RA-19-0135, Annual Radioactive Effluent Release Report

From kanterella
(Redirected from ML19113A291)
Jump to navigation Jump to search
Annual Radioactive Effluent Release Report
ML19113A291
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/24/2019
From: Mccabe B
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-19-0135
Download: ML19113A291 (56)


Text

e/_DUKE Brian C. McCabe Support Services Manager ENERGYc. Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562-9300 919.362.2124 April 24, 2019 Serial: RA-19-0135 ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400/Renewed License No. NPF-63

Subject:

Annual Radioactive Effluent Release Report Ladies and Gentlemen:

In accordance with Harris Nuclear Plant Technical Specification 6.9.1.4, Duke Energy Progress, LLC, is providing the enclosed Annual Radioactive Effluent Release Report for 2018.

This submittal contains no regulatory commitments. Please refer any questions regarding this submittal to Sarah McDaniel at (919) 362-2002.

Sincerely, Ju,()11\ C. mtCk Brian C. McCabe Enclosure cc: J. Zeiler, NRC Sr. Resident Inspector, HNP P. Cox, RAM Branch - Environmental, N.C. DHSR M. Barillas, NRC Project Manager, HNP NRC Regional Administrator, Region II

Brian C. McCabe Support Services Manager Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562-9300 919.362.2124 Serial: RA-19-0135 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400/Renewed License No. NPF-63

Subject:

Annual Radioactive Effluent Release Report Ladies and Gentlemen:

In accordance with Harris Nuclear Plant Technical Specification 6.9.1.4, Duke Energy Progress, LLC, is providing the enclosed Annual Radioactive Effluent Release Report for 2018.

This submittal contains no regulatory commitments. Please refer any questions regarding this submittal to Sarah McDaniel at (919) 362-2002.

Sincerely, Brian C. McCabe Enclosure cc: J. Zeiler, NRC Sr. Resident Inspector, HNP P. Cox, RAM Branch - Environmental, N.C. DHSR M. Barillas, NRC Project Manager, HNP NRC Regional Administrator, Region II

Shearon Harris Nuclear Power Plant Unit 1 Annual Radioactive Effluent Release Report January 1, 2018 through December 31, 2018 Docket 50-400

Introduction The Annual Radioactive Effluent Release Report is pursuant to Shearon Harris Nuclear Power Plant Technical Specification 6.9.1.4 and ODCM Section F.2. The below listed attachments to this report provide the required information. In addition, the ODCM is included pursuant to Shearon Harris Nuclear Power Plant Technical Specification 6.14.

Attachment 1 Summary of Gaseous and Liquid Effluents Attachment 2 Supplemental Information Attachment 3 Solid Radioactive Waste Disposal Attachment 4 Meteorological Data Attachment 5 Unplanned Offsite Releases Attachment 6 Assessment of Radiation Dose from Radioactive Effluents to Members of the Public Attachment 7 Information to Support the NEI Ground Water Protection Initiative Attachment 8 Inoperable Equipment Attachment 9 Summary of Changes to the Offsite Dose Calculation Manual Attachment 10 Summary of Changes to the Process Control Program Attachment 11 Summary of Major Modifications to the Radioactive Waste Treatment Systems Attachment 12 Errata to a Previous Year's ARERR

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 1 Summary of Gaseous and Liquid Effluents This attachment includes a summary of the quantities of radioactive liquid and gaseous effluents as outlined in Regulatory Guide 1.21, Appendix B.

Page 1-1

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Gaseous Effluents - Summation of All Releases Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Fission and Activation Gases

1. Total Release Ci 0.00E+00 9.13E-02 3.45E-02 3.96E-03 1.30E-01
2. Avg. Release Rate µCi/sec 0.00E+00 1.16E-02 4.35E-03 4.99E-04 4.11E-03 B. Iodine-131
1. Total Release Ci 0.00E+00 8.76E-08 0.00E+00 0.00E+00 8.76E-08
2. Avg. Release Rate µCi/sec 0.00E+00 1.11E-08 0.00E+00 0.00E+00 2.78E-09 C. Particulates Half-Life 8 days
1. Total Release Ci 0.00E+00 1.11E-05 0.00E+00 0.00E+00 1.11E-05
2. Avg. Release Rate µCi/sec 0.00E+00 1.42E-06 0.00E+00 0.00E+00 3.52E-07 D. Tritium
1. Total Release Ci 3.56E+01 3.08E+01 2.82E+01 2.08E+01 1.15E+02
2. Avg. Release Rate µCi/sec 4.58E+00 3.92E+00 3.55E+00 2.62E+00 3.66E+00 E. Gross Alpha
1. Total Release Ci 0.00+00 0.00+00 0.00+00 0.00+00 0.00E+00
2. Avg. Release Rate µCi/sec 0.00+00 0.00+00 0.00+00 0.00+00 0.00E+00 Page 1-2

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Gaseous Effluents - Elevated Releases - Continuous Mode

  • Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Fission and Activation Gases N/A Ci - - - - -

Total for Period Ci - - - - -

B. Iodines N/A Ci - - - - -

Total for Period Ci - - - - -

C. Particulates Half-Life 8 days N/A Ci - - - - -

Total for Period Ci - - - - -

D. Tritium N/A Ci - - - - -

E. Gross Alpha Total for Period Ci - - - - -

  • Shearon Harris Nuclear Power Plant Unit 1 does not have elevated releases.

Page 1-3

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Gaseous Effluents - Elevated Releases - Batch Mode

  • Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Fission and Activation Gases N/A Ci - - - - -

Total for Period Ci - - - - -

B. Iodines N/A Ci - - - - -

Total for Period Ci - - - - -

C. Particulates Half-Life 8 days N/A Ci - - - - -

Total for Period Ci - - - - -

D. Tritium N/A Ci - - - - -

E. Gross Alpha Total for Period Ci - - - - -

  • Shearon Harris Nuclear Power Plant Unit 1 does not have elevated releases.

Page 1-4

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Gaseous Effluents - Ground Releases - Continuous Mode Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Fission and Activation Gases Xe-133 Ci 0.00+00 0.00+00 3.45E-02 3.95E-03 3.85E-02 Total for Period Ci 0.00+00 0.00+00 3.45E-02 3.95E-03 3.85E-02 B. Iodines None Ci - - - - -

Total for Period Ci 0.00+00 0.00+00 0.00+00 0.00+00 0.00E+00 C. Particulates Half-Life 8 days None Ci - - - - -

Total for Period Ci 0.00+00 0.00+00 0.00+00 0.00+00 0.00E+00 D. Tritium H-3 Ci 3.54E+01 3.03E+01 2.82E+01 2.08E+01 1.15E+02 E. Gross Alpha Total for Period Ci 0.00+00 0.00+00 0.00+00 0.00+00 0.00E+00 Page 1-5

