ML19318D027

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Mar 1980
ML19318D027
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/01/1980
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19318C992 List:
References
NUDOCS 8007070228
Download: ML19318D027 (1)


Text

__

OPERATING DATA REPORT

~

DOCKET NO. _ 50-3t.3 DATE _ 4/1/cu COMPLETED BY R.G. Hatriton,III TELEPHO.NE D05 M9-jl56 OPERATING STATUS

1. Urdt Name Jomb M. Farlev - Unit I Notes 1/ Cumulative data
2. Reportin; Period:

Marcn.1980

3. Licensed Therms! Power (MWr):

2652 since 12/1/77, 'date of co.~nercial operation.

~

4. Narneplate Ratin;(Gross MWe):

860

5. Design E!ectrical Ratin.:(Net MWe):- 829
6. Maximum Dependable Capacity (Gross MWe):
  • 860 t
7. Maximum Dependable Capacity (Net MWe):
  • 829
3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since list Report. Civ.e Reaso

. ' ;h,

1 NA

9. Power Level To Which Rest.-ict-d. If Any (Net MWe):

'NA

~

10. Reasons For Restrictions,If Any:

NA

.-y n,,oa.

r,,o.D,,;

~, -

11. Hours in Reportla Period 744 2,184-20,448
12. Number OT Hours Re:c:cr Was Criti::al 727.6-1,747.6 12,683.1 U. Reactor Reserve Shutdown Hours 16.4-436.4 1.841.7
14. Hours Generator On.Line i
15. Urdt R. serve Shutdown Hours 721.2 1.684.7 12.275.2

' 25. C*ms The: mal Enecy Ge,ersted (MWH) 1,800,909.8 4,161.514.4, 30,759.528.8 ~

17. Gruss Electrical Enegy Ge..rsted (MWH) 582.412 1.345.586

_9.869.624

13. Net E!ectricsl Ener:y Genersted (MWH) 551,3J0
19. Unit Service Factor 06.9 1.263.864 9.269,872 l'Fe/.!,

.. +.

20. Unit Availabilhy Factor 96.9 77.1 6r) n 77.I 60.0
21. Unit Capacity Factor (Using MDC Net) 89 4

~

70.0 54.7

22. Unit Capacity Facto. (tJsine OER Net) 89.4 70.0 54,7 - g-

,2

"!3., Unit Forced Outage Rate d*1

/.I 7.4

24. Shutdowns Scheduled Over Next 6 Months (Iype.Date.and Dursiicn of Each):-

None 7.6

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

NA

' 25. Units in Test Status (Prior to Commercial Operation):

Forecsst Achiesed t

INITIA L CRITICA LITY

- 8/6/77 24 S, 8/9/77 W i'*,..

INITIAI. ELECTRICITY 8/20/77 8/18/77 COMMERCL4L OPERATION 12/1/77,

12/1/77

  • The Nameplate Rating / Design Electrie,n itatin'g hill be us

(

,,t, ec's for'- tNe !ar.ime:a Dependable capacity until an accurate value cr.n be determined fron. operating e)::perience i

1

~

?-

? :' :

. _ Vill)

.c 8007070'4 8 1

-_.