MONTHYEARML20106D2091984-10-19019 October 1984 Requests Approval to Use Portions of Winter 1983 Addenda of ASME Boiler & Pressure Vessel Code,Section XI for Selection & Exam of Class 2 Piping Welds Re Preservice Insp Program Project stage: Request ML20128L6691985-05-20020 May 1985 Forwards Matls Engineering Branch SER Based on Util 850131 Alternative Plan for Preservice Exam of ASME Class 2 Piping. Methodology Acceptable Project stage: Other ML20128H1331985-06-0606 June 1985 Summary of 841212 Meeting W/Util in Bethesda,Md Re Preservice Insp Program.Meeting Notice,Agenda,Summary of Major Topics & Preliminary Preservice Insp Program Encl Project stage: Meeting ML20151N7281985-12-26026 December 1985 Forwards Preservice Insp Program,Including NDE Ultrasonic Exam of Vessels & Piping,Bolting Exam & Class 2 Piping Exam Criteria.Approval of Program & Closing of SER Open Items Requested by 860301.W/o Program Project stage: Other ML20205M6561986-04-0909 April 1986 Forwards Rev 2 to Chapter 3.7 of ASME Section XI Pump & Valve Administrative Procedure & Rev 0 to Inservice Testing Plan for Pumps & Valves. Comments & Confirmatory Status on SER Open Item Requested by 860701 Project stage: Other ML18041A1321986-05-13013 May 1986 Confirms 860417 Telcon Agreements Re SER (NUREG-1057) Open Item 4 Concerning Preservice Insp Program,Including Exam of Component Supports & Break Exclusion Zone (Augmented Inservice Insp) Exam of 2-inch Welds & Smaller Project stage: Other ML20214P9391986-11-26026 November 1986 Forwards Request for Addl Info on Inservice Testing Program, SER Open Issue 1(b) & Associated Relief Requests,Submitted on 860409.Meeting Should Be Arranged W/Nrc Prior to Preparing Written Response Project stage: RAI ML20212H2931987-01-13013 January 1987 Confirms Resolution Arising from Dec 1986 Telcons That Requirements for Preservice Insp of Reactor Vessel Nozzle Inside Radius Section Volumetric Exam Can Be Met Using Ultrasonic Methods.Relief Request 1 in Withdrawn Project stage: Request ML20212M2491987-01-23023 January 1987 Discusses SER Open Item (4)(a) Re Preservice Insp Program. Selection of Specific Supports for Exam from Among Support Candidates Would Be Done Utilizing Enhanced Multiple Streamling Technique Per Iwb & Iwc Project stage: Other ML20207S1361987-03-11011 March 1987 Summary of 870211,12 & 24 Meetings W/Util Re Inservice Testing & Safe & Alternate Shutdown Capability,Per SER Open Issues 1b & 5.List of Meeting Attendees Encl Project stage: Meeting ML20207S4331987-03-12012 March 1987 Forwards Relief Request 7 Re Preservice Exam of Piping Welds That Could Not Be Completed in Accordance W/Asme Section XI Due to Inaccessibility.High Percentage (73%) of Total Weld Population Inspected at 75% or More of Full Code Exam Project stage: Request ML20206J7781987-04-0606 April 1987 Forwards Revised Preservice Insp Relief Requests 2-6 for Listed Vessels,Including Pressurizer,Steam Generator & Residual Hx,Per 861226 Submittal,For Review & Approval.Encl Proprietary Westinghouse Spec Details for Vessels Withheld Project stage: Request ML20206G2081987-04-0808 April 1987 Forwards Rev 4 to 2BVM-179, ASME Code Baseline Document Project stage: Other ML20215H4671987-04-13013 April 1987 Discusses Application of Const Visual Exam Results for Safety Class 3 Support Integrally Welded Attachments to Satisfy ASME Section XI Preservice Exam Requirements Project stage: Other ML20215H3711987-04-15015 April 1987 Forwards Rev 1 to Inservice Testing Plan for Pumps & Valves, Per SER Open Item 1(b).Plan Reflects Agreements W/ Nrc,Eg&G & Util Representatives During 870211 & 12 Working Meetings.Info Should Be Sufficient to Close Out SER Item Project stage: Meeting ML20006D8961987-07-0202 July 1987 Grants Interim Relief from Certain Testing Requirements of 10CFR50.55a Re Inservice Testing Program Until End of First Refueling Outage or Until Detailed Review of Program Completed Project stage: Approval ML20148K5161988-03-18018 March 1988 Forwards SER Supporting Util Inservice Testing Program for Pumps & Valves for 871117-971117 & Request for Relief from Certain Testing Requirements Project stage: Approval ML20154Q2031988-06-0101 June 1988 Forwards Inservice Insp 10-Yr Plan for First Insp Interval at Beaver Valley Power Station Unit 2 Project stage: Other ML20196C3061988-06-20020 June 1988 Provides History Leading to & Justification for Deleting Pumps Control Room Refrigeration Pumps from Rev 2 to Inservice Testing Program Project stage: Other ML19332C3051989-11-20020 November 1989 Forwards Request for Addl Info Re Rev 1 to First 10-Yr Interval Inservice Insp Program Plan & Associated Relief Requests Submitted by .Response Requested within 45 Days of Receipt of Ltr Project stage: RAI 1987-03-11
[Table View] |
Text
g.
