October 2, 1989 Stephen G. Burns, Esq.
U.S. Nuclear Regulatory Commission Mail Stop 16 H3 Washi6 ton, D.C.
20555 i
9 p
Re:
Contract No. NRC-34-89-347
Dear Mr. Burns:
As required by Section F.4 of the above contract, this is my letter progress report for the period between September 1 and September 30, 1989.
Dnring this period, I prepared and submitted to the l
Commission (on September 21) a 64-page interim report in connection with Investigation 89-02.
In addition, I spent considerable time discussing with attorneys in the office of the General Counsel the strategies that should be followed l
in-the Comley subpoena matter.
Still further, I met with Congressman Kostmayer on September 26 and had several conversations with Commission officials with regard to his interest in some of the investigative materials generated by me.
The delays encountered during the reporting period were entirely the result of the continued failure of Mr. Comley to comply with the judicial order enforcing the subpoena issued to him.
My daily log is attached.
As required, it reflects the number of hours devoted each day to work specifically in the performance of the contract and, if any, work as a member of the Atomic Safety and Licensing Appeal Panel.
The contract costs incurred during this reporting peri 6d consist of my compensation and travel expenses on Metro on September 26.
My compensation is as follows:
8 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> days P $500.00 per day
$4,000.00 1
4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> day 6 $ 62.50 per hour 250.00 2
2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> days 6 $ 62.50 per hour 250.00 Subtotal
$4,500.00 Metro expenses 3.40 t.
Total
$4,503.40 9003050105 900301 PDR FOIA AIROZO90-3 PDR
.+
All services were performed within the 7:30 a.m. to 6:00'p.m., period (as specified in Section B.3).
If any other information is desired, please let me know.
Sincerely, (h d h4Rw Alan S.
Rosenthal
Attachment:
As stated E
4 f.',
3, g
m
, 3-4 ALAN S. ROSENTHAL TIME SHEET FOR INVESTIGATION AND APPEAL PANEL WORK i
I" Date Investigation Appeal Panel September-5 8
s i
September 6-8 I
o 8
i September 7 September 8 2 (10:00-12:00) f I
September 11 8-I F
September.12 8
j-September 13 8
September 14 8
September 18 8
September 19 8
t September 20 8
[
September 21 8
September.26 4 (2:00-6:00) 4 (8:00-12:00)
-September 27 8
September.29 8
July'7 2 (10:00-12:00)
P t
6
,