(A OPERATING DATA REPORT DOCKET NO. 50-348 DATE 4/l//V CO31PLETED BY
_W. G. na frs ton, IIT TELEP:less 12(h >
c
-5155 OPERATING ST ATUS
- 1. Unit t'ame: Joscoh M. Farley - Unit 1 Notes 1/Cuculativa data
- 2. Reportin; Period:
t h rch, 1979 since 12/1/77, date of
- 3. Licened Thermal Power (MWr):
2 o 3 ",
commercial operation
- 4. Namepbre Rating (Gross MWe):
860
- 5. Desi n Electrical Racin;(Net MWe):
829 2
- 6. Muimum Depend 2ble Capacity (Grou MWe):
- S60 e
- 7. Maximum Dependable Capacity (Net NWe):
Y.
- 8. If Changes Occur la Capaci:y Ratings (!tems Number 3 hrough 7) Since Las: Report. Give Reasons:
?!A 7,
4 1
- 9. Power Level To which Restricted,If Any Net MWe):
NA
- 10. Reasons For Restrictions,If Any:
Y q
This Month Yr.rto-Dau.
Cumulatiae
- 11. Hours In Reporting Period 744 2,160 11,b64
~
- 12. Number Of Hours Reactor Was Critical 187.4 1,533./
9,///.a
~
- 13. Reactor Reserve Shutdown Hours 2.7 72.4 1,079.9
'~
- 14. Ilours Generator On.Line 106 0
- 1.3i0 0 9,596.5
~.
- 15. Unit Reserve Shutdown Hours - 16. Gross Ther n.,1 Energy Generated (MWH) 381,912.7 3,556,347.8, 24,379,535.8
- 17. Gross Electrical Ener;y Generated (MWH)
_ 121,834 1,137,794 7,8L1,992
- 13. Net Electrical Ener:y Generated (MWH) 109,926
- 19. Unit Service Factor 25.1 1,069.884 7.385,710 Ty./
(29.9 62.3
~
- 20. Ucit Availability Factor 25.1 o9.9 oz.3
- 21. Unit Capacity Factor (Using MDC Net) 17.8 59.7 76.4
- 22. Unit Capacity Factor (Using DER Net) 17.8 59.7 76.4
~ g,
- 23. Unit Forced Outage Rate 1.4 5.9 7.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eachl:
Refueline, Outage; March,1980; approximately 10 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 7
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast.
Achieved INITIAL CRITICALITY
-8/6/77
- P 8/9/77 INITIAL ELECTRICITY 8/20/77 S/18j/;
COMMERCL)L OPERATION 12/1/77
, ' 12/1/7_7
(,:*The Nameplate Dating / Design Electrical Rating will be used for
.,.a Mt capacity utitil an accurate value can be determined from operating expt n"m Dependable tence.
.-. ("/77)
. f.
~ ' " '
000 7 07 0 [w
.