.U OPIRATING DATA REPORT DGCK2TNO. _50-3 4 DATE II U c"
~
COM?!.ETED BY .G Hairston,III O?ER\\T*NC 'iTATUS
. 72LEPHONE (?'m m -]l56
- 2. UMI Name:
J *', h "
Fwle" - Unit 1 Notes 1/ Cumul$tive data' 4
- 2. Reportin3 ?cdod.
Dre.h, 1079 sin:e 12/1/77,'date of
~
- 2. Li:enxd Thermal Power C.IWr):
202 concarcial operation.
- 4. Namep'ste Rating (Gross MWe):
- 5. Des *;s E!::tri=I Racin;t (Net MWe): -
829
- 6. Mulmum Dependable Capacity (Grou MWe):
e M60
- 7. Mulmurn Dspendsble Caps:ity (Net MWe):
- 829
- 3. If Changes Occurin Capscity Ratin33 (!tems Numbe:3 Through 7) Sin:e L:st Repo 3
NA
'I
- n
- 9. Power Level To Which Restd::ed,1f Any (Uet MWe):
'M
- 10. Reasons For Restdctions,If Any: __ NA e.
U:Is31onth Y:<ta.D.it.
' c " - '- 's e.
- 21. Hours In Reporting Period
~
r
- 12. NInber Of Hours Reseter Was criti:al 744'
' ~ 5 8,760 18.264 1
744-2,6M. 7
- 23. Resetor Reserve Shutdow Hours I4. Hours Generscor On-Line 397.8_
10.035.5 1,405.3 721.6 2,504.8 10,590.5 IS. Unit Reserve Shutdown Hsurs "
',15. Cross The. m:1 Ener;y Ce::ersted (MWH)1.760.937.2 5.774.766.4 26.598.014.4 _
- 17. Grou Electd:s! Ener;y Generated (MWH) 572.434 1.849.840.
8,524,038
- 13. Net Electrical Ener:y Ge. ersted (MWH) ga1. qq 1.6' S.182
_8,004,008 lReff s
- 19. Unit Servic.e Factor
- 20. Unit Availability Factor 97.0 28.6 58.0
- 21. Unit e.spacity Factor (Using MDC Net) 97.0 28.6 53.0 87.9 23.2 Ma
- 22. Udt Lapscity Factor (Uda; DER Net) 87.'3 23., Unit Forced Outsge R:te 23.2 52.9 -
0.4
- 24. Shutdowns ScheduIed Over Next 6 Months (Type.Date.:nd Durstion of Each):
5.5 7.4 Neve shutdown scheduled for March 14, The duration is es:imated at two weeks.1980 for su raillance testin2.
'. Ye ~
- 25. ITShur Down At Er.J Of Report Period. Estimated Date of Startup:
'IA
^ 26. Units In Test Status (Pdor to Commercisi Operation):
Forecast
, Achiesed INITIA L CRITICALITY
~
INITIA L ELECTRfCITY
- 8/6/77 8/9/77 8/20/77.
COMMERCIA L OPERATION 8/18I77 12/1/77 12/1/}77
(
- The Nameplate Rating / Design Electrical will'be
,..,. Capacity entil an accurate value can be determined from op r
used for tl's Ma.xicu1 Dependabla
. xperience.
9177)
~
s
, ' ^ ~. ^ '..
c.
8UO707 M '