OPERATING DATA I'EPORT
~
O O CT.ET NO. _5 0-M '3 DATE 3/1/80 CO>t?LETED BY LOJ3 '- aa, In TELEPlf 0.NE PM ) m-]l56 CEI'.\\ TING ST.\\TUS
- 2. Udt Nam..
J seoh M. Farlev - Unit 1 Notes 1/ Cumuiativd data
- 2. Reportin:Prr%d: -
I'e b r u ar". 19?0 since 12/1/77, date
- 3. Lice ued Thermal Power (MWr):
2652 of comercial
- l. N2meplate Rating (Grou MWe):
S60 ap r M on.
- 5. Desi;a E!ectrical Ratin;t (Net.5 tWe):
829
- 6. Sinimum Dependable Capacity (G:ms 5tWe):
- 8%
t
- 7. Sf ax!. nun Dependable Capaci:y (Net alWe):
- D' I
- 3. If Chanps Occur in Capacity Ratim;5 (Items Number 3 Through 7) Since Lut Report. Give MA
.g D. Power Level To Which Restricted,If Any (Net MWe):
NA
~
- 20. Reasons For Restrictions. If Any:
NA s
s.
J Th':s Monti.
- 21. IIours in Repor:In: Period
'. '. ?.
hto-Dau.
r - ',6ve.
696' 1, l. /.0
<19.704
~I
- 12. Number Of Hours Reacter Was Cri:Icaj 314.6 1,020.0
- 13. Reactor Resene Shutdown Hours 11.955.5 I4. Hours Generator On.Line 381.4 420.0 1,825.3 26 3 96.1.5 11,a54.0 ~.
2S. Udt Reserve Shutdown Hours
,16. Cross The mal Enegy Generated ptWH) 639,186.1 2.360.604.6,_
28.953.619.0
- 17. Grou Electrical Ener;y Ge..erated OtWH) 205,704 763.17'*
- 9,287,21;'
' 13. Net Electrical Energy Gerersted (SiWH) 187.626 714.534 E.718.542 l'Nf% }, '.,,
.~
- 19. Udt Service Factor 36.4 66.9 58.6
- 20. Udt Availability Factor
- 21. Udt Capacity Factor (Using MDC Net) 38.4 66.9 58.6 32.5 c.o, o
- 22. Udt Capacity Factor (Using DER Net) 32.5 9,s 39.9 53,4
- 23. Ur.it Forced Outap Rate 18.3 9.9 7.6
- 24. Shutdowns Scheduled OverNext 6 Months (T.kpe.Date.and Durst;on of Each):-
None
[
.. W-2S. If Shur Down At End Of Report Perir
. Estimated Date of Startup:
NA
- 25. Udts In Test Status (Prior to Commercial Operationj:
~
Forecast.
Achiesed INITIAL CRITICALITY 8 6/77 _ g '.'.8/9/77 INITIAL ELECTRICITY 8/20/77
~ ~ 8/18/ 7 7 COMMERCIAL OPERATION
'1/77 12/1/7/
~
(
- The Nameplate Rating / Design Electrical Rating will be used for th_,,
capability until an accurate value can be detersi:yed from operating experience e, maximum depen,dable s
=-
N/77).
- g n.c 800 7 07 0N
~
~
.