ML19318D021
Jump to navigation
Jump to search
| ML19318D021 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/01/1979 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML19318C992 | List: |
| References | |
| NUDOCS 8007070214 | |
| Download: ML19318D021 (1) | |
Text
-
g
's /,
OPERATLNG DATA REPORT DOCKET NO. 50-% 3 DATE 11l' /77 CO3!PLETED SY U c'
- :: ton TELEPHO.NE (?"U "'"-51 %, I)
OP.e.R ATING STAT"S
- l. Urdt Name:
'"a.,'- % N1a r -tMr i N !*5 1/ Cunulativi data since 12/1/77, date of
"-~"a.
so:c
- 2. Reportin Period:
- 3. Licensed Therm:! Power (31Wr):
2652 cc::mercial operation.
860
- 4. Namepta:e Ratin;(Grou 31We):
- 5. Design Electrical Rating (Net 31We): 8?9
- 6. Maximum Depend:ble C:paci:y (Gross 31We):
- 0
- 7. Maximum Dependsh!: C:paci:y (Net.\\lWe):
- 829
- 3. If Chan;es Occur in Capacity Ra:in;s (!: ems Nurnber 3 Through 7) Since last Report. Give Re2. sons:
N/A
- 9. Power Level To Which Restrie:ed,If Any(Net MWe):
M/3
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr to.DatE
(.
Cn 4-Ne.
!!. Hours !n Repor:ing Pe:iod 7/&
7.296 16.Fco
- 12. Number Of flours Re:c:or Was Cri:!cci 19.4 1.553.I 9,796.9
- 13. Reacti2r Reserve Shu:down Hours
-0.
72.4 1.079.9
- 14. Ilours Generator On Line. 1,510.8 9.596.5 -
- 15. Unit Reserve Shutdown Hours 16. Cross Thermal Ener:y Genersted (\\lWH) 3.556.34_7_.8_
24.379.595.8
- 17. Cross Electrical Ener;y Geners:ed (MWH) 1,137.794,
7.811.942
- 13. Net Electrial Energy Generated (MWH)
-12,194 1.025,712 7.341.538 l't%/. l
- 19. Unit Service Factor
- 20.7 57.1
- 20. Unit Asailability Factor,
20.7_
57.1
- 21. Unit Capacity Factor (Using MDC Net)
-02.0 17.0 52.7
- ^
- 22. Unit Capacity Factor (Usin3 DER Net)
-02.0 17.0 _
52.7
- 23. Unit Forced Outare Rste 5.9 7.6
- 24. ShutdownsScheduled Over Next 6 31onths (T' pe.Date.and Durstion of Eachl:
y Refueline outat'e in progress 4
1
- 25. If Shut Down At End Of Report Period. Estimated Date ofStartup:
Novernber 5. 1979
- 25. Units In Test Status (Prior to Commercial Operation):
Foreenst Achiesed INITIA L CRITICA LITY 8/6/77 8/9/77 g
INITIA L ELECTRICITY R/4/77 E/I9/77 COMMERCIA L OPERATION 12/1/77 12/1/77
- The Nameplate Rat ing/ Design Electrical Rating t.ill be us'ed far the M::cimum Depen capacity until an accurate value can be determined from operating experienepj773
-80 0 7 07 0 $$-
~... ~. " _ ~ ~..
.,~
.? ~
.~
..,,w-.
,