LER 88-018-01:on 880511,main Control Room Ventilation Sys Isolated Due to Channel C High Chlorine Concentration Signal.Probably Caused by Rainwater Coming in Contact W/ Chlorine Analyzer Probe.Isolation reset.W/891031 Ltr
ML19325E828
Person / Time
Site: Limerick Constellation icon.png
Issue date: 10/31/1988
From: Endriss C, Mccormick M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-88-018, LER-88-18, NUDOCS 8911090098
Download: ML19325E828 (5)


Text

-

m, *

10 CRP 50.73 t PHILADELPHIA ELECTRIC COMPANY LIMERICM OENER ATING ST ATION ,

P. O. BOX A S AN A'f 00 A. PENNSY LV ANI A 19464 (216) 8271200 e st. 2000

"~^".....

.c....Jf.,""7.'.i.7".."...' .....

October 31 , 1989 Docket No. 50-352 Document Control Desk  ;

U.S. Nuclear Regulatory Commission f/ Washington, DC 20555 U

SUBJECT:

Licensee Event Report '

Limerick Generating Station - Unit 1 This LER was reports an automatic actuation ot' the Control ,

Room Emergancy Presh Air Supply (CRETAS) system, an Engineering i Safety Feature, resulting from a chlorine concentration signal r believed to be caused by rainwater contacting a chlorine analyzer t probe. ,

Reference:

Docket No. 50-352 '

Report Number: 1-88-018 Revision Number: 01 r Event Date: May 11, 1988 l Report Date: October 31, 1989 Facility: Limerick Generating Station P.O. Box A, Sanatoga, PA 19464 This revised LER is being submitted due to the completion of the modification committed to in the original LER. The original LER was submitted pursuant to the requirements of 10 CFR 50.73(a)(2)(iv). Changes in the revised LER are indicated by revision bar markers in the right hand margin.

Ver ,

t r ulyj y,]qurn s< ,

d it f Let#

JKP:sc V

cca W. T. Russell, Administrator, Region I, USNRC T. J. Kenny, USNRC Senior Resident Inspector 8911090098 881031 PDR ADOCK 05000352 S PDC

(

l

'g

. m. vs..m s.ni m ee., ~ .n.

C >*eovIe Que me.Psapes

{

(

UCENSEE EVENT REPORT (LER) ta a* t a. orum

. r

. .un .m ca aav . ... m ..c. a.

Limerick Generating Station. Unit 1 o , g , o , , , , , 3 , $, 2, i g , t, ,

Control Room HVAC Isolation Resulting f rom a High Chlorine concentration Signal caused by rainwater contecting an analvrer Probe n ..n ..n m u . .v . . ... I sinea, o.n m i tv i. ..ciutin i=v06vio m

.v. o., , s.. I es . u "ti;;'" . " ?.?: -oava o.' ***a noun ...u ooca rt =v-n..

. oisso39,o , ;

1l 1 88 0l $ 8l 8 0l 1l 8 0l1 1{0}j1Bj8 ,,,,,,,,,, , ,

,,,,,,,,,, v.... ., svo..nioev.wa=vteti=tovei.im e.i.Ceao,cw ., ., ,nu 006 W ye. 831H 29 0li.,

u.?46.H3Heu

_ { FtJHH M u.imm .

w.=wm u.ni. a n.i t tn ...

nos l l M .866.Hmal W.30..W M M6.H3H I s

_ _ _ d,.

, u. um. n n.,, u.n,. ana u.n,. m,a na, uu,

, N'[. ,

, #0 80teH1He.) HJ36.H318M MJ36.H3H.4HSi s ;V. , re .ao.in ne i monannuai u ni.n:He 4tCth88 8 (Chf.CT .ca taig kla titi m..*8 f449.=0mtsewwega Carl R. Endriss, Regulatory Engineer, Limerick Generating Station ....c:c.

2,15 3 2 7, ,1,2, 0,0 COnaattit Okt teht .08 S&CM CD.a 0mtaf .48kval crx.isID in Tuts e t. car nai Cav84 878,8w CCW.Chihi g ' E' g en C &h'8 8 35 8?t w CD* 0804? * *[d .C e at gg p [ \s ua.c < w

  • s .. p .y i , i , i , i 4Y v , , , , , , , '

3.g.m :A i i i i i i s

' ' f^r; J

i i i i i i w~Lm .'2' sv.atswintat es oat ca.te so n.i .,e,,,,,g ,,, g ,g., ,

""U

~ )vis,,e v., sesretto ave.,im e= e4rai "K no j , 9

. .,n .ev ,5 . u . . . .-. , . ., . . -- n . .

On May 11, 1988 at 1448 hours0.0168 days <br />0.402 hours <br />0.00239 weeks <br />5.50964e-4 months <br />, the main control room ventilation system isolated due to a 'C' channel high. chlorine concentration signal. The 'A' train of the Control Room Emergency Presh Air Supply (CREFAS) system, an Engineered Safety Feature, initiated as designed. The event occurred during rainy and windy weather conditions and the high chlorine concentration signal is believed to have been caused by rainwater coming in contact with the chlorine analyzer probe resulting in a chemical imbalance in the probe's electrolyte. The analyzer probes are located close to the outside air intake plenum. Atter the 'C' channe) chlorine indicator spiked, the control room operators implemented Special Event Procedure SE-2 (Toxic Gas Procedure). A channel check of the 'A', 'B' and 'D' chlorine detectors was performed by Operations personnel and verified to be normal. Following the spike all chlorine channels indicated normal levels (less than l 0.1 ppm). The isolation was reset at 1552 hours0.018 days <br />0.431 hours <br />0.00257 weeks <br />5.90536e-4 months <br />. The duration j of the Control Room isolation was 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 4 minutes. There was no l chlorine intake to the control room. There was no release of radioactive material to the environment as a result of this event. A modification to move the chlorine detector probes was implemented by August 28, 1988 to mitigate false, environmentally related, automatic control room ventilation system isolations. A second modification to change the chlorine detection system logic from a "one-out-of-one-once" to a "two-out-of-two-once"~

configuration was completed on September 7, 1989.

