Text
i
-a (m
\\
.p OPERATING DATA REPORT k
50-348 DOCKET NO. T/1/ 79 DATE COh!PLETED l!Y I4. G. hairston, II TELEPIIONE m ow-5156 OPERATING STATUS Joseph M. Farley Unit 1 Notes 1/Cu::nul'ative data J. Unit Name:
since12/1/77,date[of Aoril. 1979
- 2. Reporting Period:
coc':nercial operation. -
2652
- 3. Licensed Thermal Power (SlWt):
860
- 4. Nameplate Rating (Gross 5twe):
829 S. Design E!cetrical Rating (Net SlWe):
.h...
550*
- 6. h!aximum Dependable Capacity (Gross MWe):
829*
'7. Maximum Dependable Capacity (Net alwe):
- 8. If Changes Occur in Capacity Rstings (!tems Number 3 Through 7) Since List Report, Give Ressons:
N/A
- n..
yjg
~
- 9. Power Level To Which Restricted. If Any (Net MWe):
N/A l0. Reasons For Restrictions,1f Any:
6..J c.
r{
... ' This Mo' nth '
Yr.-to-Date ' '
N' Odd,. sutstive 6
719 2879
.12383
' C;-"
I s
- 11. Hours,n Reporting Period
.. D33. /
9777.5
- 12. Number Of Hours Rescror Was Critical 1079.9.72.4
- 13. Reactor Reserve Shutdown Hours 1510.8 9596.5
- 14. Hours'Cenerstor On Line
- 15. Unit Rewrve Shutdown Hours
- -Ow
. ' 3.~5 5 6,3 47. 8 ~
24.379,595.8
- 16. Cross Thermal Energy Generated (MWH).--
- 1,137.794 7,811.992
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Genersted (atWH)
-3786 1,066.098 7,381,924 fPgV. I
- 19. Unit Service Factor 52.5 77.5
- 52.5 77.5
- 20. Unit Availability Factor
-00. 6 -
44.7 71.9
- 21. Unit Capseity Factor (Using MDC Net)
- 22. Unit Capacity Factur (U>!ng DER Net)
-00.6 44.7 71.9
- 23. Unit Forced Outage Rate
-O 7,,,,_,
5.9 7.6 24, 2hutdowns Scheduled Over Next 6 Months (Type. Date.snd Durstion of Esch):
Refueling Outage in progress.
- 25. If Shut Down At End Of Report Perind. Estimated Date of Startup: Reactor w y 31, 1979 Cen-on-line-June 12 a
1979
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 8/6/77 8/9/77 8/20/77
.8/18/77 INITIAL ELECTillCITY
~
12/1/77 12/1/77
'~
COM5]EltCIA L OPERATION
- The Nameplate Rating / Design Electrical Rating will be used for the maximum Dependable
- -.. Capacity until an accurate value can be determined from operating experience.'(y7
.,.n
~
.-8007070130
.