A.
s.
v f
OPEP. AT!NG D ATN EPOI:T s.
DOCKET NO. 50-3/.9 DATE 8/l /70 C0"."LETED f Y !!. G J bi;s:en, II TELEPllONE (y "?.3136 OPrl: \\ TING STATUS.
- 1. Unit Na:c -
Joseph.fi.__i a r_ ley - Un t 1
N '*5 s
1/ Cur.ulative data
- 2. Repentin; Period:
sluly., 1979 -
since 12/1/79, date of
- 26c, co=nercial operation
- 3. Licens:d Thermal Power t.\\t'...ts:
s
- 4. Nameplate 1:. tic;(Gross MWel:
860 829
- 5. De>i;n E!cetri:alllatin;(Net '. Wel:
- 6..'faximum Dependab!c Capacity (Cross MWe):
MO*
- 7. Masimum Dependable C:pacity (Net MWe):
829*
S. If Chan;es Occurin Capacity 1:stin;> (Items Num'.aer 3 Throu;h 7)Since Last Report.Che Reasons:
~
n/A
- 9. Power Leu 4 To Wldeh Restricted.If Any(Net MWe):
N/A
- 10. Reason > Tor ::ntrictio::s. If Any:
N/A
~
, ____ y{
~
Dis Month Yr.-to.Date Cumulative
!!. Hours In Reporting Period 744 5037 14591
- 12. Number Of!!onis Reactor Was Critical 0
1533.7 9777.5
- 13. Reactor Centre Shutdown Hours
. 0 72.4 1079.9
- 14. Hours Generator On.Line 0
1510.8 0596.5 IS. Unit Res'erve Shutdown Huurs
- 0 0
0
- 16. Gross Thernial Ener;y Generuted (MWH) 0 3.556.347.8 24.379.593.8
- 17. Gross Electrical Energy Gener..ted (MWil) 0
_1.137.794 7.811,992 IS. Net Deetrical Energy Generated (MWil)
-6158 1,049,124 7,364,930 gy. l
- 19. Unit Senice Factor
^
'O 2o 7 M.9
- 20. Unit Availability Fact'or 0
29.7 65.8
- 21. Unit Capacity Factor (Using MUC Net).
-01.0 24.9 60.9
- 22. Unit Cap.ielty Factor (Usin; DER Net)
-01.0 24.9 60.9
- 23. Unit Forced Outage R.ne 0
5.9 7.6
- 24. Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Each):
Refuelint; Outane and Anchor Bolt Testing in progress
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 8!A/!/I
- 26. Units in rest St.itus IPrior ta Commercial Operation):
. Forecast Achiesed k' ')
INITI\\l.Ci:iflCALITY 8/6/77 8L917.7 INITIAL 11LECTRICITY OL20]77
-8/18/77 CUMMERCIAL OPEltAfl0N 12!.t 477
._ff211477
$The llameplate Rating / Design Electrical Rating will.be usel for the. Maxi:::u:t Dependable capacity until an accurate value can be determined frors operatirpp73
.s.
experience.
M 0 7 p 0 M - :-
~
- - ~ - - - ~
- - -