05000272/LER-1981-091-03, /03L-0:on 810929 & 1001,Channel 3 Pressurizer Level Read Higher than Other Channels.Caused by Transmitter Drifting Out of Calibr.Transmitter Recalibr

From kanterella
(Redirected from ML20011A953)
Jump to navigation Jump to search
/03L-0:on 810929 & 1001,Channel 3 Pressurizer Level Read Higher than Other Channels.Caused by Transmitter Drifting Out of Calibr.Transmitter Recalibr
ML20011A953
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/21/1981
From: Dickey F
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20011A948 List:
References
LER-81-091-03L-01, LER-81-91-3L-1, NUDOCS 8111030403
Download: ML20011A953 (1)


LER-1981-091, /03L-0:on 810929 & 1001,Channel 3 Pressurizer Level Read Higher than Other Channels.Caused by Transmitter Drifting Out of Calibr.Transmitter Recalibr
Event date:
Report date:
2721981091R03 - NRC Website

text

CRC FORM 366 U. S NUCLEs.O CE GUL ATOP.Y COMMIS5sDN (7 77)

LICENSEE EVENT REPORT A

CONTROL OLOCK: l l

l l

l l

l (pg[ Agg pmig7 ;P T'.'

ALL REQUI AED INFORMATIONI i

6 lo IiI in la is I ci s!) l@! o f ol -l o f o i o l o l o I - I o l 01@4 I i l 1 I i l 2 l@l l

l n -,, @

ocENstE Coa.

i, ucENst~s..Em a

x ucEN,E Tv,E o C ON'T

10I11, Nm: dl ol Sl olo I of 21712 hl 0l 9l 2l 9l 8l lhl1l ol 2l ll 8l 1l@

so si occxETNuu Em

.e 69 avtNT cATE 3a

?>

mE*omt cAtt s:

EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h Iol2i l On two separate occasions, September 29, 1981 and October 1, 1981, an operator g

Io}31 l noticed that the Channel 3 Pressurizer Level was reading higher than the other two l

Io I4 I l channels. At 0720 and 0835 hours0.00966 days <br />0.232 hours <br />0.00138 weeks <br />3.177175e-4 months <br />, respectively, the channel was declared inoperable,j loi5l l and limiting condition for operation (LCO) 3.3.1.1, Action 7 was entered.

l l C l6 l l l

10171 1

_J t o is I I J

7 8 9 6;

systEY

CAUsE

CAUsE Cov8 ga(yt CODE coct sus 000E Cou'ONENT CoCE sut ODE lI ! A lh Wh Wh l Il Nl Sl Tl Rl Ulh [@ SU8000El Zl@

lol91 7

8 9

to 11 12 13 16 f f, 2e SE C.:E NTi A L OCCum a E NCE mEroe; mEs is. s

_EVEst vtan mE80mT NC CODE TvPE N

O,"LE n aj'.yl e I 11 1-1 I of 91 11 [f_J l ol 31 lLI L-]

I I

_2' 22 23 24 26 27 29 29 3.

31 3;

ACTIO N SUTURE EFFECT SMUTOOWN ATT &Owp E NT hem D-a PalVE C0YP.

CC"e:s ts t T ax E *d ACTION ONP, ANT UET*00 MOums suev4TTED FORM aut sueeutm M A%8 A;T.s E 6 i

iel@lzl@

I z l@

l zl@

lo lo lo I

LY l@ 0@

IL l@ laloi8loIS 33 34 35 3t 37 40 41 42 43 e4 4:

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h I i I e l l On both occasions the Channel 3 Pressuriner Level bistable was placed in the tripped l lili1l condition within one hour.

On September 29 the transmitter was recalibrated, tested l l,1 ; i l satisfactorily, and returned to service. On October 1 the transmitter was backfilled; l l3l l to remove trapped air, recalibrated, tested satisfactorily, and returned to service. l lt la i 1 At 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br />, September 30, 1981 and 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br />, October 3, 1981, respectively, l

7

',' y 3.3.1.1 Action 7 was terminag d. g l-4,2) s:

h sTATas snowEn oTwEn status \\,)0 osscovE mY oiscovEmY oEs:mirTroN 3

li l5 l [h l0 l 9 l 7 lhl N/A l

W hl Operator Observation l

A TivlTY CO TENT mELEAsED 08 mELE Ast AucuMT OF ACTIVITY LOCATION OF atLE Ast d h Wh!

N/A I

l N/A l

etasoNNEL ExposSEs 2'

. j,

E I o f o f ol@l zi@lDEsemietioNhiEm.

e wuusta Tvrt I

N/

,Easo~NEl',,uvLs o 2 toa a

otsemirTioNh huweta 8 1olofol@l

'N/A I

T ii n

n Loss OF On DAMACE TO FACIUTY TYPE DEscal'T40N b h!

N/A I

m.,33 dg f @'" gyg,,, g O

NRC USE ONLY L.

l w/A S

I 11111:

1111111 7

,o

.o -

WAME OF PREPARER