ge, ... ..

y  ;

g .... *

. wea.ui u o2, ee.~o. .

tlCENSEE EVENT REPORT (LER) TEXT CONTINUATION amono ove =o s's++9 emes av es

. .c s.,, ..J n. - i ' *-" a a ' - u a ,mia i.. *

  • o i < >.

l

.... f. 'nt.;; t- :w.t:

Li2nerick cenerating Station, Unit 1 V mw o o 1510101013l 512 81 8 -

0l118 -

011 0l2 o' 0 l4 l

. .a ~ c o-.au w en l

l Unit Conditions Prior to the Eventt l l

(

Operating Mode 1 (Power Operation) '

Reactor Power 90% ,

i Description of the Event:

On May 11, 1988 at 1448 hours0.0168 days <br />0.402 hours <br />0.00239 weeks <br />5.50964e-4 months <br />, the main control room ventilation system isolated due to a 'C' channel high chlorine concentration signal.

The 'A' train of the Control Room Emergency Presh Air Supply (CREFAS) system, an Engineered Safety Feature, started an designed when the 'C' channel chlorine analyzer spiked to approximately 0.50 ppm for approximately 60 seconds. After the isolation control room operators implemented Special Event Procedure SE-2 (Toxic Gas Procedure). A channel check of the

'A', 'B' and 'D' chlorine detectors was performed by Operations l personnel and verified to be normal. Instrumentation and Controls (If,C) was notified to inspect the chlorine detection I

system to determine the cause of the isolation signal. The isolation was reset and normal control room ventilation was restored by 1552 hours0.018 days <br />0.431 hours <br />0.00257 weeks <br />5.90536e-4 months <br />. The duration of the control Room j isolation was I hour and 4 minutes.

l l Consequences of the Event:

Normal control room ventilation system tripped and isolated. The

'A' train of the CREFAS responded as designed. The 'B' train of the CREFAS was in standby and available for operation. There was no chlorine intake to the main control room. If actual chlorine L was detected, the chlorine detection system was available and would have responded as designed. There was no release of l

radioactive material to the environment as a result of this event. '

l l

l re,'** *"'"

-- -- . . - - . _ ... - - -. - D

vi sc.i m o e r.,eoww,u.o=

.e ,- m

  • 4*aovio eve we mo

", UCENSEE EVENT REPORT (LER) TEXT CCNTINUATION n,cis iv n

" "

  • C

, 4, , , .... w

.... anm:- l c'#.it Limerick Generating Station Unit I 52 8;8 0 l10 l 3 of 0 ]4 e ;o go go l 0 ]1l8

-..co- m..sm,  !

nn w . --a i cause of the Event:

The cause of the main control room ventilation system isolation and initiation of the 'A' train of CREFAS is believed to have been caused by rainwater coming in contact with the 'C' chlorine analyzer probe during rainy and windy weather conditions. This caused a chemical imbalance in the probe's electrolyte which simulated a high chlorine condition. The probe is located approximately one foot away from the outside air intake louvers of the Control Enclosure intake plenum.

Corrective Actions: ,

Control room pereennel implemented Special Event Procedure SE-2 (Toxic Gas Proced re) immediately following the isolation until the signal was confirmed as false. Following the spike Operations personnel verified.that all four chlorine detector channels ('A', 'B', 'C' and 'D') indicated. chlorine concentration levels below the alarm setpoint. The main control room ventilation system isolation was reset at 1552 hours0.018 days <br />0.431 hours <br />0.00257 weeks <br />5.90536e-4 months <br /> and normal control room ventilation restored.

Actions Taken to Prevent Recurrence:

Two modifications to CREFAS were implemented to prevent spurious isolations of the Main Control Roorn (MCR) ventilation system.

The first modification consisted cf moving the analyzer probes away from the outside air louvers. This new location provides-better protection for the analyzer probes from rainwater and dirt. Since the implementation of this modification on August 28, 1988, there have been no spurious environmentally related chlorine detection system isolation of the MCR ventilation system. The second modification changed the chlorine detection system logic from a "one out of one taken once" to a "two out of

  • two taken once" configuration. With this change, a single spurious chlorine isolation channel signal will not result in a MCR ventilation system isolation. This modification will prevent any spurious environmentally related chlorine detection system ,

1 isolations of the MCR due to a single false isolation signal or a single probe malfunction. This modification was completed on I September 7, 1989.

g ,... . .

l L 2

l. t

~

. .c . . .

u s curt ssa siev6an., cevv u.o=

~

.

  • tlCENSEE EVENT REPORT (LER) TEXT CONTINUATION amo se ove =o n+o4 i

, .... nin

. .c.u t , .. . n , ,,x..,...,,, ,,,,,,,,,,,,, ...,,,,

l

.... >mn; . m:  ;

Linerick Cenerating Station, Unit 1 o p t o j o lo l 3 l 512

, t o . . - . . ..c , ., o n 81 8 -

Ol1l8 -

0 II OIA 0' 0l4 i

Previous Similar Occurrences:

f Limerick LERS 86-46, 87-03, 87-06, 87-09,87-051 and 88-014 reported CREFAS actuations resulting from a false 'C' or 'D'

. channel high chlorine concentration signal during rainy weather -

conditions. ,

Tracking Codes (C) External Cause I L i (B99) Design Deficiency j i