ML19318C991
| ML19318C991 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/30/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19318C992 | List: |
| References | |
| NS-80-0007, NS-80-7, NUDOCS 8007070168 | |
| Download: ML19318C991 (1) | |
Text
- _ _. -
i
- o. ~,
"~
. - - 07 A!abama Power Companf E00 Norin 13*n 3*'++t Post Off>;e 3J4 7541 eirmingham. Ataa2: s 3523f Twephone 203 K*.-5341 3
L
'd@f3lAC, Alabama Power 3
- r.e scunn ewnhyste=
June 30, 1980
~
Docket 50-348 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Com:sission Washington, D.C. 20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Report Attached are two (2) copies of the Data Sheet section of the Monthly Operating report's for the months of March 1979 through May 1980.- These Data sheets have been revised to reflect *'
negative net generation for months applicable and the capacity factor has been adjusted as a result. All accumulation figures have been revised.to incorporate this reporting method.
If you have any questions, please advise.
Yours very truly, b
F.L. Clayton, Jr.
.FLCJr/MLS:cdb Attachments cc: Jir. Ted Cintula (1 copv)
/ Director, IE (10 copies)
Director, RII (1 copy) k R\\
.r 800707 0f[tY $^