, _ --_.-_-__ - -_ _ - -

James A.FitsPettlek '

  • 3 .

+ - *.. Nuclear Power Mont

  • .' P.o. Box 41

. . ., Lycoming. New York 13093

.315 342-3640 ?

(.

William Femandez 11 Resident Manager January 12', 1990 JAFP-90-0032

-Director, Office of Inspection and Enforcement

.U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: DOCUMENT CONTROL DESK

SUBJECT:

OPERATING STATUS-REPORT

Reference:

DOCKET-NO. 50-333

Dear Sir:

Enclosed please find the James A. FitzPatrick Nuclear Power Plant Operating Status Report for the' month -

of December, 1989.

'i If there are any questions concerning this report, please contact John Cook at (315) 349-6569. i i

3 WILLIAM FE<NANDEZ l ENCLOSU ES Q%t WF:JPC:

cc: JAF Department Heads WPO o DCC 4 1

i i

I g ;4/

'\ l hk A P c.

8 4

a J

NEW YORK POWER ?.Un10RITY K ~

+.

..- JAMES A.- FITZPATRICK NUCLEAR POWER FIANT  :;

OPERATING DATA REPORT DOCITT NO: '50-333 UNIT NAME FITZPATRICKJ l DATE - January, '1990 1 COMPLETED BY JOHN COOK TELEPHONE (315) 349-6569

.. OPERATING STA'IUS l, UNII' NAME:- FITZPATRICK NOTES

  • 1 f L

-2. REPORTING n.KIOD: 891201-- 891231  ;

3. LICENSED THERMAL POWER OWT): 2436 ,
4.

NAMEPLATE RATING (GROSS MWE): 883  :

-5. DESIGN ELECTRICAL RATING'(NET MWE): 816 i

. 6. - MAXIMLM DEIC OABLE CAPACITY (GROSS MWE): .~ 785

7. MAXIMLN DEPENDABLE CAPACITY (NET MWE):= 757-

- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 ' 7)" SINCE IAST REPORT,. GIVE. REASONS:: ,

1

9. POWER LEVEL 'IO WHIQi RESTRICTED,'IF ANY (NET MWE): j
10. REASONS E R RESTRICTIONS, IF ANY: ..;

]

THIS FONni YR 'IO-DATE CLEUIATIVE '!

11. HOURS IN REPORTING PERIOD. 744 8760- 126505
12. NtMBER OF HOURS REACIOR WAS CRITICAL. 744 8086.8 93800.1  :
13. RFACICR RESERVE SHUIDOWN IDURS. 0 0 0- *
14. IOURS GENERA'IOR'ON-LINE. 744 7946.1 -91145.3-L 15. UNIT RESERVE SHUIDOWN HOURS. 0 0 0
16. GROSS THERMAL ENERGY GENERATED (MWH). 1809600 -18763680 199360924
17. GROSS ELECTRICAL ENERGY GENERATED (MWH). 613550 63/3290 68057850 L 18. NET ELECTRICAL ENERGY GENERATED-(MWH). 591470 6155345 65290690 l 19. UNIT SERVICE FACIOR. 100% 90.7% 72%

l 20. UNIT AVAILABILITY FACIOR. __

100% 90.7I 72I

21. UNIT CAPACITY FACIOR (USING MDC NET).- 105% - 92.8% 66.5%
22. UNIT CAPACITY FACIOR (USING DER NET). 97.4% 86.1% 63.2%
23. UNIT E RCED' OUTAGE RATE. 0 3.5- -10.3
24. SHUIDOWNS SCHEDULED OVER NEXT 610NTHS (TYPE, DATE AND DURATION OF EACH): [

REFUEL OUTAGE SCHEDULED M R MARCH 31,1990, 'IO IAST APPROXIMATELY 50 DAYS. .

25. IF SHUR DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

' 26. UNITS IN TEST STATUS (PRIOR 'IO C0bEERCIAL OPERATION): MRECAST ACHIEVED INITIAL CRITICAI.,ITY INITIAL ELECTRICITY COMMERCIAL OPERATION

+

NEW YORK POWER AUTHORITY:

-.*  : JAMES A. FITZPATRICK NUCLEARDPOWER PLANT

AVERAGE-DAILY UNIT POWER LEVEL-DOCKET NO: 50-333 UNIT: FITZPATRICK DATE: -January, 1990 00MPLETED BY: J0h3 000K TELEPHONE: (315)349-6569 10 NIM: DECDIBER 1989

. DAY; AVERAGE DAILY POWER LEVEL DAY .-- AVERAGE DAILY IWER LEVEL IWe NET -}Me NET 1- 792'- 17- 796-2 796' 18 796 3 795 19 795

4. 794' 795 ,-

5 790- 21 793 6 '795- 22 795 7 793- 23 795 8 795' 24' 794 9 795 25 795 l I

t 10 793 ' 795 11 791 27 -795 12 793 .28 795- y I

13 795 29 '794 i

14 795 '

30 795 15 798 31 795 1 16 795 i

.y Sat %RY: THE FITZPATRICK PLANT OPERATED AT NEAR FULL THERMAL POWER THIS ENTIRE -

REPORTING PERIOD.  :!

1 j

DOCKET NO:-50-333; -#-

NEW 1THE POWER AUDDRIIY JAMES A. FITZPATRICK NUCLEAR POWER FIANr UNIT NAME: FITZPATRICK4 A UNIT SHUTDOWNS Ruuu MTE: January, .-1990 - *'

OWPIZIED BY: JOHN 000K .

KEEuu IONIH: DECDGER 1989 TELEPHONE: .(315)349-5569.

D- C UH R MEIHOD S 'O R0 E OF YC .M C .CAUSE AND CORRECTIVE ACTION-AU A SHUITING LICENSEE S0 PO 10 NO. DAIE TYPE TR S DOWN EVENT TD 0D PREVENT RECURRENCE

.I S 0 THE Kuun EE NE O .N REACIOR M E N N-T NONE N

3 '4 .

1 2 MEIHOD: EXHIBIT G.- INSTRUCTIONS

- F: FORCED REASON:

, ~

1-MANUAL iEUR PREPARATION OF MTA S: SCHEDULED A. EQUIPMENT FAILURE (EXPIAIN)- ENIRY SHEETS EUR LICENSEE

. B. MAINIENANCE OR TEST 2-PANUAL SCRAM AUI0MATIC; SCRAM EVENT REPOKr:(LER) FILE C. REFUELING -

00NTINUED' (NURZG-0161)

D.~ REGULATORY RESIRICTION E. OPERATOR TRAINING AND LICEtEE EXAMINATION 5-REDUCED IDAD ,

F. ADMINISTRATIVE 9-0IHER l

G. OPERATIONAL ERROR-(EXPIAIN)

H. ODIER (EXPIAIt0..

v h y" 3

T N, ~

q - - ~a N~,-.,y-'~

  • y -, - - +n~ 4 < -~.m<, ,.

>..&- v <-crw m..~m.-~ e w, ,,.- A r . ms e.g- ww. m-

g- 79-

+ E .~ ,

e

., i

~

NEW YORK POWER AUTHORITY-i JAMES A. FTIZPATRICK' NUCLEAR' POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH OF: DECEMBER-1989 ,

The FitzPatrick plant operated 'at near full thermal power l l this' entire' reporting period.1 The major: safetyirelated i maintenance for the month was:  ;

1.- Performed scheduled safety related surveillance testing,

2. Performed sheeduled safety related instrument calibrations, and
3. Performed thermal. performance testing 2of safety .'

related area unit coolers.