glVg
'A@
M 2NRC-7-048 (412)643-5200 Beaver Valley No. 2 Unit Project Organization Telecopy (412) 643-5200 Ext.160 QGB" "8
March 12, 1987 x
Shippingport, PA 15077 United States Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555
SUBJECT:
Beaver Valley Power Station Unit No. 2 Docket No. 50-412 PSI Relief Request No. 7 - Piping Welds
REFERENCE:
DLC Letter 2NRC-5-154, dated December 26, 1985 Gentlemen:
As discussed with your staff in a February 4,1981 telecon, attached is relief request number 7 on preservice examination of piping welds that. could not be completed in accordance with ASME Section XI due to inaccessibility.
Attachm?nt 1 gives the applicable code years and addenda, type of examina-tion, basis for relief and the alternative examination. Attachment 2 lists the applicable welds and provides other pertinent information.
It should be noted that a high percentage, 73%, of the total population of welds were inspected at 75% or more of fulI code examination.
The remainder of the relief requests will be submitted in the near future and wiil include the foIlowing:
- 1) A reformatting of relief requests 2 through 6 submitted by the refer-enced letter.
- 2) An additional relief request to be developed after the on-going reat-tor vessel inspection is completed.
Your expeditious review and approval of this relief request would be greatly appreciated.
DUQUESNE LIGHT COMPANY J."J. Carey Senior Vice President cc:
Mr. P. Tam, Project Manager
- w/ attachments Mr. J. Beall, NRC Sr. Resident inspector
- w/ attachments Ms. A. Asars, NRC Resident Inspector
- w/ attachments j
g Dr. Thomas E. Mur ley, NRC Region 1
- w/ attachments J
NRC Document Control Desk
- w/ attachments
'g 1
1 g
8703190442 870312 i
PDR ADOCK 05000412 O
PDR DUQUESNE LIGHT COMPANY BEAVER VALLEY UNIT #2 v
RELIEF' REQUEST #7 Section X1 Edition:
(,
1.
1980 through Winter 1980 Addenda for Class 1 and 2 2.
1983 through Winter 1983 Addenda as guidance for Class 2 Components:
During the preservice examination of piping weld, eighty-three (83) welds were identified where a full code examination could not be completed. The applicabic welds are shown in the attached list.
Examination Requircirants:
1.
Volumetric and Surface:
Table:
IWB-2500-1 Category: B-J ltems: B9.11 & 89.31 2.
Surface Table: 1WB-2500-1 Category: B-J ltems: B9.21 & B9.40 3.
Volumetric or Surface Table: IWB-2500-1 Category: B-K-1 Items: B10.10 4.
Surface Table: IWC-2500-1 Category: C-C ltem: C3.40 5.
Surface and Volumetric Table: IWC-2500-1 Category: C-F-1 Item: C5.ll 6.
Surface and Volumetric Table: IWC-2500-1 Category: C-F-2 Items: C5.51 & C5.52 i
\\
Basis For Relief:
Full code examinations could not be canpleted due to physical impediments.
Section XI figures describing examination requirements do not recognize actual as-built configuratons or metallurgical constraints which interfere with surf ace and volumetric examination, inspections were performed at the maximum percentage practicable as shown in the attached listing.
Alternative Examination:
The required weld volume was examined to the maximum extent practicable.
These welds have been hydrostatically tested per the applicable construc-l tion code.
ATTACHMENT 2 P32 Relief Bequest N9. 7 Page 1 of 7 INCOMPLETE ESTIMATED EXAM
% OF TOTAL ITEM WELD CODE CODE EXAM REPORT EXAM INTERFERING CO.
NO.
ISO /DwG CAT ITEM METHOD NO.
