ML19318D017

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Sept 1979
ML19318D017
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/01/1979
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19318C992 List:
References
NUDOCS 8007070208
Download: ML19318D017 (1)


Text

,

p f-)

U f~

OPERATING DATA REPORT DOCKET NO. 50-343 DA7E 10/1/74

~

COMPLETED BY G.

Hai.rston, II' TELEPHO,NE (205 m -5136 CPERAT!NC STATUS N

  • 5
1. U..it N2me:

J ce,h M.

I':t ri e - I'n f t I 1/ C==ulative Data

2. Reportin3 eriod:

S"",,-ge

, 107 since 12/1/77, date of P

2652 com:nercial operation.

3. Licrised Thermal Pcwer (MWr):

860

4. Nameplate Ratin3 (Grog MWe):

829

5. Design E!r::rie:1 Rating (Net MW" e):
6. Maximum Dependab!: Capscity (Cross MWe):

FW s

829*

7. Maximum Depend:ble Capacity (Net MWe).
3. If Changes Occur in Capacity Ratings (I: ms Number 3 Through 7) Since Lt.st aeport..Give Reasons:

~

M/A

9. Power Level To which Restricted.If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A rTid>Nonth -

Yr.-t o.Dat s-Cumulativ- -

' s.

720 6.551 16.055

11. Hours In Reportin; Pedod

' 1,533.7 9.772 5

12. Number Of Hours Reactor Was Critica!

72.4 1.C rg/. 9

~

13. Reactor Reserve Shutdown Hours -
14. Hours Cenerator On.LL.e

. 1.510.8 9,596.5.

15. Unit Reserve Shutdown Ho'ers

~ -. n -.

16. Gross Therm 21 Energy Gener ted (MWH) 3.556.347.8 24.379.595.8
17. Gross Electric:1 Ene. ;y Generated (MWH) 1.137.794 7.811.992
18. Net Electrical Ener;y Genersted (MWH)

~

1.037,906 7.353.732 l@V./

19. Unit Servie: Factor

~0-23.I 50.8

20. Unit ' esilability Factor 23.1 59.8

-00.9 19.1 55.3

21. Unit Capacity Factor (Using MDC Net) g,(

~ 22. Unit Capacity Factor (Using DER Net)

-00.9 19.1 55.3

23. Unit Forced Out32e Rate 5.9 7.6
24. Shutdowns Scheduled Over Next 6 Months (T'ype.Date. nd Duration of E:ch):

Refuelinc Outace and anchor holt testine in orogress.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

October 26. 1979

25. Units !n Test Status (Prior to Commercis10peration):

Forecast Achieved INITIA L CRITICA LITY 8/6/77 8/9/77 INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIA L Ol'ER ATION 12/l/77 12/1/77

"'" The Nameplate Rating / Design Electrical Rating vill be uhed for the Maximum Dependable capacity until an accurate value can be deter =ined from operating experience.

s.

(0/77)

Ir;

_ ;,g. g,,

8 0 0 7l 7 55 Y

'~

.