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Gaseous Effluents - Ground Releases - Batch Mode Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Fission and Activation Gases Ar-41 Ci 0.00+00 9.11E-02 0.00+00 0.00+00 9.11E-02 Xe-131M Ci 0.00+00 5.78E-05 0.00+00 0.00+00 5.78E-05 Xe-133 Ci 0.00+00 1.24E-04 7.55E-06 1.34E-05 1.45E-04 Total for Period Ci 0.00+00 9.13E-02 7.55E-06 1.34E-05 9.13E-02 B. Iodines I-131 Ci 0.00+00 8.76E-08 0.00+00 0.00+00 8.76E-08 Total for Period Ci 0.00+00 8.76E-08 0.00+00 0.00+00 8.76E-08 C. Particulates Half-Life 8 days Cr-51 Ci 0.00+00 4.51E-06 0.00+00 0.00+00 4.51E-06 Mn-54 Ci 0.00+00 3.49E-07 0.00+00 0.00+00 3.49E-07 Fe-59 Ci 0.00+00 8.00E-08 0.00+00 0.00+00 8.00E-08 Co-58 Ci 0.00+00 2.05E-06 0.00+00 0.00+00 2.05E-06 Co-60 Ci 0.00+00 1.44E-06 0.00+00 0.00+00 1.44E-06 Zr-95 Ci 0.00+00 1.04E-06 0.00+00 0.00+00 1.04E-06 Nb-95 Ci 0.00+00 1.64E-06 0.00+00 0.00+00 1.64E-06 Ru-103 Ci 0.00+00 1.71E-08 0.00+00 0.00+00 1.71E-08 Sb-125 Ci 0.00+00 2.13E-08 0.00+00 0.00+00 2.13E-08 Total for Period Ci 0.00+00 1.11E-05 0.00+00 0.00+00 1.11E-05 D. Tritium H-3 Ci 1.74E-01 4.87E-01 1.36E-04 1.02E-04 6.61E-01 E. Gross Alpha Total for Period Ci 0.00+00 0.00+00 0.00+00 0.00+00 0.00E+00 Page 1-6

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Gaseous Effluents - Mixed-Mode Releases - Continuous Mode

  • Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Fission and Activation Gases N/A Ci - - - - -

Total for Period Ci - - - - -

B. Iodines N/A Ci - - - - -

Total for Period Ci - - - - -

C. Particulates Half-Life 8 days N/A Ci - - - - -

Total for Period Ci - - - - -

D. Tritium N/A Ci - - - - -

E. Gross Alpha Total for Period Ci - - - - -

  • Shearon Harris Nuclear Power Plant Unit 1 does not have mixed-mode releases.

Page 1-7

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Gaseous Effluents - Mixed-Mode Releases - Batch Mode

  • Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Fission and Activation Gases N/A Ci - - - - -

Total for Period Ci - - - - -

B. Iodines N/A Ci - - - - -

Total for Period Ci - - - - -

C. Particulates Half-Life 8 days N/A Ci - - - - -

Total for Period Ci - - - - -

D. Tritium N/A Ci - - - - -

E. Gross Alpha Total for Period Ci - - - - -

  • Shearon Harris Nuclear Power Plant Unit 1 does not have mixed-mode releases.

Page 1-8

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Liquid Effluents - Summation of All Releases Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Fission and Activation Products *

1. Total Release Ci 3.22E-03 3.81E-03 5.31E-04 3.05E-04 7.87E-03
2. Avg. Diluted Conc. µCi/ml 6.43E-10 8.14E-10 1.06E-10 5.97E-11 3.97E-10 B. Tritium
1. Total Release Ci 3.11E+02 8.05E+01 2.23E+01 1.41E+01 4.28E+02
2. Avg. Diluted Conc. µCi/ml 6.22E-05 1.72E-05 4.44E-06 2.75E-06 2.16E-05 C. Dissolved & Entrained Gases
1. Total Release Ci 1.86E-03 0.00E+00 0.00E+00 0.00E+00 1.86E-03
2. Avg. Diluted Conc. µCi/ml 3.72E-10 0.00E+00 0.00E+00 0.00E+00 9.38E-11 D. Gross Alpha
1. Total Release Ci 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
2. Avg. Diluted Conc. µCi/ml 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 E. Volume of Liquid Waste
1. Batch Releases liters 1.24E+06 1.28E+06 1.05E+06 4.65E+05 4.04E+06
2. Continuous Releases liters 1.36E+07 1.37E+07 1.30E+07 1.20E+07 5.22E+07 F. Volume of Dilution Water
1. Batch Releases liters 5.01E+09 4.68E+09 5.02E+09 5.12E+09 1.98E+10
2. Continuous Releases liters 5.01E+09 4.68E+09 5.02E+09 5.12E+09 1.98E+10 Excludes tritium, dissolved and entrained noble gases, and gross alpha.

Page 1-9

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Liquid Effluents - Continuous Mode Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Fission and Activation Products None Ci - - - - -

Total for Period Ci 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 B. Tritium H-3 Ci 1.32E-02 7.10E-02 4.98E-02 4.11E-02 1.75E-01 C. Dissolved & Entrained Gases None Ci - - - - -

Total for Period Ci 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 D. Gross Alpha Total for Period Ci 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 Page 1-10

Attachment 1 Summary of Gaseous and Liquid Effluents Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Liquid Effluents - Batch Mode Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Fission and Activation Products Cr-51 Ci 6.35E-05 1.28E-03 0.00+00 0.00+00 1.34E-03 Mr-54 Ci 1.06E-04 5.45E-05 0.00+00 6.43E-06 1.67E-04 Fe-55 Ci 9.75E-04 4.75E-04 0.00+00 1.33E-04 1.58E-03 Fe-59 Ci 0.00+00 8.53E-06 0.00+00 0.00+00 8.53E-06 Co-58 Ci 3.03E-04 5.81E-04 8.42E-05 6.72E-06 9.75E-04 Co-60 Ci 1.06E-03 9.39E-04 1.96E-04 1.59E-04 2.35E-03 Ni-63 Ci 3.34E-04 8.55E-05 2.51E-04 0.00+00 6.71E-04 As-76 Ci 4.02E-05 0.00+00 0.00+00 0.00+00 4.02E-05 Zr-95 Ci 7.07E-05 1.18E-04 0.00+00 0.00+00 1.89E-04 Nb-95 Ci 1.32E-04 2.21E-04 0.00+00 0.00+00 3.53E-04 Sb-124 Ci 9.95E-06 0.00+00 0.00+00 0.00+00 9.95E-06 Sb-125 Ci 1.23E-04 3.59E-05 0.00+00 0.00+00 1.59E-04 Cs-137 Ci 0.00+00 2.72E-06 0.00+00 0.00+00 2.72E-06 Total for Period Ci 3.22E-03 3.81E-03 5.31E-04 3.05E-04 7.87E-03 B. Tritium H-3 Ci 3.11E+02 8.05E+01 2.23E+01 1.41E+01 4.28E+02 C. Dissolved & Entrained Gases Xe-133 Ci 1.86E-03 0.00+00 0.00+00 0.00+00 1.86E-03 Total for Period Ci 1.86E-03 0.00+00 0.00+00 0.00+00 1.86E-03 Gross Alpha D. Total for Period Ci 0.00+00 0.00+00 0.00+00 0.00+00 0.00E+00 Page 1-11

Attachment 2 Supplemental Information Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 2 Supplemental Information This attachment includes supplemental information to the gaseous and liquid effluents report.

Page 2-1

Attachment 2 Supplemental Information Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 I. Regulatory Limits - Per Unit A. Noble Gases - Air Dose

1. Calendar Quarter Gamma Dose = 5 mRAD
2. Calendar Quarter Beta Dose = 10 mRAD
3. Calendar Year Gamma Dose = 10 mRAD
4. Calendar Year Beta Dose = 20 mRAD B. Liquid Effluents - Dose
1. Calendar Quarter Total Body Dose = 1.5 mREM
2. Calendar Quarter Organ Dose = 5 mREM
3. Calendar Year Total Body Dose = 3 mREM
4. Calendar Year Organ Dose = 10 mREM C. Gaseous Effluents - Iodine-131 & 133, Tritium, and Particulates with Half-lives > 8 days
1. Calendar Quarter Organ Dose = 7.5 mREM
2. Calendar Year Organ Dose = 15 mREM II. Maximum Permissible Effluent Concentrations A. Gaseous Effluents
1. Information found in Offsite Dose Calculation Manual B. Liquid Effluents
1. Information found in 10 CFR Part 20, Appendix B, Table 2, Column 2 III. Average Energy (not applicable)

IV. Measurements and Approximations of Total Radioactivity Analyses of specific radionuclides in selected or composited samples as described in the ODCM are used to determine the radionuclide composition of the effluent. A summary description of the method used for estimating overall errors associated with radioactivity measurements is provided as part of this attachment.

Page 2-2

Attachment 2 Supplemental Information Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 V. Batch Releases A. Liquid Effluents Jan - Jun Jul - Dec

1. Number of Batch Releases = 33 20
2. Total Time Period for Batch Releases = 2.66E+04 min 1.56E+04 min
3. Maximum Time Period for a Batch Release = 8.86E+02 min 1.08E+03 min
4. Average Time Period for a Batch Release = 8.05E+02 min 7.81E+02 min
5. Minimum Time Period for a Batch Release = 7.00E+02 min 5.37E+02 min
6. Average Stream Flow During Release = 9.55E+03 gpm 9.84E+03 gpm Periods B. Gaseous Effluents Jan - Jun Jul - Dec
1. Number of Batch Releases = 29 4
2. Total Time Period for Batch Releases = 2.25E+04 min 1.25E+03 min
3. Maximum Time Period for a Batch Release = 5.51E+03 min 3.46E+02 min
4. Average Time Period for a Batch Release = 7.77E+02 min 3.13E+02 min
5. Minimum Time Period for a Batch Release = 8.90E+01 min 2.67E+02 min VI. Abnormal Releases See Attachment 5, Unplanned Offsite Releases.

Page 2-3

Attachment 2 Supplemental Information Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Carbon-14 The Shearon Harris Nuclear Power Plant 2018 ARERR contains estimates of C-14 radioactivity released in 2018, and estimates of public dose resulting from the C-14 effluent. The concentration and offsite dose from C-14 has been estimated by using a calculation approach, assuming typical or maximum values for the various calculation parameters.

Because the dose contribution of C-14 from liquid radioactive waste is much less than that contributed by gaseous radioactive waste, evaluation of C-14 in liquid radioactive waste is not required (Ref. Reg. Guide 1.21, Rev. 2).

The quantity of gaseous C-14 released to the environment can be estimated by use of a C-14 source term scaling factor based on power generation (Ref. Reg. Guide 1.21, Rev. 2). The Shearon Harris Nuclear Power Plant UFSAR Section 11.1.5 states the expected C-14 generation to be 7.3 Curies assuming 292 effective full power days (EFPD) in a calendar year. For the Shearon Harris Nuclear Power Plant 2018 ARERR, a source term scaling factor using actual EFPD of 324.808 days is assumed. Using the source term scaling factor from Shearon Harris Nuclear Power Plant in 2018 results in a site total C-14 gaseous release estimate to the environment of 8.12 Curies. Due to the reducing environment of a Pressured Water Reactor, only 30% of the C-14 is assumed to be released in the Carbon Dioxide (CO2) form. Dose is not expected from other forms (methane, etc). 70% of the C-14 gaseous effluent is assumed to be from batch releases and the remaining 30% is assumed to be from continuous releases through the plant vent (ref.

IAEA Technical Reports Series no. 421, "Management of Waste Containing Tritium and Carbon-14", 2004).

The resultant offsite doses were based upon this source term and the dose calculations described in NRC Regulatory Guide 1.109, Revision 1, and the Shearon Harris Nuclear Power Plant ODCM. The estimated C-14 dose impact on the maximum organ dose from airborne effluents released from Shearon Harris Nuclear Power Plant in 2018 is well below the 10CFR 50, Appendix I, ALARA design objective (i.e., 15 mrem/yr per unit).

Units 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Year

1. EFPD Days 84.822 56.078 91.936 91.972 324.808
2. C-14 Activity Released Ci 2.12E+00 1.40E+00 2.30E+00 2.30E+00 8.12E+00
3. C-14 Total Body Dose mREM 8.69E-03 5.81E-03 9.73E-03 9.51E-03 3.37E-02
4. C-14 Organ Dose mREM 4.36E-02 2.92E-02 4.88E-02 4.77E-02 1.69E-01 Receptor Location 2.82 km W Critical Age CHILD Critical Organ BONE Page 2-4

Attachment 2 Supplemental Information Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Dose from Returned/Re-used of Previously Discharge Plant Effluents Cooling Tower Plume Tritium in Cooling Tower plume creates an exposure pathway to a member of the public. Murray and Trettle, Inc. was contracted to perform an evaluation of the dose to a member of the public from exposure to tritium in the Cooling Tower plume. Results of the plume exposure are contained in report Impact of Tritium Release from the Cooling Tower at the Harris Nuclear Plant for 2018. Using the methodology described in ODCM 2.3.2, the following is a summary of tritium activity released through the Cooling Tower plume and resulting dose for 2018.

Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year

1. H-3 Activity Released Ci 7.65E-01 5.71E-01 7.18E-01 4.27E-01 2.48E+00
2. H-3 Dose mREM 9.74E-04 7.35E-04 9.34E-04 5.55E-04 3.20E-03 Receptor Location 2.91 km NNE Critical Age CHILD Critical Organ N/A
  • Harris Lake Evaporation Evaporation of water containing tritium in Harris Lake creates an exposure pathway to a member of the public. Murray and Trettle, Inc. was contracted to perform an evaluation of the dose to a member of the public from evaporation of tritium in Harris Lake. Results of the evaluation are contained in report Impact of Tritium Release from the Water Reservoir (Lake Harris) at the Harris Nuclear Plant for 2018. Using the methodology described in ODCM 2.3.3, the following is a summary of tritium activity released through evaporation and resulting dose for 2018.

Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year

1. H-3 Activity Released Ci 3.73E+01 6.53E+01 4.65E+01 1.35E+01 1.63E+02
2. H-3 Dose mREM 1.30E-02 2.28E-02 1.57E-02 4.37E-03 5.59E-02 Receptor Location 6.65 km SSW Critical Age CHILD Critical Organ N/A
  • Drinking Water at Harris Plant and the Harris Energy and Environmental (HE&EC) Training Centers Concentrations of radionuclides used in this specific drinking water pathway are determined by averaging the monthly concentrations detected in environmental location (REMP) DW-51. In 2018, no plant related gamma emitting radionuclides were detected. Tritium was detected each month, as expected. Using the methodology described in ODCM 2.3.1, the following is a summary of average concentration consumed and resulting dose for 2018.