COMPLETED CONDITION 01 2 Mss-035-6-A 100210 C-r-2 C5.51 UT 001 99%
(2) welded branch lines s
02 2 Mss-035 LOS 100210 C-r-2 C5.52 UT 002 85%
welded branch line 03 2 Mss-107-r500 100206 C-r-2 C5.51 UT 003
> 95%
Proximity of Main steam Relief Header on UP stream side and,
integrally attached lifting lug on cap side 04 2 Mss-107-18 100206 C-r-2 C5.51 UT 004
> 95%
Proximity of Main steam Relief Header 05 2 Mss-169-r04 100206 C-r-2 C5.51 UT 006
> 98%
welded Branch Lines i
1 06 2 MSS-1-1Al-A 200201 (Note 1) (Note 1)
UT 007
> 75%
welded clamp and branch line 07 2 Mss-106-r500 100207 C-r-2 C5.51 UT 008
> 95%
Proximity of Main steam Relief Header and integrally attached lifting lug on cap side Oe 2 Mss-106-1B 100207 C-r-2 C5.51 UT 009
) 954 Proximity of Main steam Relief Header 09 2 Mss-170-r02 100207 C-r-2 C5.51 UT 010 99%
welded Branch Line 10 2 Mss-170-r04 100207 C-r-2 C5.51 UT 011
> 98%
welded Branch Lines 11 2 Mss-2-1A-A 200202 (Note 1) (Note 1)
UT 012 83%
welded clamp 12 2M5s-105-r500 100208 C-r-2 C5.51 UT 013
) 95%
Proximity of Main steam Relief Header on UP stream side and integrally attached lifting lug on cap side
PJ1 Golief D qusst Co. 7 Page 2 of 7 INCOMPLETE ESTIMATED EXAM
% OF TOTAL ITEM WELD CODE CODE EXAM REPORT EXAM INTERFERING CO.
NO.
ISO /DwG CAT ITEM METHOD NO.
COMPLETED CONDITION s
13 2 Mss-105-15 100208 C-r-2 C5.51 UT 014
> 95%
Proximity of Main steam ^ Relief Header 14 2 MSS-3-1A-B 200203 (Note 1) (Note 1)
UT 015 65%
welded Attachment
{
15 2sys-015-F13 100217 C-r-2 C5.51 UT 016 95%
welded Branch Line 16 2Svs-014-r11 100217 C-r-2 C5.51 UT 017 95%
welded Branch Line 17 2Svs-012-r08A 100216 C-r-2 C5.51 UT 018 50%
Box Type Restraint 18 2RHs-001-r08 107120 C-r-1 C5.11 UT 019 75%
Configuration is such that parti,a1 coverage (approx.
50%)
can be achieved from the nossle side of the f
weld 19 2RCS-080-r01 110901 8-J 89.11 UT 020 99%
Configuration of pipe to nossle vsid,
I 20 2RCs-107-2r 110908 B-J 89.11 UT 021 80%
Rigid Restraint i
21 2RCS-215-1-C 110907 B-J 89.11 UT 022 80%
Rigid Restraint l
I l
1 l
22 2 sis-271-r503 1107123 8-J 59.11 UT 023 45%
weld-o-let obstruction i
23 2 sis-018-1A-B 110794 C-r-1 C5.11 UT 024 85%
Reducer configuration 24 2 SIS-010-r501 1107129 C-r-1 C5.11 UT 025 83%
Typical Pipe to Tee Configuration l
I 25 2 sis-287-r03 108202 B-J 59.11 UT 026 75%
Configuration allows partial exam (appion. 50%) from the nossle side 26 2' SIS-288-r02 108207 B-J 59.11 UT 027 75%
Configuration allows partial exam
)
(approx 50%) from the nossle side of i
the veld l
I l
___.A_
P21 Colis.f Ec?qusst Co. 7 Page 3 of 7 INCOMPLETE ESTIMATED EIAM
% OF TOTAL ITEM WELD CODE CODE EXAM REPORT EXAM INTERPERING CO.
NO.
ISO /DwG CAT ITEM METHOD NO.
