U f~ OPERATING DATA REPORT .

' DOCKET NO. 50-343 ,

DA7E 10/1/74

~

COMPLETED BY _!;. G. Hai.rston, II' TELEPHO,NE (205 m -5136 CPERAT!NC STATUS J ce,h M. I':t ri e - I'n f t I N *5 1/ C ==ulative Data

1. U..it N2me: _

S"",,-ge , 107 since 12/1/77, date of

2. Reportin3Period:

2652 com:nercial operation. -

3. Licrised Thermal Pcwer (MWr):
4. Nameplate Ratin3 (Grog MWe): 860
5. Design E!r::rie:1 Rating (Net MW" e): 829
6. Maximum Dependab!: Capscity (Cross MWe): FW '

s

. 7. Maximum Depend:ble Capacity (Net MWe). 829*

3. If Changes Occur in Capacity Ratings (I: ms Number 3 Through 7) Since Lt.st aeport..Give Reasons:

~ '

, M/A

9. Power Level To which Restricted.If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A rTid>Nonth - Yr.-t o.Dat s- Cumulativ- -

, ' s. -

11. Hours In Reportin; Pedod '

., 720 6.551 16.055 1,533.7 9.772 5

12. Number Of Hours Reactor Was Critica! .
13. Reactor Reserve Shutdown Hours -

72.4 1.C rg/. 9

~

14. Hours Cenerator On.LL.e . 1.510.8 9,596.5 .
15. Unit Reserve Shutdown Ho'ers ~ -. n - . .

. 16. Gross Therm 21 Energy Gener ted (MWH) 3.556.347.8 24.379.595.8 -

17. Gross Electric:1 Ene. ;y Generated (MWH) --

1.137.794 7.811.992 -

18. Net Electrical Ener;y Genersted (MWH) -

~

1.037,906 7.353.732 l@V./

19. Unit Servie: Factor .

~0- 23.I __ 50.8

20. Unit ' esilability Factor 23.1 59.8
21. Unit Capacity Factor (Using MDC Net) - -00.9 19.1 55.3 g,(

~ 22. Unit Capacity Factor (Using DER Net) -00.9 19.1 55.3

23. Unit Forced Out32e Rate 5.9 7.6
24. Shutdowns Scheduled Over Next 6 Months (T'ype.Date. nd Duration of E:ch):

Refuelinc Outace and anchor holt testine in orogress. - -

25. If Shut Down At End Of Report Period. Estimated Date of Startup: October 26. 1979 .
25. Units !n Test Status (Prior to Commercis10peration): Forecast Achieved

, INITIA L CRITICA LITY 8/6/77 8/9/77 INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIA L Ol'ER ATION 12/l/77 12/1/77

"'" The Nameplate Rating / Design Electrical Rating vill be uhed for the Maximum Dependable capacity until an accurate value can be deter =ined from operating experience. ..

,_ , s.

(0/77) .-

_ . Ir; -

,, _ ;,g . g,, ,

8 0 0 7l 7 55

- ' ' '~

- - - Y " ' '

_ . _