Units Year

1. Avg. H-3 Concentration Ci/L 3.23E+03
2. H-3 Dose mREM 8.86E-02 Critical Age ADULT Critical Organ N/A *
  • The dose factor for H-3 is the same for all organs and Total Body (with the exception of Bone, which is 0.00E+00).

Page 2-5

Attachment 2 Supplemental Information Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Tritium in Fish from Harris Lake Concentrations of radionuclides used in this specific fish consumption pathway are determined by averaging the monthly concentrations detected in environmental location (REMP) SW-26. In 2018, no plant related gamma emitting radionuclides were detected. Tritium was detected each month, as expected. Since tritium is consistently detected in Harris Lake REMP samples, tritium concentration in the fish is assumed to be in equilibrium with Harris Lake. Using the methodology and data described in NRC Regulatory Guide 1.109, Rev.1, October 1977, Equation A-1, Table E-5, and Table E-11, the following is a summary of average concentration consumed and resulting dose for 2018.

Units Year

1. Avg. H-3 Concentration Ci/L 7.47E+03
2. H-3 Dose mREM 1.48E-02 Critical Age ADULT Critical Organ N/A *
  • The dose factor for H-3 is the same for all organs and Total Body (with the exception of Bone, which is 0.00E+00).

Page 2-6

Attachment 2 Supplemental Information Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Overall Estimate of Error for Gaseous Effluent Radioactivity Release Reported The estimated percentage of overall error for Noble Gases in Gaseous effluent release data at Shearon Harris Nuclear Power Plant has been determined to be +/- 52.68%. This value was derived by taking the square root of the sum of the squares of the following discrete individual estimates of error:

1. Counting Standard (20000 counts/energy % error) = +/- 0.1%
2. Calibration Standard = +/- 5.0%
3. Acceptable Counting Statistic for Nuclide ID (R.E.) = +/- 25.0%
4. Sample Volume Variability = +/- 5.0%
5. Stack Flow Rates (Non-steady Release Rates) = +/- 10.0%
6. Rad Monitor Calibration = +/- 20.0%
7. Net Activity Determination from Rad Monitors = +/- 40.0%

The estimated percentage of overall error for Air Particulates in Gaseous effluent release data at Shearon Harris Nuclear Power Plant has been determined to be +/- 33.75%. This value was derived by taking the square root of the sum of the squares of the following discrete individual estimates of error:

1. Counting Standard (20000 counts/energy % error) = +/- 0.1%
2. Calibration Standard = +/- 5.0%
3. Acceptable Counting Statistic for Nuclide ID (R.E.) = +/- 25.0%
4. Sample Flow (Sample Volume) = +/- 10.0%
5. Potential Sample Line Losses = +/- 8.0%
6. Stack Flow Rates (Non-steady Release Rates) = +/- 10.0%
7. Chemical Yield Factors (Sr-89, 90) = +/- 15.0%

The estimated percentage of overall error for Iodine on Charcoal Filters in Gaseous effluent release data at Shearon Harris Nuclear Power Plant has been determined to be +/- 30.38%. This value was derived by taking the square root of the sum of the squares of the following discrete individual estimates of error:

1. Counting Standard (20000 counts/energy % error) = +/- 0.1%
2. Calibration Standard = +/- 5.0%
3. Acceptable Counting Statistic for Nuclide ID (R.E.) = +/- 25.0%
4. Sample Flow (Sample Volume) = +/- 10.0%
5. Potential Sample Line Losses = +/- 8.0%
6. Stack Flow Rates (Non-steady Release Rates) = +/- 10.0%
7. Collection Efficiency = +/- 3.0%

The estimated percentage of overall error for Tritium in Gaseous effluent release data at Shearon Harris Nuclear Power Plant has been determined to be +/- 52.20%. This value was derived by taking the square root of the sum of the squares of the following discrete individual estimates of error:

1. Counting Standard (20000 counts/energy % error) = +/- 0.1%
2. Calibration Standard = +/- 5.0%
3. Acceptable Counting Statistic for Nuclide ID (R.E.) = +/- 50.0%
4. Stack Flow Rates (Non-steady Release Rates) = +/- 10.0%
5. Collection Efficiency = +/- 10.0%

Page 2-7

Attachment 2 Supplemental Information Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Overall Estimate of Error for Liquid Effluent Radioactivity Release Reported The estimated percentage of overall error for Fission and Activation Products in Liquid effluent release data at Shearon Harris Nuclear Power Plant has been determined to be +/- 32.79%. This value was derived by taking the square root of the sum of the squares of the following discrete individual estimates of error:

1. Counting Standard (20000 counts/energy % error) = +/- 0.1%
2. Calibration Standard = +/- 5.0%
3. Acceptable Counting Statistic for Nuclide ID (R.E.) = +/- 25.0%
4. Sample (sample volume between techs) = +/- 5.0%
5. Volume Determinations (Tank Level) = +/- 20.0%

The estimated percentage of overall error for Tritium in Liquid effluent release data at Shearon Harris Nuclear Power Plant has been determined to be +/- 54.31%. This value was derived by taking the square root of the sum of the squares of the following discrete individual estimates of error:

1. Counting Standard (20000 counts/energy % error) = +/- 0.1%
2. Calibration Standard = +/- 5.0%
3. Acceptable Counting Statistic for Nuclide ID (R.E.) = +/- 50.0%
4. Sample (sample volume between techs) = +/- 5.0%
5. Volume Determinations (Tank Level) = +/- 20.0%

Page 2-8

Attachment 2 Supplemental Information Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Overall Estimate of Error for Solid Waste Radioactivity Reported The estimated percentage of overall error for Solid Waste data at Shearon Harris Nuclear Power Plant has been determined to be +/- 96%. This value was derived by taking the square root of the sum of the squares of the following discrete individual estimates of error:

1. Counting Standard (20000 counts/energy % error) = < +/- 0.1%
2. Calibration Standard = +/- 5.0%
3. Acceptable Counting Statistic for Nuclide ID (R.E.) = +/- 95.0%
4. Sample Volume Variability = +/- 0.001%
5. Instrument Errors = +/- 5.0%
6. Dose Rate Measurement = +/- 10.0%
7. Geometry = +/- 5.0%
8. Volume Determinations = +/- 5.0%
9. RADMAN Database (sample analysis variance) = +/- 0.96%

Page 2-9

Attachment 2 Supplemental Information Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Summary of Changes in Land Use Census Affecting Effluent Dose Calculations The 2018 Land Use Census was performed July 24-25, 2018. The following are changes to residences, gardens, and milk animals from the previous year.

RESIDENCES

  • The residence in the NE Sector (2.43 miles) was replaced by a new residence at 2.29 miles.

GARDENS NOTE: There were no gardens identified by the census as being irrigated from Harris Lake (Shearon Harris Reservoir).

  • The garden in the ENE sector (2.06 miles) was not cultivated this year (2018) and a replacement garden could not be located in this sector.
  • The garden in the W sector (2.75 miles) was not cultivated this year (2018) and was replaced with a garden at 4.19 miles.
  • The garden in the WNW sector (4.33 miles) was replaced with a garden at 3.75 miles.

MEAT ANIMALS NOTE: Meat animals were only identified at the nearest garden or closer in each sector, and poultry and egg laying animals were not classified as meat animals for the 2018 census.