COMPLETED CONDITION 27 2RCS-84-P3 110235 5-J 59.11 UT 028 95%
4 welded Attachment luga 28 2RCS-06-2-2 110227 B-J 59.31 UT 029 50%
Configuration of Pipe to Branch Connection weld 29 2RCS-03-2-2 110226 B-J 59.31 UT 030 50%
Configuration of Pipe to Branch Connection weld
.30 2RCS-09-2-2 110228 B-J 59.31 UT 031 50%
Configuration of Pipe to Branch Connection weld 31 2RCS-01-1A-1 110229 B-J 89.31 UT 032 50%
Pipe to Branch Connection Config.
32 2RCS-01-1A-2 110229 B-J 89.31 UT 032 50%
Pipe to Branch Connection Config.
33 2RCS-03-2-3 110226 5-J 59.31 UT 033 50%
Configuration of Pipe to Branch i
Connection weld 34 2RCS-06-2-3 110227 B-J 89.31 UT 034 50%
configuration of Pipe to Branch Connection weld 35 2RCS-09-2-3 110228 B-J 59.31 UT 035 50%
configuration of Pipe to Branch Connection weld 36 2RCS-07-1-2 110231 5-J 89.31 UT 036 50%
Pipe to Branch Connection Configuration J3 7 2RCS-07-1-1 110231 B-J 59.31 UT 036 50%
Pipe to Branch Connection 4
Configuration 38 2RCS-003-P1 110226 B-2 59.11 UT 037 75%
Rigid Restraint
PSI C011cf Cequest Co. 7 Page 4 of 7 INCOMPLETE ESTIMATED EIAM
% OF TOTAL ITEM WELD CODE CODE EXAM REPORT EIAM INTERFERING 30.
NO.
ISO /DWG CAT ITEM METHOD NO.
COMPLETED CONDITION L
39 2RCS-006-F1 110227 B-J 59.11 UT 038 75%
Rigid Restraint 40 2RCS-009-F1 110228 B-J 59.11 UT 039 75%
Rigid Restraint 41 2RCS-009-F4 110228 B-J 59.11 UT 040 60%
As-cast condition of the 0.D.
on the elbow side 42 2RCS-006-F4 110227 B-J 59.11 UT 041 60%
As-cast condition of the o.D. on tho' elbow side 43 2RCS-003-F4 110226 B-J B9.11 UT 042 60%
As-cast condition of the CD on the elbow side 44 2RCS-1-F3 110229 3 +J 59.11 UT 043 83%
Elbow to valve configuration 45 2RCS-004-F3 110:30 B-J 09.11 UT C44 85%
Elbow to valve configuration 46 2ACS-7-F3 110231 B-J 59.11 UT 045 83%
Elbow to valve configuration 47 2RCS-004-F2 110230 B-J B9.11 UT 046
> 85%
Pipe to valve configuration i
48 2RCS-7-F,2 110231 rJ B9.11 UT 047 85%
Pipe to valve configuration 49 2 R Cs r-2 110229 B-J B9.11 UT 048 85%
Pipe to valve configuration t
50 2RCS-1-F4 110229 B-J 89.11 UT 049 50%
Elbow to nossle configuration 51 2RCS-4-F4 110230 B-J 89.11 UT 050 50%
Elbow to nossle configuration 52 2RCS-7-F4 110231 B-J B9.11 UT 051 50%
Elbow to nousle configuration 53 2RCS-003-F3 110226 B-J 89.11 UT 052 83%
Configuration of pipe to valve veld 54' 2RCS-006-F3 110227 B-J B9.11 UT 053
> 85%
configuration of pipe to valve weld
PSI 121ief Dcqu.3st Co.-7 Attcchment Page 5 of 7 INCOMPLETE ESTIMATED EXAM
% OF TOTAL ITEM WELD CODE CODE EXAM REPORT EXAM INTERFERING C@.
NO.
ISO /DWG CAT ITEM METHOD NO.
