Revised Monthly Operating Rept for Oct 1979
ML19318D021
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/01/1979
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19318C992 List:
References
NUDOCS 8007070214
Download: ML19318D021 (1)


Text

-

g

's /,

OPERATLNG DATA REPORT DOCKET NO. 50-% 3 DATE 11l' /77 CO3!PLETED SY U c'

  • :: ton TELEPHO.NE (?"U "'"-51 %, I)

OP.e.R ATING STAT"S

l. Urdt Name:

'"a.,'- % N1a r -tMr i N !*5 1/ Cunulativi data since 12/1/77, date of

"-~"a.

so:c

2. Reportin Period:
3. Licensed Therm:! Power (31Wr):

2652 cc::mercial operation.

860

4. Namepta:e Ratin;(Grou 31We):
5. Design Electrical Rating (Net 31We): 8?9
6. Maximum Depend:ble C:paci:y (Gross 31We):
  • 0
7. Maximum Dependsh!: C:paci:y (Net.\\lWe):
  • 829
3. If Chan;es Occur in Capacity Ra:in;s (!: ems Nurnber 3 Through 7) Since last Report. Give Re2. sons:

N/A

9. Power Level To Which Restrie:ed,If Any(Net MWe):

M/3

10. Reasons For Restrictions,If Any:

N/A This Month Yr to.DatE

(.

Cn 4-Ne.

!!. Hours !n Repor:ing Pe:iod 7/&

7.296 16.Fco

12. Number Of flours Re:c:or Was Cri:!cci 19.4 1.553.I 9,796.9
13. Reacti2r Reserve Shu:down Hours

-0.

72.4 1.079.9

14. Ilours Generator On Line. 1,510.8 9.596.5 -
15. Unit Reserve Shutdown Hours 16. Cross Thermal Ener:y Genersted (\\lWH) 3.556.34_7_.8_

24.379.595.8

17. Cross Electrical Ener;y Geners:ed (MWH) 1,137.794,

7.811.942

13. Net Electrial Energy Generated (MWH)

-12,194 1.025,712 7.341.538 l't%/. l

19. Unit Service Factor
  • 20.7 57.1
20. Unit Asailability Factor,

20.7_

57.1

21. Unit Capacity Factor (Using MDC Net)

-02.0 17.0 52.7

  • ^
22. Unit Capacity Factor (Usin3 DER Net)

-02.0 17.0 _

52.7

23. Unit Forced Outare Rste 5.9 7.6
24. ShutdownsScheduled Over Next 6 31onths (T' pe.Date.and Durstion of Eachl:

y Refueline outat'e in progress 4

1

25. If Shut Down At End Of Report Period. Estimated Date ofStartup:

Novernber 5. 1979

25. Units In Test Status (Prior to Commercial Operation):

Foreenst Achiesed INITIA L CRITICA LITY 8/6/77 8/9/77 g

INITIA L ELECTRICITY R/4/77 E/I9/77 COMMERCIA L OPERATION 12/1/77 12/1/77

  • The Nameplate Rat ing/ Design Electrical Rating t.ill be us'ed far the M::cimum Depen capacity until an accurate value can be determined from operating experienepj773

-80 0 7 07 0 $$-

~... ~. " _ ~ ~..

.,~

.? ~

.~