  • The meat animals (goats) in the SE sector at 4.11 miles were no longer present.

MILK ANIMALS

  • The milk animals (goats) located in the N sector (4.14 miles) were still present, and the owner indicated they are now processing enough milk to participate in the REMP. This dairy is not required to be added to the REMP due to HNP already having a dairy within 5 km (3.11 miles) and the dose being <1.0 mRem/year.
  • The milk animals (goats) located in the W sector (2.82 miles) were still present, and currently participate in the HNP REMP Environmental Program. The goat milk is used to feed goat kids during the breeding months, and the remainder is consumed by the family. They also give the non-consumable milk to someone who makes soap.

No other changes to environmental monitoring locations in each sector.

Page 2-10

Attachment 3 Solid Radioactive Waste Disposal Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 3 Solid Radioactive Waste Disposal This attachment includes a summary of the solid waste shipped off-site for burial and/or disposal, including:

  • Container volume
  • Total Curie content
  • Principal Radionuclides
  • Source/Type of waste
  • Solidification agent or absorbent
  • Type of shipping container
  • Number of shipments
  • Other relevant information as necessary Page 3-1

Attachment 3 Solid Radioactive Waste Disposal Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018

1. Solid Waste Shipped for Burial or Disposal (WASTE CLASS A)

NOTE: Values reported in Table 3 section 1.A.a, b, c & 1.B.a, b, c refer to radioactive solid waste materials shipped in 2018 to a vendor for processing and subsequent burial.

A. Type of Waste

a. Spent resins.

Note:

  • No waste of this type was shipped during the report period.
b. Dry Active Waste (DAW), mechanical filters, contaminated equipment, etc.

Note: Waste shipped in 2018 for processing and subsequent burial.

Number of Shipments 4 Activity Shipped 5.97 E-01 Curies Estimated Total Error 96%

Quantity Shipped 152.094 m3 Solidification Agent N/A Container Type General Design Shipment Form Compacted, Non-Compacted

c. Irradiated components, control rods, etc. (Ex-core detector)

Note: Waste shipped in 2018 for processing and subsequent burial.

Number of Shipments 1 Activity Shipped 6.78 E-02 Curies Estimated Total Error 96%

Quantity Shipped 0.02 m3 Solidification Agent N/A Container Type General Design Shipment Form Macro-Encapsulation

d. Other: GAC Vessels Note: Waste shipped in 2018 for processing and subsequent burial.

Number of Shipments 1 Activity Shipped 2.01 E-01 Curies Estimated Total Error 96%

Quantity Shipped 1.26 m3 Solidification Agent N/A Container Type General Design Shipment Form Dewatered, Non- Compacted Page 3-2

Attachment 3 Solid Radioactive Waste Disposal Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018

1. Solid Waste Shipped for Burial or Disposal (WASTE CLASS A)

B. Estimate of Major Nuclide Composition (by type of Waste)

a. Spent Radwaste Bead Resin.
  • No waste of this type was shipped during this report period.
b. Dry Active Waste (DAW), mechanical filters, contaminated equipment, etc.

Note: Waste shipped in 2018 for processing and subsequent burial.

Class A DAW Totals Isotope Activity(mci) Activity Abundance (Ci)

C-14 2.46E+00 2.46E-03 0.41%

Ce-144 3.28E+00 3.28E-03 0.55%

Co-58 1.31E+01 1.31E-02 2.20%

Co-60 9.81E+01 9.81E-02 16.42%

Cr-51 2.73E+01 2.73E-02 4.56%

Cs-137 5.53E+00 5.53E-03 0.93%

Fe-55 1.28E+02 1.28E-01 21.38%

H-3 4.58E+01 4.58E-02 7.67%

I-129 1.61E-01 1.61E-04 0.03%

Mn-54 7.15E+00 7.15E-03 1.20%

Nb-95 1.38E+02 1.38E-01 23.03%

Ni-63 1.33E+01 1.33E-02 2.22%

Sb-125 1.72E+00 1.72E-03 0.29%

Sr-90 1.34E-01 1.34E-04 0.02%

Tc-99 1.99E+00 1.99E-03 0.33%

Zr-95 1.12E+02 1.12E-01 18.75%

Grand Total 5.97E+02 5.97E-01 100.00%

Page 3-3

Attachment 3 Solid Radioactive Waste Disposal Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018

1. Solid Waste Shipped for Burial or Disposal (WASTE CLASS A)

B. Estimate of Major Nuclide Composition (by type of Waste)

c. Irradiated components, control rods, etc.

Note: Waste shipped in 2018 for processing and subsequent burial.

Irradiated Components Total Isotope Activity(mci) Activity (Ci) Abundance C-14 1.55E-02 1.55E-05 0.02%

Co-58 9.00E-03 9.00E-06 0.01%

Co-60 5.25E+01 5.25E-02 77.46%

Cr-51 3.89E-01 3.89E-04 0.57%

Cs-137 5.12E-06 5.12E-09 0.00%

Fe-55 8.60E+00 8.60E-03 12.69%

Fe-59 2.63E-02 2.63E-05 0.04%

H-3 2.75E-05 2.75E-08 0.00%

I-129 1.31E-07 1.31E-10 0.00%

Mn-54 2.85E-02 2.85E-05 0.04%

Nb-95 1.72E-05 1.72E-08 0.00%

Ni-63 1.84E-01 1.84E-04 0.27%

Tc-99 1.52E-06 1.52E-09 0.00%

Zr-95 8.76E-06 8.76E-09 0.00%

Ni-59 1.35E-03 1.35E-06 0.00%

Zn-65 6.02E+00 6.02E-03 8.88%

Nb-94 1.21E-04 1.21E-07 0.00%

Grand Total 6.78E+01 6.78E-02 100.00%

Page 3-4

Attachment 3 Solid Radioactive Waste Disposal Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018

1. Solid Waste Shipped for Burial or Disposal (WASTE CLASS A)

B. Estimate of Major Nuclide Composition (by type of Waste)

d. Other Note: Waste shipped in 2018 for processing and subsequent burial.

GAC Total Isotope Activity(mci) Activity (Ci) Abundance C-14 1.81E+00 1.81E-03 0.90%

Ce-144 2.00E-01 2.00E-04 0.10%

Co-58 2.38E+00 2.38E-03 1.18%

Co-60 3.93E+01 3.93E-02 19.55%

Cs-137 2.15E-01 2.15E-04 0.11%

Fe-55 3.24E+01 3.24E-02 16.11%

H-3 3.72E+01 3.72E-02 18.50%

I-129 8.76E-03 8.76E-06 0.00%

Mn-54 1.14E+00 1.14E-03 0.57%

Nb-95 1.19E-01 1.19E-04 0.06%

Ni-63 8.49E+01 8.49E-02 42.23%

Sb-125 7.38E-01 7.38E-04 0.37%

Tc-99 8.28E-02 8.28E-05 0.04%

Am-241 2.86E-02 2.86E-05 0.01%

Pu-241 5.43E-01 5.43E-04 0.27%

Grand Total 2.01E+02 2.01E-01 100.00%

C. Solid Waste Disposal Number of Shipments 6 Mode of Transportation Truck Destination Energy Solutions Note: Waste shipped in 2018 for processing and subsequent burial Page 3-5

Attachment 3 Solid Radioactive Waste Disposal Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018

2. Solid Waste Shipped for Burial or Disposal (WASTE CLASS B)

A. Type of Waste

a. Spent resins.

