Revised Monthly Operating Rept for May 1979
ML19318D006
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/01/1979
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19318C992 List:
References
NUDOCS 8007070190
Download: ML19318D006 (1)


Text

,.

b, OPERATING DATA R EPORT p

L DOCKET NO. 50-348 DATE 6/1/73 CO.'.iPLETED 1:Y W.

C.

"M_ston, 11 TELEPHONE (205) W -5156 OPCR \\ TING STATU$

g, c,.; N n.::

Joseph M. Farley Unit 1 N tas 1/ Cumulative

2. Rercrting Perm. d: !!ay' 1979 data since 12/1/77, date of concercial operation.
3. Li:ensed Thermal Power (MWt):

26_52 850

4. Namen! ate Itating (Gros >.'.1Wel:

829

5. Desi;.t E!ectrie.'11:atia;lNet MWe):

860*

6..'Iniaiura Dep-nd.ib!e C::paeny (G:n inh DER Net)

-00.8 35.3 67.8

23. Unit Forced Outage Rate 5.9 7.6
24. ShutdowmScheduled Oser Neit 6 Months (Ty.Date.and Duration of Eachl:

e

! % n. men. % m e-ass

25. If Shut Down At End Oflleport Period. Estimated D. te of Startup: Reactor - June 29, 1979 Gen.-on-line 7-13-79
26. Units in Test Statu4 Prior to Cn'nunercial Operation):

Forcea>t

_. ~ Achiesed INITIAL CRITICA LITY 8/6/77

'8/9/77 INITIAL ELECTit! CITY 8/20/77

'8/18/77' COM.\\iEltCIA L OPEllATION I2/I/77 I2/II77

  • The tiameplate Rating / Design Electrical Rating will be used for the Maximus D'ependable,

. capacity until an accurate value can be determined fro:s operating esiperience. " -