ML19350E518
| ML19350E518 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/15/1981 |
| From: | Murray T TOLEDO EDISON CO. |
| To: | Stello V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19350E519 | List: |
| References | |
| L81-453, NUDOCS 8106230219 | |
| Download: ML19350E518 (1) | |
Text
,
l.
e c.
T Z_J TOLEDO r
e EDISON L81-453 June 15, 1981 FILE: RR 2 (P-6-81-05)
Docket No. 50-346 License No. NPF-3 Mr.' Victor Stello,'Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr,
. Secllo:
Enclosed are ten copies of the Unit Shutdowns and Power Reductions page of the Monthly Operating Report for Davis-Besse Nuclear Power Station for the month of This page has been revised to correct the code in the " reason" column May, 1981.
for the last date entry from a code "A" to a code "B".
Please destroy your previous copies of this page and replace with the attached revision.
Yours truly,
/% DM Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/ljk Enclosures cc: Mr. Norman Haller, Director Office of Management Program Analysis Enc 1: 2 copies Mr. Luis Reyes NRC Resident Inspector Encl:
1 copy 810023o#/7 g
THE TOLEDO EDISON COMPANY
_ EDISON PLAZA 300 MADISON AVENUE TOLEOO. OHIO 43652
--