ML19122A480

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-439 Revision 2
ML19122A480
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/26/2019
From: Thomas Wengert
Plant Licensing Branch IV
To: Arnold T
Entergy Nuclear Operations
References
L-2019-LLA-0061
Download: ML19122A480 (3)


Text

NRR-DMPSPEm Resource From: Wengert, Thomas Sent: Friday, April 26, 2019 8:08 AM To: Arnold, Timothy Cc: rgasto1@entergy.com; Pyle, Stephenie; BICE, DAVID B (ANO); Pascarelli, Robert

Subject:

ANO Unit 1 - Acceptance of Requested Licensing Action RE: LAR to Adopt TSTF-439 Revision 2 (EPID L-2019-LLA-0061)

By letter dated March 25, 2019 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML19084A217), Entergy Operations, Inc. submitted a license amendment request for Arkansas Nuclear One, Unit 1 (ANO-1). Specifically, the proposed amendment would adopt Technical Specifications Task Force (TSTF) Traveler 439 (TSTF-439), Revision 2, Eliminate Second Completion Times Limiting Time of Discovery of Failure to Meet an LCO [Limiting Condition for Operation].

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 120 hours5 days <br />0.714 weeks <br />0.164 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is April 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay 1

may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at 301-415-4037.

Tom Wengert Senior Project Manager - Arkansas Nuclear One, Units 1 and 2 U.S. Nuclear Regulatory Commission NRR/DORL/LPL4 (301) 415-4037 2

Hearing Identifier: NRR_DMPS Email Number: 938 Mail Envelope Properties (BN8PR09MB3633489B5BE2EA75D0D0F0CC8F3E0)

Subject:

ANO Unit 1 - Acceptance of Requested Licensing Action RE: LAR to Adopt TSTF-439 Revision 2 (EPID L-2019-LLA-0061)

Sent Date: 4/26/2019 8:07:41 AM Received Date: 4/26/2019 8:07:00 AM From: Wengert, Thomas Created By: Thomas.Wengert@nrc.gov Recipients:

"rgasto1@entergy.com" <rgasto1@entergy.com>

Tracking Status: None "Pyle, Stephenie" <SPYLE@entergy.com>

Tracking Status: None "BICE, DAVID B (ANO)" <DBICE@entergy.com>

Tracking Status: None "Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>

Tracking Status: None "Arnold, Timothy" <TARNOLD@entergy.com>

Tracking Status: None Post Office: BN8PR09MB3633.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3541 4/26/2019 8:07:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: