Forwards Rev 2 to Chapter 3.7 of ASME Section XI Pump & Valve Administrative Procedure & Rev 0 to Inservice Testing Plan for Pumps & Valves. Comments & Confirmatory Status on SER Open Item Requested by 860701
ML20205M656
Person / Time
Site: Beaver Valley
Issue date: 04/09/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Harold Denton, Tam P
Office of Nuclear Reactor Regulation
Shared Package
ML20205M658 List:
References
2NRC-6-034, 2NRC-6-34, TAC-62870, NUDOCS 8604150340
Download: ML20205M656 (2)


Text

'Af Duquesne Lidit 2g,eg3; Nuclear Construe lion Dms.on Telecopy

$t$u$sh) *i((N" ' "'

April 9, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. Peter Tam, Project Manager DivisMn of PWR Licensing - A Office of Nuclear Reactor Regulation S UBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 SER Open Items (1) and (4)

REFERENCE:

1.) BVPS-2 Safety Evaluation Report, NUREG-1057, October 1975 2.) DLC Letter 2NRC-5-154, dated December 26, 1985 3.) NRC Letter to DLC, dated January 24,1986 Gentlemen:

The Preservice Testing and Inservice Testing Programs for pumps and valves are the subjects of Safety Evaluation Report (SER) open item (1),

Reference 1.

The Preservice Testing Program was submitted by Reference 2.

This letter transmits the "early" BVPS-2 initial,10 year interval, Inservice Testing (IST) Program for pumps and valves.

The transmittal incl udes:

1. )

ASME Section XI Pump and Valve Administrative Procedure, Chapter 3.7, Revision 2.

2.)

Inservice Testing Plan for Pumps and Valves, Revison 0 (including relief requests).

It should be noted that although the identified ASME XI Code /Edi-tion is 1980 through winter 1980 Addenda in the Administrative Procedure, the 83 summer 83 is identified in the IST Pl an.

The final submittal will incorporate a later Code / Edition update in accordance with 10CFR 50.55 a (g)(i).

The final IST submittal is scheduled for approximately six months prior to fuel load. The changes between this "early" submittal and the final submittal are expected to be minor.

8604150340 860409 gDR ADOCK0500g2 l

l United States Nuclear Regulatory Commission Mr. Peter Tam, Project Manager SER Open Items (1) and(4)

Page 2 This "early" submittal is being made to facilitiate NRR Staff review.

Comments on the program and a confirmatory status on SER open item (1) are requested by July 1,1986. Resolved comments will be incorporated in the final submittal.

The Preservice Inspection (PS I) and Inservice Inspection (IS I)

Programs are the subjects of SER Open Item (4), Reference 1.

The Preservice Inspection Program was submitted by Reference 2.

Reference 3 states that the NRR Staff review of the PSI program will be completed early this summer.

Comments on the program and a confirmatory status on the PSI part of SER open item (4) are requested by July 1,1986. Resolved comments on the PSI Program l

will be appropriately incorporated in the ISI Program submittal.

DUQUESNE LIGHT COMPANY By

,/'

Vi ent JJS/jdw NR/SER/LTR tachment AR NAR Mr. P. Tam, Project Manager (w/a)

Mr. J. M. Taylor, Director (3) (w/a)

Mr. W. Troskoski, Sr. Resident Inspector (w/a) l Mr. G. Walton, NRC Resident Inspector (w/a)

INP0 Records Center (w/a) l NRC Document Control Desk (w/a) 0F 198 N

M@

$NERAU. FAT 1001 n0TAE P SHIPPillGPORT 0000, BEAVtt C09Eff NY CONNIS$10ft EXPitts OllT. 23,1900 Wester, Ptnesykanla Asaxiation sf Motories l

4