Text
._
(,) -
%s 4
OPERATING DATA :'EPORT
[
DOCI'ET No. SPfl-3A8_
DATE 9/I/79 COMPLETED DY R._.G _.F 1[rston, II' TELEPHO.',E L20 5 M93-5156 '
CPFit.\\T!'?G ST \\TL'S
- 2. Unit N. rne:
Jor..nh M. l'arley - Unit 1 Noto 1/ Cu=ulative data
- 2. Reportin; Periad..
Annust. 1979 since 12/1/77, date of
- 3. Liecnsed 1 herma! Pov.er C.;V.;n 2652 co=ercial operation.
- 4. N:mep are Rs:in;(Gross MWe):
860 t
- 5. Design EleeiricalItatin :(.N*ct MWel:
829
- 6. Muimum Dependstile Capacity (Cron MWe):
860*
- 7. Maximum Dep:nd:ble C:pacity ( Act MWe):
829x S. If Ch:ngs occur in C.:p: city R:tia;s (!tems Number 3 Throu;h 7) Sia:e Last Report, Give Reasons:
N/A w.
- 9. Power Lescl To which Restri:ted,if Any (Net MWe):
N/A
- 10. Re: sons For Restrictions. If Any:
'!/A
{,
'ThisMonth Yr.-to-Date
, Cumulative,
!!. Hours la Reporting Period 744
% 31 15.335
- 12. Numher Of Hours R: eter Was Critical 1533.7 9,777.5
- 13. Reactur Re.<ene Shutdown Huurs
+
72.4 1 O'/9. 9
- 14. Hours Generator on Line 1510.8 9.595.5 IS. Urdt Re>:ne Simtdown Hours ~0-
._0_
- 16. Cross The:nu! Energy Gener: red (MWH) 3,556.347.8 24.379.5c5.8
- 17. Gross Electrical Energy Generated (MWH) 1,137,794
- 18. Net E!:etrical Ener;y Generated (MWH)
-5796 1.043.328
_ 7,811,992 7,359,154
, g,l
- 19. Unit Senice Factor 25.9 62.6
'23. Unit As:ilability Factor 25.9 62.6_
- 21. Unit Capacity Fsetor tU>in; MDC Nerl
-00.9 21.6 57.9
- 22. Unit Capacity Factor (U>in.: DER Net)
~00 9 21*O 57 9 j
- 23. Unit Forced Outage Rate 5.9 7.6
- 24. Shutdown > Scheduled Oier Ne.st 6 Months (Type. Date.nnd Duration of E::ch t-Refueline outage and andhor bolt testinn in orocress.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
9/30/79
- 25. Units in Test Status iPrior to Coinmercial Operationi:
Forcesst Achined INITIA L CR!r!CALITY 8/6/77_
8/9/77 (k
INITIAL Et ECTRICITY 8/20/77 S/18/77 s
COMMERCIAL OPElt Al'10N
?-
I' I
- The Nameplate Rating / Design Electrical Rating will be used for the Maxi capacity until an accurate value can be determined from operating experien c:um Dependable 800 7 07 0 M,
~
~
'