ML19318D027
| ML19318D027 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/01/1980 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML19318C992 | List: |
| References | |
| NUDOCS 8007070228 | |
| Download: ML19318D027 (1) | |
Text
__
OPERATING DATA REPORT
~
DOCKET NO. _ 50-3t.3 DATE _ 4/1/cu COMPLETED BY R.G. Hatriton,III TELEPHO.NE D05 M9-jl56 OPERATING STATUS
- 1. Urdt Name Jomb M. Farlev - Unit I Notes 1/ Cumulative data
- 2. Reportin; Period:
Marcn.1980
- 3. Licensed Therms! Power (MWr):
2652 since 12/1/77, 'date of co.~nercial operation.
~
- 4. Narneplate Ratin;(Gross MWe):
860
- 5. Design E!ectrical Ratin.:(Net MWe):- 829
- 6. Maximum Dependable Capacity (Gross MWe):
- 860 t
- 7. Maximum Dependable Capacity (Net MWe):
- 829
- 3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since list Report. Civ.e Reaso
. ' ;h,
1 NA
- 9. Power Level To Which Rest.-ict-d. If Any (Net MWe):
'NA
~
- 10. Reasons For Restrictions,If Any:
NA
.-y n,,oa.
r,,o.D,,;
~, -
- 11. Hours in Reportla Period 744 2,184-20,448
- 12. Number OT Hours Re:c:cr Was Criti::al 727.6-1,747.6 12,683.1 U. Reactor Reserve Shutdown Hours 16.4-436.4 1.841.7
- 14. Hours Generator On.Line i
- 15. Urdt R. serve Shutdown Hours 721.2 1.684.7 12.275.2
' 25. C*ms The: mal Enecy Ge,ersted (MWH) 1,800,909.8 4,161.514.4, 30,759.528.8 ~
- 17. Gruss Electrical Enegy Ge..rsted (MWH) 582.412 1.345.586
_9.869.624
- 13. Net E!ectricsl Ener:y Genersted (MWH) 551,3J0
- 19. Unit Service Factor 06.9 1.263.864 9.269,872 l'Fe/.!,
.. +.
- 20. Unit Availabilhy Factor 96.9 77.1 6r) n 77.I 60.0
- 21. Unit Capacity Factor (Using MDC Net) 89 4
~
70.0 54.7
- 22. Unit Capacity Facto. (tJsine OER Net) 89.4 70.0 54,7 - g-
,2
"!3., Unit Forced Outage Rate d*1
/.I 7.4
- 24. Shutdowns Scheduled Over Next 6 Months (Iype.Date.and Dursiicn of Each):-
None 7.6
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
NA
' 25. Units in Test Status (Prior to Commercial Operation):
Forecsst Achiesed t
INITIA L CRITICA LITY
- 8/6/77 24 S, 8/9/77 W i'*,..
INITIAI. ELECTRICITY 8/20/77 8/18/77 COMMERCL4L OPERATION 12/1/77,
12/1/77
- The Nameplate Rating / Design Electrie,n itatin'g hill be us
(
,,t, ec's for'- tNe !ar.ime:a Dependable capacity until an accurate value cr.n be determined fron. operating e)::perience i
1
~
?-
? :' :
. _ Vill)
.c 8007070'4 8 1
-_.