ML19318D017
| ML19318D017 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/01/1979 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML19318C992 | List: |
| References | |
| NUDOCS 8007070208 | |
| Download: ML19318D017 (1) | |
Text
,
p f-)
U f~
OPERATING DATA REPORT DOCKET NO. 50-343 DA7E 10/1/74
~
COMPLETED BY G.
Hai.rston, II' TELEPHO,NE (205 m -5136 CPERAT!NC STATUS N
- 5
- 1. U..it N2me:
J ce,h M.
I':t ri e - I'n f t I 1/ C==ulative Data
- 2. Reportin3 eriod:
S"",,-ge
, 107 since 12/1/77, date of P
2652 com:nercial operation.
- 3. Licrised Thermal Pcwer (MWr):
860
- 4. Nameplate Ratin3 (Grog MWe):
829
- 5. Design E!r::rie:1 Rating (Net MW" e):
- 6. Maximum Dependab!: Capscity (Cross MWe):
FW s
829*
- 7. Maximum Depend:ble Capacity (Net MWe).
- 3. If Changes Occur in Capacity Ratings (I: ms Number 3 Through 7) Since Lt.st aeport..Give Reasons:
~
M/A
- 9. Power Level To which Restricted.If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A rTid>Nonth -
Yr.-t o.Dat s-Cumulativ- -
' s.
720 6.551 16.055
- 11. Hours In Reportin; Pedod
' 1,533.7 9.772 5
- 12. Number Of Hours Reactor Was Critica!
72.4 1.C rg/. 9
~
- 13. Reactor Reserve Shutdown Hours -
- 14. Hours Cenerator On.LL.e
. 1.510.8 9,596.5.
- 15. Unit Reserve Shutdown Ho'ers
~ -. n -.
- 16. Gross Therm 21 Energy Gener ted (MWH) 3.556.347.8 24.379.595.8
- 17. Gross Electric:1 Ene. ;y Generated (MWH) 1.137.794 7.811.992
- 18. Net Electrical Ener;y Genersted (MWH)
~
1.037,906 7.353.732 l@V./
- 19. Unit Servie: Factor
~0-23.I 50.8
- 20. Unit ' esilability Factor 23.1 59.8
-00.9 19.1 55.3
- 21. Unit Capacity Factor (Using MDC Net) g,(
~ 22. Unit Capacity Factor (Using DER Net)
-00.9 19.1 55.3
- 23. Unit Forced Out32e Rate 5.9 7.6
- 24. Shutdowns Scheduled Over Next 6 Months (T'ype.Date. nd Duration of E:ch):
Refuelinc Outace and anchor holt testine in orogress.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
October 26. 1979
- 25. Units !n Test Status (Prior to Commercis10peration):
Forecast Achieved INITIA L CRITICA LITY 8/6/77 8/9/77 INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIA L Ol'ER ATION 12/l/77 12/1/77
"'" The Nameplate Rating / Design Electrical Rating vill be uhed for the Maximum Dependable capacity until an accurate value can be deter =ined from operating experience.
s.
(0/77)
Ir;
_ ;,g. g,,
8 0 0 7l 7 55 Y
'~
.