ML19318C991

From kanterella
Jump to navigation Jump to search
Forwards Revised Monthly Operating Repts for Mar 1979- May 1980
ML19318C991
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/30/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19318C992 List:
References
NS-80-0007, NS-80-7, NUDOCS 8007070168
Download: ML19318C991 (1)


Text

- _ _. -

i

o. ~,

"~

. - - 07 A!abama Power Companf E00 Norin 13*n 3*'++t Post Off>;e 3J4 7541 eirmingham. Ataa2: s 3523f Twephone 203 K*.-5341 3

L

'd@f3lAC, Alabama Power 3

r.e scunn ewnhyste=

June 30, 1980

~

Docket 50-348 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Com:sission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Report Attached are two (2) copies of the Data Sheet section of the Monthly Operating report's for the months of March 1979 through May 1980.- These Data sheets have been revised to reflect *'

negative net generation for months applicable and the capacity factor has been adjusted as a result. All accumulation figures have been revised.to incorporate this reporting method.

If you have any questions, please advise.

Yours very truly, b

F.L. Clayton, Jr.

.FLCJr/MLS:cdb Attachments cc: Jir. Ted Cintula (1 copv)

/ Director, IE (10 copies)

Director, RII (1 copy) k R\\

.r 800707 0f[tY $^