ML19350E522

From kanterella
Jump to navigation Jump to search
Revised Page to Monthly Operating Rept for May 1981, Correcting Code in Reason Column for Last Date Entry from a to B
ML19350E522
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/15/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML19350E519 List:
References
NUDOCS 8106230224
Download: ML19350E522 (1)


Text

'

Rovimien 1 - 6/15/81 s

[ . ,

y .

v -

y DOCKET NO. 50-346 -}

UNIT SHUTDOWNS AND POWNt REDUCTIONS Davie-Be'~s' Unit 1 '

o UNIT NAME h, is ioni O DATE ,

COMPLETED BY Bilal shrkour .

REPORT MON 111 May, 1981 m 9) ?s9-sn00, Ext.

TELEPIIONE . '

'251-

~

$ c

.2 e ee E

% .a -.

ES LIC'"5 ".

E*

"* C:use & Corrective +

No.

Date g 3g ij j2gy Event 3?

N0

$" Action to

  • [3

~

$ j5g Repori* y Prevent Recurrence 6

8 81 05 02 S 0 A NA NA NA NA Reactor power was reduced to approxi-mately 10% to repair FT RCIA1 (reactor coolant flow transmitter).

9 81 05 09 S 0 A NA NA NA NA Reactor power was reduced to approxi-mately 95% due to seal problems on Reactor Coolant Pump 2-1. *

(

10 81 05 12 S 0 A NA NA NA NA Reactor power was reduced to 75% to take Reactor Coolant Pump 2-1 off.

1 11 81 05 12 F 23.8 B NA NP-33-81-32 CB PUMPXX Th,e reactor tripped due to Reactor Coolant Pump 2-2 trip whleh was caused ~

by a protective relay being replaced on Reactor Coolant Pump 2-2 breaker (see Operational Summary for.further deta.ils).

I 2 3 -

4 F: Forced Reason: Method: Exhibit G. Instructions A Etiuipment Failure (Explain) 1-Manual for Preparation of Data S: Schedu!cd B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C.Rcfueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 40thm(Explaki4 0161) li-Operator Training & License Examination 4-Continuation F Administ ative 5-Reduction 5 '

G-Operational Le ror (lixplain) Exhibit ! Same Source 6-Other (9/77) Il-Os her ( Explain)

' ' - - ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ * ~ ~ *

'__ 1_____

C 1_ _ _ _ _ _: n _ _ _ _

~

__1