No waste of this type was shipped during this Report Period.

b. Dry Active Waste (DAW), mechanical filters, contaminated equipment, etc.
  • No waste of this type was shipped during this Report Period.
c. Irradiated components, control cods, etc.
  • No waste of this type was shipped during this Report Period.
d. Other (Describe)
  • No waste of this type was shipped during this Report Period.

B. Estimate of Major Nuclide Composition (by type of Waste)

a. Dry Active Waste (DAW), mechanical filters, contaminated equipment, etc.
  • No waste of this type was shipped during this Report Period.

C. Solid Waste Disposal

  • No waste of this type was shipped during this Report Period.

Page 3-6

Attachment 3 Solid Radioactive Waste Disposal Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018

3. Solid Waste Shipped for Burial or Disposal (WASTE CLASS C)

A. Type of Waste

a. Spent resins, filter sludges, evaporator bottoms, etc.

No waste of this type was shipped during this Report Period.

b. Dry Active Waste (DAW), mechanical filters, contaminated equipment, etc.

No waste of this type was shipped during this Report Period.

c. Irradiated Components, Control Rods, etc.

No waste of this type was shipped during this Report Period.

d. Other (Describe)

No waste of this type was shipped during this Report Period.

B. Estimate of Major Nuclide Composition (by type of Waste)

  • No waste of this type was shipped during this Report Period.

C. Solid Waste Disposal

  • No waste of this type was shipped during this Report Period.

Page 3-7

Attachment 4 Meteorological Data Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 4 Meteorological Data This attachment includes a summary of meteorological joint frequency distributions of wind speed, wind direction, and atmospheric stability (hours of occurrence).

Page 4-1

Attachment 4 Meteorological Data Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Wind Hours of Occurrence Stability Speed Sector Class (m/s) N NNE NE ENE E ESE SE SSE S SSW SW WSW W WNW NW NNW 0.50-0.75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.76-1.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.01-1.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.26-1.50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.51-2.00 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.01-3.00 0 0 1 8 3 0 0 0 1 0 0 0 0 0 0 0 A

3.01-4.00 1 0 4 0 1 1 0 0 2 2 0 2 1 1 0 0 4.01-5.00 0 1 0 1 0 0 0 0 0 2 6 0 1 0 0 0 5.01-6.00 0 0 0 0 0 0 0 0 0 4 1 0 0 0 0 0 6.01-8.00 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 8.01-10.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.01-Max 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.50-0.75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.76-1.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.01-1.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.26-1.50 0 0 0 1 0 0 1 0 0 0 0 0 0 0 2 0 1.51-2.00 0 0 1 4 4 7 2 0 5 1 1 2 2 3 2 1 2.01-3.00 4 11 8 17 18 2 2 4 17 4 2 9 3 4 7 11 B

3.01-4.00 3 12 8 4 1 0 2 5 14 7 4 3 2 3 4 4 4.01-5.00 2 6 0 0 0 0 0 1 0 3 8 7 2 2 3 8 5.01-6.00 2 0 0 0 0 0 0 0 0 2 5 4 0 1 4 1 6.01-8.00 0 0 0 0 0 0 0 0 0 1 1 1 0 1 4 0 8.01-10.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.01-Max 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Page 4-2

Attachment 4 Meteorological Data Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Hours of Occurrence Wind Stability Sector Speed Class SS (m/s) N NNE NE ENE E ESE SE SSE S SW WSW W WNW NW NNW W

0.50-0.75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.76-1.00 0 1 0 0 1 0 0 0 1 0 0 0 1 0 0 1 1.01-1.25 0 1 2 1 1 1 0 1 1 1 2 2 1 2 0 0 1.26-1.50 0 3 0 3 2 4 4 1 2 4 4 4 2 1 4 2 1.51-2.00 2 5 7 17 6 11 7 14 10 7 14 10 14 7 3 9 2.01-3.00 14 18 14 15 15 13 6 15 32 26 20 43 17 13 21 16 C

3.01-4.00 8 13 3 5 2 0 0 2 16 14 22 27 15 9 13 6 4.01-5.00 4 6 3 1 0 0 0 1 4 6 15 7 5 17 10 10 5.01-6.00 0 0 0 0 0 0 0 0 0 8 3 6 0 3 5 1 6.01-8.00 0 0 0 0 0 0 0 0 0 1 0 1 0 0 2 1 8.01-10.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.01-Max 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.50-0.75 5 9 10 5 3 3 3 5 3 11 3 6 5 4 7 6 0.76-1.00 7 19 12 7 13 8 6 9 8 14 14 24 12 6 4 9 1.01-1.25 12 14 24 14 21 5 18 16 14 14 21 16 14 11 8 8 1.26-1.50 26 11 33 29 15 14 18 26 27 22 22 27 17 19 18 15 1.51-2.00 48 62 73 54 42 28 29 55 45 64 44 43 40 26 28 36 2.01-3.00 87 99 100 53 34 30 28 55 122 108 119 106 71 47 48 72 D

3.01-4.00 61 48 38 11 13 15 1 11 56 42 61 49 21 45 33 49 4.01-5.00 21 21 13 7 3 10 2 4 12 37 28 16 9 12 22 20 5.01-6.00 3 6 4 0 0 3 1 1 4 24 12 9 2 6 6 8 6.01-8.00 0 9 0 0 0 0 1 1 5 4 0 3 0 1 2 4 8.01-10.00 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 10.01-Max 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 Page 4-3

Attachment 4 Meteorological Data Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Wind Hours of Occurrence Stability Speed Sector Class (m/s) N NNE NE ENE E ESE SE SSE S SSW SW WSW W WNW NW NNW 0.50-0.75 11 17 17 13 13 8 8 8 7 14 11 13 13 6 8 11 0.76-1.00 9 16 33 18 21 22 16 13 11 16 13 19 12 14 6 12 1.01-1.25 27 21 27 29 20 19 15 23 20 20 14 9 8 8 4 11 1.26-1.50 21 19 22 28 24 11 13 18 26 33 20 13 16 6 9 14 1.51-2.00 41 29 22 19 18 11 13 29 37 50 43 29 22 21 16 17 2.01-3.00 21 12 13 11 10 4 4 21 58 100 37 27 10 22 18 23 E

3.01-4.00 1 1 1 3 5 1 0 4 15 37 11 5 1 6 1 3 4.01-5.00 0 1 4 19 1 0 0 0 4 10 7 3 1 4 0 0 5.01-6.00 0 1 2 3 0 0 0 0 0 2 0 0 0 3 0 0 6.01-8.00 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 8.01-10.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.01-Max 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.50-0.75 14 28 25 19 16 9 2 6 6 4 8 4 3 4 6 13 0.76-1.00 11 16 20 33 13 8 12 8 5 10 7 7 6 6 4 6 1.01-1.25 8 8 10 11 4 2 6 7 5 4 4 4 10 6 4 4 1.26-1.50 14 6 0 3 1 1 3 1 1 3 6 4 1 4 2 5 1.51-2.00 12 4 2 3 0 0 0 1 2 3 0 2 3 3 1 1 2.01-3.00 1 0 0 0 0 0 1 0 0 1 0 0 0 0 0 1 F