~
~..
July 2,1937
'l DISTRIBUTION
/ O -Docket No. 50-412 dDocketdile' <
EP'.?TiG
. V Hr. J. J. Carey, Senior Vice President NRC & Local"PDRs OGC-Dethesda Duquesne Light Cc,npany PDI-4 Reading E. Jordan Nuclear Group S. Varga.
J. Partlow Post Office Box 4 B. Boger ACRS (10)
Shippingport, Pennsylvania 15077 S. Norris
[ Gray File]
Dear Mr'. Carey:
SUBJECT:
BEAVER VALLEY UNIT 2 - GRANTING OF RELIEF FROM CERTAIN REQUIREMENTS OF 10 CFR 50.55a<(TAC:62870;.andL62873) y r
By letter dated April 15, 1987 you submitted the Beaver Valley Power Station Unit No. 2 Inservice Testing (IST) Program and associated relief requests. As we stated in SER Supplement 5, review results of the IST program and relief reauests are erected to be favorable since your submittal reflects discussions held with us in a February 11-12, 1987 meeting. On that basis, pursuant to 10 CFR 50.55a(a)(3) interim relief is hereby granted from the testing requirements as you requested in your submittal, until the end of the first refueling outage, or until a detailed review of the IST program has been completed, whichever comes first.
In addition, we have evaluated the Beaver Valley Power Station Unit No. 2 Preservice Inspection (PSI) Program which you submitted by letter dated December 26, 1985. Our detailed review is documented in Sections 5.2.4.3 and 0.6 of SER Supplement No. 5.
Additional review result will also be documented 1
t in SER Supplement No. 6.
On the basis of the review, and pursuant to d
10 CFR 50.55a(a)(3), relief is hereby granted from the PSI requirements as described in detail in SER Supplement Nos. 5 and 6.
We have detennined that the inspection and testing requirements are impractical for the items for which relief is being granted and, pursuant to 10 CFR 50.55a(g)(6)(i), that the granting of relief is authurized by law, will-not endanger life or property or the common defense and security, and is otherwise in the public interest. In making this determination, we have given due consideration to the burden that could result if those requirements were:
imposed on your facility.
Please feel free to contact your Project Manager, Mr. Peter Tam, if you need any clarification.
Sincerely,
/s/
John F. Stolz, Director Project Directorate I-4 9002150221 870702 Division of Reactor Projects I/II ADOCK0500g2 DR o
'Q LALDI-4, PDI-4 (n-PDI%
3 OG:f ethesda B
SNorris PTam:s )
JSto A y.4%
y f/
7 G 87 6/
87 6/#/87 6/g2/8 8/
hL(
W gg f
p
- T
-Pr. JP J. Carey-Luquesne Light Company.
Beaver Valley ? Power Station cc:
Gerald Charnof f, Esq. -
Mr. R. E. Martin, Manager Jay E.'Silberg, Esq.
Regulatory Affairs
- Shaw, Pittman, Pott; & Trowbridge Duquesne Light Company 2300 N Street, N.W.
Beaver Valley Two Project
' Washington, DC 20037 P. O. Box 328 Shippingport, Pennsylvania 15077 Mr. C. W. Ewingi Quality Assurance Pennsylvania Office of Consumer Advocate
-Manager ATTN: Michael Bardee Quality Assurance Department Duquesne Light Company 1425 Strawberry Square P. O. Box =186 Harrisburg, Penn:;ylvania 17120 Shippingport, Pennsylvania _15077 John D. Burrows
-P.E.
-Director, Pennsylvania Emergency Director of Utilities Management Agency State of Ohio-Room B-151 Public Utilities Comission Transportation & Safety Building-~
Columbus, Ohio 43266-0573 180 East Broad Street Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Bureau of Radiation Protection-
-I Westinghouse Electric Corporation PA Department of Environmental 1
Power Systems Resources P. 0. Box 355 ATTN:
R. J&nati Pittsburgh, Pennsylvania 13230-P.O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. 0. Box 2325' Duquesne Light Company-Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr.:J.'Beall
.U. S..NRC John A. Lee, Esq.
P. 0.:181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 1
301 Grant Street
. Regional Administrator, Region I Pittsburgh, Pennsylvania 15279
- U.S. Nuclear. Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania-19406 i