of the House Committee on Interior and Insular Affairs.
No work was done in furtherance of Investigation 89-02 because of the continued failure of Mr. Conley to comply with the judicial order enforcing the subpoena issued to him.
In this connection, as you were previously informed, I plan to attend the oral argument of his appeal from that order, which is scheduled for November 7 in Boston.
My daily log is attached.
As required, it reflects the l
number of hours devoted each day to work specifically in the performance of the contract and, if any, work as a member of the Atomic Safety and Licensing Appeal Panel.
The contract costs incurred during this reporting l
period consist of my compensation and travel expenses on Metro on October 12.
My compensation is as follows:
1 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> day
$$ 62.50 per hour
$375.00
,1 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> day 0$ 62.50 per hour
$187.50 Subtotal
$562.50 Metro expenses 4.80 Total
$567.30 All services were performed within the 7:30 a.m. to 6:00 p.m.,
period (as specified in Section B.3).
9003050103 900301 PDR FOIA AIRDZO90-3 PDR (u
{-
I i'
L i
.i l
l If any other information is desired, please let me know.
L Sincerely, i
Alan S. Rosenthal Attachments j
As stated i
k I
i e
1 l
l i
Ns'
\\
.W ALAN S. ROSENTHAL TIME SHEET FOR INVESTIGATION AND APPEAL PANEL WORK l
[
l.
Date Investigation Appeal Panel I
October'2 8
L j
. October 3 3 (1:00-4:00) 5 r
r l
October-4 8
[
t October 5 8
j:
. October 10 8
l i'
t-October 11-8 2"'
October 12 6
i October 13 8
October 16 8
October 17 8
October 18 8
October 20 8
October 23 8
4-October 24 8
October 25 8
l i.
I I
.