3.01-4.00 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 4.01-5.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.01-6.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.01-8.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.01-10.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.01-Max 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Page 4-4

Attachment 4 Meteorological Data Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Wind Hours of Occurrence Stability Speed Sector Class (m/s) N NNE NE ENE E ESE SE SSE S SSW SW WSW W WNW NW NNW 0.50-0.75 42 35 48 40 12 8 12 6 1 3 1 8 10 9 17 27 0.76-1.00 14 10 13 12 11 1 4 1 2 6 5 6 1 4 8 18 1.01-1.25 3 2 4 4 1 0 0 0 0 0 1 3 1 0 6 6 1.26-1.50 2 2 0 3 1 0 1 0 0 1 0 0 0 0 2 1 1.51-2.00 1 1 2 0 0 0 0 0 0 1 1 1 0 0 1 1 2.01-3.00 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G

3.01-4.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.01-5.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.01-6.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.01-8.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.01-10.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.01-Max 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Page 4-5

Attachment 5 Unplanned Offsite Releases Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 5 Unplanned Offsite Releases This attachment includes a summary of the unplanned offsite releases of gaseous and liquid radioactive effluents.

Page 5-1

Attachment 5 Unplanned Offsite Releases Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Shearon Harris Nuclear Power Plant had zero (0) unplanned liquid release in 2018.

Shearon Harris Nuclear Power Plant had zero (0) unplanned gaseous release in 2018.

Page 5-2

Attachment 6 Assessment of Radiation Dose from Radioactive Effluents to Members of the Public Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 6 Assessment of Radiation Dose from Radioactive Effluents to Members of the Public (includes fuel cycle dose calculation results)

This attachment includes an assessment of radiation doses to the maximum exposed member of the public due to radioactive liquid and gaseous effluents released from the site for each calendar quarter for the calendar year of the report as well as the total dose for the calendar year.

This attachment also includes an assessment of radiation doses to the maximum exposed member of the public from all uranium fuel cycle sources within 8 km of the site for the calendar year of this report to show conformance with 40 CFR Part 190.

Methods for calculating the dose contribution from liquid and gaseous effluents are given in the Offsite Dose Calculation Manual (ODCM).

Page 6-1

Attachment 6 Assessment of Radiation Dose from Radioactive Effluents to Members of the Public Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Gaseous Effluents Dose Summary Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Noble Gases

1. Maximum Gamma Air mRAD 0.00E+00 4.84E-04 6.96E-06 7.98E-07 4.91E-04 (a) Limit mRAD 5.00E+00 5.00E+00 5.00E+00 5.00E+00 1.00E+01 (b) % of Limit 0.00E+00 9.67E-03 1.39E-04 1.60E-05 4.91E-03
2. Maximum Beta Air mRAD 0.00E+00 1.71E-04 2.07E-05 2.37E-06 1.94E-04 (a) Limit mRAD 1.00E+01 1.00E+01 1.00E+01 1.00E+01 2.00E+01 (b) % of Limit 0.00E+00 1.71E-03 2.07E-04 2.37E-05 9.69E-04 Receptor Location 2.14 km SW B. Iodine, H-3, & Particulates
1. Maximum Organ Dose mREM 1.42E-01 1.23E-01 1.12E-01 8.29E-02 4.60E-01 (a) Limit mREM 7.50E+00 7.50E+00 7.50E+00 7.50E+00 1.50E+01 (b) % of Limit 1.89E+00 1.64E+00 1.50E+00 1.11E+00 3.06E+00 Receptor Location 2.14 km SW Critical Age CHILD Critical Organ LUNG Page 6-2

Attachment 6 Assessment of Radiation Dose from Radioactive Effluents to Members of the Public Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Liquid Effluents Dose Summary Units Qtr 1 Qtr 2 Qtr 3 Qtr 4 Year A. Batch Mode

1. Maximum Organ Dose mREM 2.22E-02 2.53E-02 8.76E-04 2.16E-04 4.86E-02 (a) Limit mREM 5.00E+00 5.00E+00 5.00E+00 5.00E+00 1.00E+01 (b) % of Limit 4.44E-01 5.06E-01 1.75E-02 4.32E-03 4.86E-01
2. Maximum Total Body Dose mREM 1.33E-02 4.73E-03 8.43E-04 1.97E-04 1.91E-02 (a) Limit mREM 1.50E+00 1.50E+00 1.50E+00 1.50E+00 3.00E+00 (b) % of Limit 8.86E-01 3.15E-01 5.62E-02 1.32E-02 6.35E-01 Critical Age ADULT Critical Organ GILLI Page 6-3

Attachment 6 Assessment of Radiation Dose from Radioactive Effluents to Members of the Public Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 40 CFR Part 190 Uranium Fuel Cycle Dose Calculation Results In accordance with the requirements of 40 CFR Part 190, the annual dose commitment to any member of the general public shall be calculated to assure that doses are limited to 25 millirem to the total body or any organ with the exception of the thyroid which is limited to 75 millirem. The fuel cycle dose assessment for Shearon Harris Nuclear Power Plant includes liquid and gaseous effluent dose contributions from the plant. Direct and air-scatter dose from the reactor building and other onsite structures does not contribute measurable dose to the maximum exposed individual based on review of the 2018 environmental TLD data. No other uranium fuel cycle facility contributes significantly to the maximum exposed individual. Included below is an estimate of the dose contributed by Carbon-14 (Ref. Attachment 2, Supplemental Information, of this report for further information). Also included is dose from H-3 in the Shearon Harris Nuclear Power Plant Cooling Tower plume, evaporation of H-3 in Harris Lake, H-3 in on-site drinking water, and H-3 in fish from Harris Lake. The combined dose to a maximum exposed individual from effluent releases, combined with the additional dose pathways, is below 40 CFR Part 190 limits as shown by the following summary.

Note: The 40 CFR Part 190 effluent dose analysis to the maximum exposed individual from liquid and gas releases does not include the dose from noble gases (i.e., total body and skin) due to the low significance compared to other dose pathways.

40 CFR Part 190 Effluent Dose Summary A. Gaseous Effluent Dose E. Harris Lake Evaporation H-3 Dose

1. Location 2.14 km SW 1. Location 6.65 km SSW
2. Critical Age CHILD 2. Critical Age CHILD
3. Critical Organ LUNG 3. Critical Organ N/A
4. Organ Dose (mREM) 4.60E-01 4. Organ Dose (mREM) 5.59E-02
5. Total Body Dose (mREM) 4.60E-01 5. Total Body Dose (mREM) 5.59E-02 B. Liquid Effluent Dose F. Drinking Water H-3 Dose
1. Location 2.19 km S 1. Location Harris Plant
2. Critical Age ADULT 2. Critical Age ADULT
3. Critical Organ GI-LLI 3. Critical Organ N/A
4. Organ Dose (mREM) 4.86E-02 4. Organ Dose (mREM) 8.86E-02
5. Total Body Dose (mREM) 1.91E-02 5. Total Body Dose (mREM) 8.86E-02 C. Carbon-14 Dose G. H-3 in Fish from Harris Lake
1. Location 2.82 km W 1. Location Harris Lake
2. Critical Age CHILD 2. Critical Age ADULT
3. Critical Organ BONE 3. Critical Organ N/A
4. Organ Dose (mREM) 1.69E-01 4. Organ Dose (mREM) 1.48E-02
5. Total Body Dose (mREM) 3.37E-02 5. Total Body Dose (mREM) 1.48E-02 D. Cooling Tower Plume H-3 Dose
1. Location 2.91 km NNE
2. Critical Age CHILD
3. Critical Organ N/A
4. Organ Dose (mREM) 3.20E-03
5. Total Body Dose (mREM) 3.20E-03 Page 6-4

