Revised Monthly Operating Rept for Aug 1979
ML19318D016
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/01/1979
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19318C992 List:
References
NUDOCS 8007070204
Download: ML19318D016 (1)


Text

._

(,) -

%s 4

OPERATING DATA :'EPORT

[

DOCI'ET No. SPfl-3A8_

DATE 9/I/79 COMPLETED DY R._.G _.F 1[rston, II' TELEPHO.',E L20 5 M93-5156 '

CPFit.\\T!'?G ST \\TL'S

2. Unit N. rne:

Jor..nh M. l'arley - Unit 1 Noto 1/ Cu=ulative data

2. Reportin; Periad..

Annust. 1979 since 12/1/77, date of

3. Liecnsed 1 herma! Pov.er C.;V.;n 2652 co=ercial operation.
4. N:mep are Rs:in;(Gross MWe):

860 t

5. Design EleeiricalItatin :(.N*ct MWel:

829

6. Muimum Dependstile Capacity (Cron MWe):

860*

7. Maximum Dep:nd:ble C:pacity ( Act MWe):

829x S. If Ch:ngs occur in C.:p: city R:tia;s (!tems Number 3 Throu;h 7) Sia:e Last Report, Give Reasons:

N/A w.

9. Power Lescl To which Restri:ted,if Any (Net MWe):

N/A

10. Re: sons For Restrictions. If Any:

'!/A

{,

'ThisMonth Yr.-to-Date

, Cumulative,

!!. Hours la Reporting Period 744

% 31 15.335

12. Numher Of Hours R: eter Was Critical 1533.7 9,777.5
13. Reactur Re.<ene Shutdown Huurs

+

72.4 1 O'/9. 9

14. Hours Generator on Line 1510.8 9.595.5 IS. Urdt Re>:ne Simtdown Hours ~0-

._0_

16. Cross The:nu! Energy Gener: red (MWH) 3,556.347.8 24.379.5c5.8
17. Gross Electrical Energy Generated (MWH) 1,137,794
18. Net E!:etrical Ener;y Generated (MWH)

-5796 1.043.328

_ 7,811,992 7,359,154

, g,l

19. Unit Senice Factor 25.9 62.6

'23. Unit As:ilability Factor 25.9 62.6_

21. Unit Capacity Fsetor tU>in; MDC Nerl

-00.9 21.6 57.9

22. Unit Capacity Factor (U>in.: DER Net)

~00 9 21*O 57 9 j

23. Unit Forced Outage Rate 5.9 7.6
24. Shutdown > Scheduled Oier Ne.st 6 Months (Type. Date.nnd Duration of E::ch t-Refueline outage and andhor bolt testinn in orocress.
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

9/30/79

25. Units in Test Status iPrior to Coinmercial Operationi:

Forcesst Achined INITIA L CR!r!CALITY 8/6/77_

8/9/77 (k

INITIAL Et ECTRICITY 8/20/77 S/18/77 s

COMMERCIAL OPElt Al'10N

?-

I' I

  • The Nameplate Rating / Design Electrical Rating will be used for the Maxi capacity until an accurate value can be determined from operating experien c:um Dependable 800 7 07 0 M,

~

~

'