ML19318D028
| ML19318D028 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/01/1980 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML19318C992 | List: |
| References | |
| NUDOCS 8007070230 | |
| Download: ML19318D028 (1) | |
Text
.
g.
OFFE.ATING DATA REPORT E CCZT NO. 50-308 DATE 3/" "
CO3f?LETED BY 3 G-cairston, I j;ttpac,q _ t.:m on-5156 OPF" \\TI.';C STATU3
- 3. Unit Nar::e:
J seph M. Farley - Unit i Notes 1/ unulaEive data sinc
- 2. Reportin ; Pedad:
_h ril, 1 30 12/1/77, date of cc::ercial
- 3. Licensed Thermal Power (51Wr):
M 3.5 peration.
- 4. Namepbte Ratin;(Gross stWe):
860
- 5. Desi a Electricsl Rating (Net alhe). 829 J..'.f aximum Dependable Capacity (Gross M We): *860 e
- 7. Maximum Dependable Capaci:y (Net SIWE):
- 829 S. If Changs Occur in Capacity Ratings (Irems Nunber 3 Throu3h 7) Since Last Report. Give Ressorts:',,
t'/A
.q
- 9. Power Level To which Restrict.-d. If Any (Net NWe):
U/A
- 10. Reasons For Restrictions.!f Any:
N/A
- Dis.Mc12t Yrata.D1ta.
r-.. s-..., e.
~.
,, (
D. Number OfIfours React::r Was Critical
!!. IIours In Reportin; Perio..
e~
719-2,903 21,167 719-2.466.6 13.402.1
- 13. Reactor Reserve Shutdown Houn 0
436.4 1,841.7 I4. IIours Ge::entor On.Line 719 -
2,40.i. /
12, s. n. 2 IS. Utdt Reserve Shutdown Hours ~
- 15. Cross Thermal Ener;;y Generated (MWH) 1.870.269.9 6.03L 764.3 32,629,7'/d.<
- 17. Cross Elec*rical Ener;;y Generated (MWH) 602.082 1, <> 4 7,6 66 10,4/1,iuo s.
~
- 13. Net Electrical Ener;;y Cenented (MWH) 571.759 1.837.622 9.841,630 l740/ /,
- 19. Unit Service Factor 100 82.8 61.4
~
- 20. Urdt Avaibbility Factor 100 82.8 61.4
- 21. Urdt Capacity Factor (Usins MDC Net)
'95.0 76.4 56.1
~
- 22. Urdt Capacity Factor (Usin DER Net) 95.9 76.4 56.1 d'
- 23. Unit Forced Outage Rate 0.0 5.1 7.0
- 24. Shutdowns Scheduled Over Next 6 Months (T' pe.Date. sad Dunison of Each):
N/A
~
y
~
g.
- 25. If Shut Down At End Of Report Period, Estimated Date ofStartup:
U!A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed
~
1NITIA L CRITICALITY 8/6/77 N N,8/9/77 INITIA L ELECTR! CITY 8/20/17
,- 6/lo/U COMMERCI,\\L OPERATION 12/1/77 12/1/77 3
- The Nameplace' Rating / Design Electrical Rating will be uspd.f'or J he Maximum t
' Dependaltle Capacity until an accurate value can,be determined frcs operating experier$ce.
I"I773
8 60 7'07 0 $
_.