ML19318D028

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Apr 1980
ML19318D028
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/01/1980
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19318C992 List:
References
NUDOCS 8007070230
Download: ML19318D028 (1)


Text

.

g.

OFFE.ATING DATA REPORT E CCZT NO. 50-308 DATE 3/" "

CO3f?LETED BY 3 G-cairston, I j;ttpac,q _ t.:m on-5156 OPF" \\TI.';C STATU3

3. Unit Nar::e:

J seph M. Farley - Unit i Notes 1/ unulaEive data sinc

2. Reportin ; Pedad:

_h ril, 1 30 12/1/77, date of cc::ercial

3. Licensed Thermal Power (51Wr):

M 3.5 peration.

4. Namepbte Ratin;(Gross stWe):

860

5. Desi a Electricsl Rating (Net alhe). 829 J..'.f aximum Dependable Capacity (Gross M We): *860 e
7. Maximum Dependable Capaci:y (Net SIWE):
  • 829 S. If Changs Occur in Capacity Ratings (Irems Nunber 3 Throu3h 7) Since Last Report. Give Ressorts:',,

t'/A

.q

9. Power Level To which Restrict.-d. If Any (Net NWe):

U/A

10. Reasons For Restrictions.!f Any:

N/A

  • Dis.Mc12t Yrata.D1ta.

r-.. s-..., e.

~.

,, (

D. Number OfIfours React::r Was Critical

!!. IIours In Reportin; Perio..

e~

719-2,903 21,167 719-2.466.6 13.402.1

13. Reactor Reserve Shutdown Houn 0

436.4 1,841.7 I4. IIours Ge::entor On.Line 719 -

2,40.i. /

12, s. n. 2 IS. Utdt Reserve Shutdown Hours ~

- 15. Cross Thermal Ener;;y Generated (MWH) 1.870.269.9 6.03L 764.3 32,629,7'/d.<

17. Cross Elec*rical Ener;;y Generated (MWH) 602.082 1, <> 4 7,6 66 10,4/1,iuo s.

~

13. Net Electrical Ener;;y Cenented (MWH) 571.759 1.837.622 9.841,630 l740/ /,
19. Unit Service Factor 100 82.8 61.4

~

20. Urdt Avaibbility Factor 100 82.8 61.4
21. Urdt Capacity Factor (Usins MDC Net)

'95.0 76.4 56.1

~

22. Urdt Capacity Factor (Usin DER Net) 95.9 76.4 56.1 d'
23. Unit Forced Outage Rate 0.0 5.1 7.0
24. Shutdowns Scheduled Over Next 6 Months (T' pe.Date. sad Dunison of Each):

N/A

~

y

~

g.

25. If Shut Down At End Of Report Period, Estimated Date ofStartup:

U!A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed

~

1NITIA L CRITICALITY 8/6/77 N N,8/9/77 INITIA L ELECTR! CITY 8/20/17

,- 6/lo/U COMMERCI,\\L OPERATION 12/1/77 12/1/77 3

  • The Nameplace' Rating / Design Electrical Rating will be uspd.f'or J he Maximum t

' Dependaltle Capacity until an accurate value can,be determined frcs operating experier$ce.

I"I773

8 60 7'07 0 $

_.