Attachment 6 Assessment of Radiation Dose from Radioactive Effluents to Members of the Public Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Total dose from liquid and gaseous effluents from Shearon Harris Nuclear Power Plant and the additional pathways mentioned above is conservatively estimated to be less than 2 mrem/yr for total body and organ. It is recognized summing dose for different organs and age groups is not entirely accurate. However, the sum of the organ and age specific doses will always be less than the sum of the maximums of each. Therefore, summing the maximum values of each provides the most conservative value to ensure compliance with 40 CFR 190. The dose from all pathways related to operation of Shearon Harris Nuclear Power Plant meets the 40 CFR Part 190 requirements of an annual dose commitment to any member of the general public of less than 25 mrem total body or any organ and 75 mrem to the thyroid.

Page 6-5

Attachment 7 Information to Support the NEI Ground Water Protection Initiative Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 7 Information to Support the NEI Ground Water Protection Initiative This attachment includes a summary of voluntary reports made in accordance with the NEI Ground Water Protection Initiative and a summary of ground water well sample data.

Page 7-1

Attachment 7 Information to Support the NEI Ground Water Protection Initiative Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 Samples were taken at various locations throughout the plant in support of the Groundwater Protection Initiative.

Samples included Groundwater Monitoring Wells along the Cooling Tower Blowdown Line, Storm Drains, Vaults and Yard Drains that could potentially affect groundwater. None of the vaults, yard drains, or storm drains indicated plant related gamma emitters or tritium above the investigation limit. HNP Self Assessment (AR-0202000) determined Groundwater Monitoring location #76 did not meet the requirements for waterborne monitoring, so in September 2016 it was removed from the site's Radiological Environmental Monitoring Program (REMP). The well is located within the protected area and is not used as a source of drinking water or irrigation, thus is not a potential dose pathway. In addition, in June 2015 12 new groundwater monitoring wells were installed near the site's Waste Neutralization Basin.

These wells are not listed in the ODCM or part of the REMP. The data for these wells are located below. Per NEI 07-07 the results of the Groundwater Monitoring Wells were included in the REMP and are not listed in this report but included in the AREOR.

Results from sampling during 2018 are shown in the table below.

Tritium Concentration (Ci/L)

Well # 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr # Samples 76 404 350 <MDA 242 4 HMW1S 430 453 291 289 4 HMW2S 250 <MDA <MDA <MDA 4 HMW3S <MDA <MDA <MDA <MDA 4 HMW4D <MDA <MDA <MDA <MDA 4 HMW4S 173 <MDA <MDA <MDA 4 HMW5S <MDA <MDA <MDA <MDA 4 HMW6S 330 318 226 274 4 HMW7S <MDA <MDA <MDA <MDA 4 HMW8S <MDA 188 <MDA <MDA 4 HMW9S <MDA <MDA <MDA <MDA 4 HMW10S <MDA <MDA <MDA <MDA 4 HMW11S <MDA <MDA <MDA <MDA 4 NOTE: Minimum Detectible Activity (MDA) for monitoring wells is approximately 185 Ci/L Zero (0) events meeting the criteria for voluntary notification per NEI 07-07, Industry Ground Water Protection Initiative, occurred at Shearon Harris Nuclear Power Plant in 2018.

Page 7-2

Attachment 8 Inoperable Equipment Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 8 Inoperable Equipment This attachment includes an explanation of inoperable instruments related to effluent monitoring in excess of allowed time defined by licensing bases and an explanation of temporary outside liquid storage tanks exceeding 10 Curies total activity (excluding tritium and dissolved or entrained noble gases).

Page 8-1

Attachment 8 Inoperable Equipment Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 On December 15, 2017, the Radwaste Control Room's radiation monitor computer system (RM-11) failed and was unable to be rebooted (NCR 2172597). The loss of the RM-11 required making seven effluent radiation monitors inoperable due to the inability of the RM-11 computer system to indicate an alarm condition. The affected effluent radiation monitors were: REM-01SW-3500A (WPB Service Water Return), REM-1WL-3540 (TL&HS Tank Effluent),

REM-21WL-3541 (Waste Monitor Tank Effluent), REM-21WS-3542 (Secondary Waste Sample Tank Effluent), REM-1WV-3546 (Stack 5 PIG), REM-1WV-3546-1 (Stack 5 WRGM), REM-1WV-3547-1 (Stack 5A WRGM). The RM-11 computer system was repaired and the monitors returned to service on January 5, 2018 (Work Order 20219799). None of the affected radiation monitors were out of service in excess of 30 days.

On March 21, 2018 at 00:54 the radiation monitor REM-1MD-3528 (Turbine Building Drains) was declared inoperable to support the installation of temporary power for Refueling Outage 21. The temporary power prevented the radiation monitor from isolating industrial waste releases and shutting down the Turbine Building Sump Pumps (LCOTR T 00264). The ability for the radiation monitor to provide its trip function is a required function for this monitor in ODCM Table 3.3-12. The temporary power was removed and the monitors trip function was restored to service on April 28, 2018 at 07:16.

Shearon Harris Nuclear Power Plant did not experience temporary outside liquid storage tanks exceeding 10 Curies total activity (excluding tritium and dissolved or entrained noble gases) during 2018.

Page 8-2

Attachment 9 Summary of Changes to the Offsite Dose Calculation Manual Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 9 Summary of Changes to the Offsite Dose Calculation Manual This attachment includes a summary of changes to the ODCM.

Page 9-1

Attachment 9 Summary of Changes to the Offsite Dose Calculation Manual Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 The Offsite Dose Calculation Manual (ODCM) was not revised in 2018.

Page 9-2

Attachment 10 Summary of Changes to the Process Control Program Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 10 Summary of Changes to the Process Control Program This attachment includes a summary of changes to the PCP.

Page 10-1

Attachment 10 Summary of Changes to the Process Control Program Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 The Process Control Program (PCP) was not revised in 2018.

Page 10-2

Attachment 11 Summary of Major Modifications to the Radioactive Waste Treatment Systems Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 11 Summary of Major Modifications to the Radioactive Waste Treatment Systems This attachment includes a description of major modifications to the radioactive waste treatment systems that are anticipated to affect effluent releases.

Page 11-1

Attachment 11 Summary of Major Modifications to the Radioactive Waste Treatment Systems Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 There were no major modifications to Shearon Harris Nuclear Power Plant liquid or solid waste treatment systems in 2018.

Page 11-2

Attachment 12 Errata to a Previous Year's ARERR Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 ATTACHMENT 12 Errata to a Previous Year's ARERR This attachment includes any amended pages from a previous year's ARERR.

Page 12-1

Attachment 12 Errata to a Previous Year's ARERR Shearon Harris Nuclear Power Plant Unit 1 Period 1/1/2018 - 12/31/2018 There were no changes to a previous year's Annual Radiological Effluent Release Report.

Page 12-2