i

-a (m

\\

.p OPERATING DATA REPORT k

50-348 DOCKET NO. T/1/ 79 DATE COh!PLETED l!Y I4. G. hairston, II TELEPIIONE m ow-5156 OPERATING STATUS Joseph M. Farley Unit 1 Notes 1/Cu::nul'ative data J. Unit Name:

since12/1/77,date[of Aoril. 1979

2. Reporting Period:

coc':nercial operation. -

2652

3. Licensed Thermal Power (SlWt):

860

4. Nameplate Rating (Gross 5twe):

829 S. Design E!cetrical Rating (Net SlWe):

.h...

550*

6. h!aximum Dependable Capacity (Gross MWe):

829*

'7. Maximum Dependable Capacity (Net alwe):

8. If Changes Occur in Capacity Rstings (!tems Number 3 Through 7) Since List Report, Give Ressons:

N/A

n..

yjg

~

9. Power Level To Which Restricted. If Any (Net MWe):

N/A l0. Reasons For Restrictions,1f Any:

6..J c.

r{

... ' This Mo' nth '

Yr.-to-Date ' '

N' Odd,. sutstive 6

719 2879

.12383

' C;-"

I s

11. Hours,n Reporting Period

.. D33. /

9777.5

12. Number Of Hours Rescror Was Critical 1079.9.72.4

- 13. Reactor Reserve Shutdown Hours 1510.8 9596.5

14. Hours'Cenerstor On Line
15. Unit Rewrve Shutdown Hours

- -Ow

. ' 3.~5 5 6,3 47. 8 ~

24.379,595.8

16. Cross Thermal Energy Generated (MWH).--

- 1,137.794 7,811.992

17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Genersted (atWH)

-3786 1,066.098 7,381,924 fPgV. I

19. Unit Service Factor 52.5 77.5
  • 52.5 77.5
20. Unit Availability Factor

-00. 6 -

44.7 71.9

21. Unit Capseity Factor (Using MDC Net)
22. Unit Capacity Factur (U>!ng DER Net)

-00.6 44.7 71.9

23. Unit Forced Outage Rate

-O 7,,,,_,

5.9 7.6 24, 2hutdowns Scheduled Over Next 6 Months (Type. Date.snd Durstion of Esch):

Refueling Outage in progress.

25. If Shut Down At End Of Report Perind. Estimated Date of Startup: Reactor w y 31, 1979 Cen-on-line-June 12 a

1979

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY 8/6/77 8/9/77 8/20/77

.8/18/77 INITIAL ELECTillCITY

~

12/1/77 12/1/77

'~

COM5]EltCIA L OPERATION

  • The Nameplate Rating / Design Electrical Rating will be used for the maximum Dependable
-.. Capacity until an accurate value can be determined from operating experience.'(y7

.,.n

~

.-8007070130

.