(A OPERATING DATA REPORT DOCKET NO. 50-348 DATE 4/l//V CO31PLETED BY

_W. G. na frs ton, IIT TELEP:less 12(h >

c

-5155 OPERATING ST ATUS

1. Unit t'ame: Joscoh M. Farley - Unit 1 Notes 1/Cuculativa data
2. Reportin; Period:

t h rch, 1979 since 12/1/77, date of

3. Licened Thermal Power (MWr):

2 o 3 ",

commercial operation

4. Namepbre Rating (Gross MWe):

860

5. Desi n Electrical Racin;(Net MWe):

829 2

6. Muimum Depend 2ble Capacity (Grou MWe):
  • S60 e
7. Maximum Dependable Capacity (Net NWe):

Y.

8. If Changes Occur la Capaci:y Ratings (!tems Number 3 hrough 7) Since Las: Report. Give Reasons:

?!A 7,

4 1

9. Power Level To which Restricted,If Any Net MWe):

NA

10. Reasons For Restrictions,If Any:

Y q

This Month Yr.rto-Dau.

Cumulatiae

11. Hours In Reporting Period 744 2,160 11,b64

~

12. Number Of Hours Reactor Was Critical 187.4 1,533./

9,///.a

~

13. Reactor Reserve Shutdown Hours 2.7 72.4 1,079.9

'~

14. Ilours Generator On.Line 106 0
  • 1.3i0 0 9,596.5

~.

15. Unit Reserve Shutdown Hours - 16. Gross Ther n.,1 Energy Generated (MWH) 381,912.7 3,556,347.8, 24,379,535.8
17. Gross Electrical Ener;y Generated (MWH)

_ 121,834 1,137,794 7,8L1,992

13. Net Electrical Ener:y Generated (MWH) 109,926
19. Unit Service Factor 25.1 1,069.884 7.385,710 Ty./

(29.9 62.3

~

20. Ucit Availability Factor 25.1 o9.9 oz.3
21. Unit Capacity Factor (Using MDC Net) 17.8 59.7 76.4
22. Unit Capacity Factor (Using DER Net) 17.8 59.7 76.4

~ g,

23. Unit Forced Outage Rate 1.4 5.9 7.6
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eachl:

Refueline, Outage; March,1980; approximately 10 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
  1. 7
26. Units In Test Status (Prior to Commercial Operation):

Forecast.

Achieved INITIAL CRITICALITY

-8/6/77

P 8/9/77 INITIAL ELECTRICITY 8/20/77 S/18j/;

COMMERCL)L OPERATION 12/1/77

, ' 12/1/7_7

(,:*The Nameplate Dating / Design Electrical Rating will be used for

.,.a Mt capacity utitil an accurate value can be determined from operating expt n"m Dependable tence.

.-. ("/77)

. f.

~ ' " '

000 7 07 0 [w

.