COMPLETED CONDITION 55 2RCS-009-F3 110228 B-J 59.11 UT 054 83%
Configuration of pipe to valve veld 56 2RCS-003-F2 11C226 B-J 89.11 UT 055 83%
Configuration of pipe to valve veld 57 2RCS-006-F2 110227 B-J 89.11 UT 056 85%
Configuration of pipe to valve weld 58 2RCS-009-F2 110228 B-J 59.11 UT 057 83%
Configuration of pipe to valve weld 59 2RCS-005-F1 110233 B-J 59.11 UT 058 50%
Elbow to nossle configuration 60 2RCS-002-F1 110232 B-J 59.11 UT 059 50%
Elbow to nossle configuration 61 2RCS-8-F1 110234 B-J 89.11 UT 060 50%
Elbow to nossle configurati'on 62 2RCS-2-F3 110232 B-J 59.11 UT 061 97%
Weld-o-let in scan area 63 2RCS-5-F3 110233 B-J 89.11 UT 062 97%
Weld-o-let in scan area 64 2RCS-08-F3 110234 B-J B9.11 UT 063 97%
Weld-o-let in scan area 65 2RCS-056-2A 107012 B-J B9.21 PT 065 95%
Support plate 66 2RCS-056-F03 107012 B-J 89.40 PT 066 95%
Support plate 67 2 SIS-009-F802 110793 C-C C3.40 PT 068 85%
Bos Bean (part of the support) obstructing all lugs 68 2 SIS-009-F803 110793 C-C C3.40 PT 068 85%
Bos Bean (part of the support) obstructing all lugs 69 25IS-009-F804 110793 C-C C3.40 PT 068 85%
Box Beam (part of the support) obstructing all lugs u
PSI Relief Request No. 7 Page 6 of 7 INCOMPLETE ESTIMATED EZAM
% OF TOTAL ITEM WELD CODE CODE EXAM REPORT EXAM INTERFERING 50.
NO.
ISO /DWG CAT ITEM METHOD NO.
COMPLETED CONDITION l
70 2 SIS-009-r805 110793 C-C C3.40 PT 068 85%
Box Beam (part of the support) obstructing all lugs l
71 2 SIS-009-r806 110793 C-C' C3.40 PT 068 85%
Box Beam (part of the support) obstructing all lugs 72 2 SIS-009-r807 110793 C-C C3.40 PT 068 85%
Box Bean (part of the support) obstructing all lugs 73 2 SIS-009-r808 110793 C-C C3.40 PT 068 85%
Box Beam (part of the support) obstructing all lugs 74 2 SIS-009-r809 110793 C-C C3.40 PT 068 85%
Box Beam (part of the support) obstructing all lugs 75 2CHS-142-118-D 110739 B-J 89.21 PT 074 80%
Box Beam Rigid Restraint 76 2CHS-120-r506 108305 C-C C3.40 PT 075 85%
Box Bean (part of the support) obstructing all lugs 77 2CHS-120-r507 108305 C-C C3.40 PT 075 85%
Box Bean (part of the support) obstructing all lugs 78 2CHS-120-r508 108305 C-C C3.40 PT 075 85%
Box Beam (part of the support) obstructing all lugs 79 2CHS-120-r509 108305 C-C C3.40 PT 075 85%
Box Bean (part of the support) obstructing all lugs 80 2CHS-120-r510 109939 C-C C3.40 PT 078 85%
Box Beam (part of the support) obstructing all lugs
1 i
PJI Colio'f Ecquset Do. 7 Page 7 of 7 4
INCOMPLETE ESTIMATED EXAM
% OF TOTAL ITEM WELD CODE CODE EXAM REPORT EXAM INTERFERING US.
NO.
ISO /DWG CAT ITEM METHOD NO.
COMPLETED CONDITION i.
I 9
81 2 CMS-120-F511 109939 C-C C3.40 PT 078 85%
Box Bean (part of the support) obstructing all lugs 1
82 2CNS-120-F512 109939 C-C C3.40 PT 078 85%
Box Bean (part of the s'upp o rt )
3 obstructing all lugs
[
83 2CNS-120-F513 109939 C-C C3.40 PT 078 85%
Box Bean (part of the support) i obstructing all lugs 4
t CSTE:
1.
Augmented' Inservice Inspection to Protect Against Postulated Piping Failures a
S e
8 l
i 3
O m