Letter Sequence Other |
|---|
|
|
MONTHYEARML20106D2091984-10-19019 October 1984 Requests Approval to Use Portions of Winter 1983 Addenda of ASME Boiler & Pressure Vessel Code,Section XI for Selection & Exam of Class 2 Piping Welds Re Preservice Insp Program Project stage: Request ML20128L6691985-05-20020 May 1985 Forwards Matls Engineering Branch SER Based on Util 850131 Alternative Plan for Preservice Exam of ASME Class 2 Piping. Methodology Acceptable Project stage: Other ML20128H1331985-06-0606 June 1985 Summary of 841212 Meeting W/Util in Bethesda,Md Re Preservice Insp Program.Meeting Notice,Agenda,Summary of Major Topics & Preliminary Preservice Insp Program Encl Project stage: Meeting ML20151N7281985-12-26026 December 1985 Forwards Preservice Insp Program,Including NDE Ultrasonic Exam of Vessels & Piping,Bolting Exam & Class 2 Piping Exam Criteria.Approval of Program & Closing of SER Open Items Requested by 860301.W/o Program Project stage: Other ML20205M6561986-04-0909 April 1986 Forwards Rev 2 to Chapter 3.7 of ASME Section XI Pump & Valve Administrative Procedure & Rev 0 to Inservice Testing Plan for Pumps & Valves. Comments & Confirmatory Status on SER Open Item Requested by 860701 Project stage: Other ML20214P9391986-11-26026 November 1986 Forwards Request for Addl Info on Inservice Testing Program, SER Open Issue 1(b) & Associated Relief Requests,Submitted on 860409.Meeting Should Be Arranged W/Nrc Prior to Preparing Written Response Project stage: RAI ML20212H2931987-01-13013 January 1987 Confirms Resolution Arising from Dec 1986 Telcons That Requirements for Preservice Insp of Reactor Vessel Nozzle Inside Radius Section Volumetric Exam Can Be Met Using Ultrasonic Methods.Relief Request 1 in Withdrawn Project stage: Request ML20212M2491987-01-23023 January 1987 Discusses SER Open Item (4)(a) Re Preservice Insp Program. Selection of Specific Supports for Exam from Among Support Candidates Would Be Done Utilizing Enhanced Multiple Streamling Technique Per Iwb & Iwc Project stage: Other ML20207S1361987-03-11011 March 1987 Summary of 870211,12 & 24 Meetings W/Util Re Inservice Testing & Safe & Alternate Shutdown Capability,Per SER Open Issues 1b & 5.List of Meeting Attendees Encl Project stage: Meeting ML20207S4331987-03-12012 March 1987 Forwards Relief Request 7 Re Preservice Exam of Piping Welds That Could Not Be Completed in Accordance W/Asme Section XI Due to Inaccessibility.High Percentage (73%) of Total Weld Population Inspected at 75% or More of Full Code Exam Project stage: Request ML20215H4671987-04-13013 April 1987 Discusses Application of Const Visual Exam Results for Safety Class 3 Support Integrally Welded Attachments to Satisfy ASME Section XI Preservice Exam Requirements Project stage: Other ML20215H3711987-04-15015 April 1987 Forwards Rev 1 to Inservice Testing Plan for Pumps & Valves, Per SER Open Item 1(b).Plan Reflects Agreements W/ Nrc,Eg&G & Util Representatives During 870211 & 12 Working Meetings.Info Should Be Sufficient to Close Out SER Item Project stage: Meeting ML20006D8961987-07-0202 July 1987 Grants Interim Relief from Certain Testing Requirements of 10CFR50.55a Re Inservice Testing Program Until End of First Refueling Outage or Until Detailed Review of Program Completed Project stage: Approval ML20148K5161988-03-18018 March 1988 Forwards SER Supporting Util Inservice Testing Program for Pumps & Valves for 871117-971117 & Request for Relief from Certain Testing Requirements Project stage: Approval ML20196C3061988-06-20020 June 1988 Provides History Leading to & Justification for Deleting Pumps Control Room Refrigeration Pumps from Rev 2 to Inservice Testing Program Project stage: Other 1987-01-23
[Table View] |
Text
'Af Duquesne Lidit 2g,eg3; Nuclear Construe lion Dms.on Telecopy
$t$u$sh) *i((N" ' "'
April 9, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. Peter Tam, Project Manager DivisMn of PWR Licensing - A Office of Nuclear Reactor Regulation S UBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 SER Open Items (1) and (4)
REFERENCE:
1.) BVPS-2 Safety Evaluation Report, NUREG-1057, October 1975 2.) DLC Letter 2NRC-5-154, dated December 26, 1985 3.) NRC Letter to DLC, dated January 24,1986 Gentlemen:
The Preservice Testing and Inservice Testing Programs for pumps and valves are the subjects of Safety Evaluation Report (SER) open item (1),
Reference 1.
The Preservice Testing Program was submitted by Reference 2.
This letter transmits the "early" BVPS-2 initial,10 year interval, Inservice Testing (IST) Program for pumps and valves.
The transmittal incl udes:
- 1. )
ASME Section XI Pump and Valve Administrative Procedure, Chapter 3.7, Revision 2.
2.)
Inservice Testing Plan for Pumps and Valves, Revison 0 (including relief requests).
It should be noted that although the identified ASME XI Code /Edi-tion is 1980 through winter 1980 Addenda in the Administrative Procedure, the 83 summer 83 is identified in the IST Pl an.
The final submittal will incorporate a later Code / Edition update in accordance with 10CFR 50.55 a (g)(i).
The final IST submittal is scheduled for approximately six months prior to fuel load. The changes between this "early" submittal and the final submittal are expected to be minor.
8604150340 860409 gDR ADOCK0500g2 l
l United States Nuclear Regulatory Commission Mr. Peter Tam, Project Manager SER Open Items (1) and(4)
Page 2 This "early" submittal is being made to facilitiate NRR Staff review.
Comments on the program and a confirmatory status on SER open item (1) are requested by July 1,1986. Resolved comments will be incorporated in the final submittal.
The Preservice Inspection (PS I) and Inservice Inspection (IS I)
Programs are the subjects of SER Open Item (4), Reference 1.
The Preservice Inspection Program was submitted by Reference 2.
Reference 3 states that the NRR Staff review of the PSI program will be completed early this summer.
Comments on the program and a confirmatory status on the PSI part of SER open item (4) are requested by July 1,1986. Resolved comments on the PSI Program l
will be appropriately incorporated in the ISI Program submittal.
DUQUESNE LIGHT COMPANY By
,/'
Vi ent JJS/jdw NR/SER/LTR tachment AR NAR Mr. P. Tam, Project Manager (w/a)
Mr. J. M. Taylor, Director (3) (w/a)
Mr. W. Troskoski, Sr. Resident Inspector (w/a) l Mr. G. Walton, NRC Resident Inspector (w/a)
INP0 Records Center (w/a) l NRC Document Control Desk (w/a) 0F 198 N
M@
$NERAU. FAT 1001 n0TAE P SHIPPillGPORT 0000, BEAVtt C09Eff NY CONNIS$10ft EXPitts OllT. 23,1900 Wester, Ptnesykanla Asaxiation sf Motories l