Forwards IE Insp Repts 50-266/80-02 & 50-301/80-01 on 800122-24.No Noncompliance Noted
ML19309D729
Person / Time
Site: Point Beach  
Issue date: 03/05/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19309D730 List:
References
NUDOCS 8004110230
Download: ML19309D729 (2)


See also: IR 05000266/1980002

Text

8['p u%

%,

UNITED STATES

[/G

+

,,

1

NUCLEAR REGULATORY COMMISSION

,,.,

o

$

E

REGION lil

  • '

%

799 ROOSEVELT ROAD

g

,[

GLEN ELLYN. ILLINOIS 6o137

,

  • ...*

NAR 0 Igg

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN:

Mr. Sol Burstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the inspection conducted by Mr. J. D. Smith and

Mr. R. L. Hague of this office on January 22 thru 24, 1980, of activi-

ties at Point Beach Nuclear Power Plant, Units I and 2 authorized by

NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion

of our findings with Mr. G. A. Reed at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

With regard to the spent fuel pool leakage problem, the leak test you

conducted indicates there are flow paths for leakage to escape to the

environment. Although surveys and tests conducted to date reveal no

environmental concerns, (see Report Nos. 50-266/79-04 and 50-301/79-03

dated March 22, 1979), the NRC is concerned about this matter. Please

respond within thirty days and inform us of your proposed plan of action

and schedule for identifying and correcting the source of leakage.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information f'om public disclosure. The application must

r

4004110

m

..

Wisconsin Electric Power

-2-

gag gg

-

Compamy

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

9

R. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection

Report No. 50-266/80-02

and No. 50-301/80-01

cc w/ enc 1:

Mr. G. A. Reed, Plant

Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Sandra A. Bast, Lakeshore

Citizens for Safe Energy

Mr. John J. Duffy, Chief

Boiler Inspector, Department

of Industry, Labor and

Human Relations