MONTHYEARML20106D2091984-10-19019 October 1984 Requests Approval to Use Portions of Winter 1983 Addenda of ASME Boiler & Pressure Vessel Code,Section XI for Selection & Exam of Class 2 Piping Welds Re Preservice Insp Program Project stage: Request ML20128L6691985-05-20020 May 1985 Forwards Matls Engineering Branch SER Based on Util 850131 Alternative Plan for Preservice Exam of ASME Class 2 Piping. Methodology Acceptable Project stage: Other ML20128H1331985-06-0606 June 1985 Summary of 841212 Meeting W/Util in Bethesda,Md Re Preservice Insp Program.Meeting Notice,Agenda,Summary of Major Topics & Preliminary Preservice Insp Program Encl Project stage: Meeting ML20151N7281985-12-26026 December 1985 Forwards Preservice Insp Program,Including NDE Ultrasonic Exam of Vessels & Piping,Bolting Exam & Class 2 Piping Exam Criteria.Approval of Program & Closing of SER Open Items Requested by 860301.W/o Program Project stage: Other ML20205M6561986-04-0909 April 1986 Forwards Rev 2 to Chapter 3.7 of ASME Section XI Pump & Valve Administrative Procedure & Rev 0 to Inservice Testing Plan for Pumps & Valves. Comments & Confirmatory Status on SER Open Item Requested by 860701 Project stage: Other ML20214P9391986-11-26026 November 1986 Forwards Request for Addl Info on Inservice Testing Program, SER Open Issue 1(b) & Associated Relief Requests,Submitted on 860409.Meeting Should Be Arranged W/Nrc Prior to Preparing Written Response Project stage: RAI ML20212H2931987-01-13013 January 1987 Confirms Resolution Arising from Dec 1986 Telcons That Requirements for Preservice Insp of Reactor Vessel Nozzle Inside Radius Section Volumetric Exam Can Be Met Using Ultrasonic Methods.Relief Request 1 in Withdrawn Project stage: Request ML20212M2491987-01-23023 January 1987 Discusses SER Open Item (4)(a) Re Preservice Insp Program. Selection of Specific Supports for Exam from Among Support Candidates Would Be Done Utilizing Enhanced Multiple Streamling Technique Per Iwb & Iwc Project stage: Other ML20207S1361987-03-11011 March 1987 Summary of 870211,12 & 24 Meetings W/Util Re Inservice Testing & Safe & Alternate Shutdown Capability,Per SER Open Issues 1b & 5.List of Meeting Attendees Encl Project stage: Meeting ML20207S4331987-03-12012 March 1987 Forwards Relief Request 7 Re Preservice Exam of Piping Welds That Could Not Be Completed in Accordance W/Asme Section XI Due to Inaccessibility.High Percentage (73%) of Total Weld Population Inspected at 75% or More of Full Code Exam Project stage: Request ML20215H4671987-04-13013 April 1987 Discusses Application of Const Visual Exam Results for Safety Class 3 Support Integrally Welded Attachments to Satisfy ASME Section XI Preservice Exam Requirements Project stage: Other ML20215H3711987-04-15015 April 1987 Forwards Rev 1 to Inservice Testing Plan for Pumps & Valves, Per SER Open Item 1(b).Plan Reflects Agreements W/ Nrc,Eg&G & Util Representatives During 870211 & 12 Working Meetings.Info Should Be Sufficient to Close Out SER Item Project stage: Meeting ML20006D8961987-07-0202 July 1987 Grants Interim Relief from Certain Testing Requirements of 10CFR50.55a Re Inservice Testing Program Until End of First Refueling Outage or Until Detailed Review of Program Completed Project stage: Approval ML20148K5161988-03-18018 March 1988 Forwards SER Supporting Util Inservice Testing Program for Pumps & Valves for 871117-971117 & Request for Relief from Certain Testing Requirements Project stage: Approval ML20196C3061988-06-20020 June 1988 Provides History Leading to & Justification for Deleting Pumps Control Room Refrigeration Pumps from Rev 2 to Inservice Testing Program Project stage: Other 1987-01-23
[Table View] |
Text
EA
~96 M
2NRC-7-084 Beaver Valley No. 2 Unit Project Organization Telecopy 2
3-2 Ext.160 S.E.G. Buildmg P.O. Box 328 April 15, 1987 Shippingport, P A 15077 United States Nuclear Regulatory Commission ATIN:
Document Control Desk Washington, DC 20S55
SUBJECT:
Beaver Valley Power Station Unit No. 2 Docket No. 50-412 Inservice Testing Progran-Pumps & Valves, SER Open Iten,1(b)
Gentlemen:
Please find attached a copy of the Beaver Valley Power Station Unit No. 2 Inservice Testing (IST) Progran. This progran reflects agreunents reached with the NRC Staff, EG&G Idaho NRC Consultants, and Duquesne Light Company (DLC) representatives in a working meeting on Febraury 11 and 12,1987.
This pr ogr an has been reviewed and approved by the DLC Onsite Safety Committee and the Superintendant, Operations.
Upon your finding the IST Progran acceptable, Safety Evaluation Report Open item 1(b) should be closed.
If we can provide any further assistance, please let us know.
DUQUESNE LIGHT COMPANY By r/
v J.N. Carey Senior Vice President JJS/ijr NR/JJS/lST Attachment AR/NAR cc:
Mr. P. Tam, Project Manager
- w/ attachment Mr. H. C. Rockhold, LG&G Idaho
- w/ attachment Dr. T. E. Mur ley, NRC Region 1 Administrator
- w/o/ attachment Mr. J. Beall, NRC Sr. Resident inspector
- w/o/attachnent INPU Records Center
- w/o/ attachment 8704200294 070415 A0d P,DR ADOCK 03000412
(" \\ \\
E PDR
United States Nuclear Regulatory Commission Inservice Testing Progran, SER Open Iten, (b)
Page 2 COMMUNWEALTH OF PENNSYLVANIA )
COUNTY OF BEAVER
)
On this /[d/ day of
//>
/(([, before me, a Notary Public in and for said Co(monwealth and County, personally appeared J.
J. Carey, who being duly sworn, deposed and said that (t) he is Senior Vice P esident of Duquesne ligtit, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statenents set forth in the Submittal are true and correct to the best of his knowledge.
O h)-
u.LQ-L.D c
Notary Public satu s. 7Anoet.ncTAsi neoc selPMANET 0000.NAvtt COUNTY 37 C085180005 spite 1 GCT. 22.1989 inchw. Pomed we d **"*
- LTI55E
- 2! ;;"Jr7 Beaver Valley Power Station Unit 2 INSERVICE TESTING PLAN FOR Pt, PS AND VALVES H
APPROVAL SHEET Unit Nuclear Oper. Supvr.
OSC Approval Rev.
Review Review Effective No.
Pages Issued Initial /Date Date Signature Date Date Y[/7[f7 I
l-144
%/
'/ 4/9/87 4 g, p
4 j
i I
i l
..,__-..__~._m-__,-.,._.w.
,,,,..,en,.m-r---we=+-*,r<v-C'-
-e* * * - - -m-~
DUQUESNE LIGHT COMPANY Beaver Valley Power Station Unit 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES APPROVAL SHEET I
PRC Approval Rev.
Pages Issued Review Effective No.
Date Signature Date Date 0
1-143 1/17/86 fv A
N OS OR EVIEW MEIETING NUMBER & o 3//8/f7 PLANT MANAGER APPROVAL
. 6NM ATE I'&f7
(
~-