ML19318C995

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Mar 1979
ML19318C995
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/01/1979
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19318C992 List:
References
NUDOCS 8007070176
Download: ML19318C995 (1)


Text

.' .

(A  ;%

OPERATING DATA REPORT DOCKET NO. 50-348 DATE 4/l//V CO31PLETED BY _W. G. na frs ton , IIT

, TELEP:less 12(h > c -5155 OPERATING ST ATUS

1. Unit t'ame: Joscoh M. Farley - Unit 1 Notes 1/Cuculativa data .
2. Reportin; Period: t h rch , 1979 since 12/1/77, date of commercial operation 2 o 3 ",
3. Licened Thermal Power (MWr):
4. Namepbre Rating (Gross MWe): 860 2
5. Desi n Electrical Racin;(Net MWe): 829 e
6. Muimum Depend 2ble Capacity (Grou MWe): *S60 -
7. Maximum Dependable Capacity (Net NWe): * ,

Y.

8. If Changes Occur la Capaci:y Ratings (!tems Number 3 hrough 7) Since Las: Report. Give Reasons: 7,

?!A .

4 1

9. Power Level To which Restricted,If Any Net MWe): NA
10. Reasons For Restrictions,If Any: Y q This Month Yr.rto-Dau. Cumulatiae
11. Hours In Reporting Period
  • 744 2,160

~

11,b64

' 12. Number Of Hours Reactor Was Critical 187.4 1,533./ 9,///.a

~ 13. Reactor Reserve Shutdown Hours 2.7 72.4 1,079.9

'~

14. Ilours Generator On.Line 106 0
  • 1.3i0 0
15. Unit Reserve Shutdown Hours 9,596.5 ~.

- 16. Gross Ther n.,1 Energy Generated (MWH) 381,912.7 3,556,347.8, 24,379,535.8 -

17. Gross Electrical Ener;y Generated (MWH) _ 121,834 1,137,794 7,8L1,992 -
13. Net Electrical Ener:y Generated (MWH) 109,926 1,069.884 7.385,710
19. Unit Service Factor 25.1 Ty./

(29.9

~

20. Ucit Availability Factor 62.3 <

25.1 o9.9 oz.3

21. Unit Capacity Factor (Using MDC Net) -

17.8 -

59.7 76.4

22. Unit Capacity Factor (Using DER Net) 17.8 -

59.7 76.4

~

g,

23. Unit Forced Outage Rate 1.4 5.9 7.6
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eachl:

Refueline, Outage; March,1980; approximately 10 weeks

25. If Shut Down At End Of Report Period. Estimated Date of#7Startup: '
26. Units In Test Status (Prior to Commercial Operation):

. Forecast . . Achieved INITIAL CRITICALITY -8/6/77 :P 8/9/77 INITIAL ELECTRICITY 8/20/77 S/18j/;

COMMERCL)L OPERATION 12/1/77 , ' 12/1/7_7

( ,:*The Nameplate Dating / Design Electrical Rating will be used for .,.a Mt n"m Dependable capacity utitil an accurate value can be determined from operating expt tence.

.- . ("/77)

.. . ,, , . f.

' ~ ' " '

000 7 07 0 [w . -