Category:Environmental Monitoring Report
MONTHYEARRA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0098, Annual Environmental (Nonradiological) Operating Report2023-04-19019 April 2023 Annual Environmental (Nonradiological) Operating Report RA-22-0136, Annual Environmental (Nonradiological) Operating Report2022-04-29029 April 2022 Annual Environmental (Nonradiological) Operating Report RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 20212022-04-27027 April 2022 Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 RA-21-0279, Notification of New NPDES Permit Receipt2021-10-14014 October 2021 Notification of New NPDES Permit Receipt RA-21-0131, Annual Environmental (Non-radiological) Operating Report2021-04-27027 April 2021 Annual Environmental (Non-radiological) Operating Report RA-20-0138, Annual Environmental (Non-Radiological) Operating Report for 20192020-04-30030 April 2020 Annual Environmental (Non-Radiological) Operating Report for 2019 RA-19-0191, Annual Environmental (Non-radiological) Operating-Report for 2018, Docket No. 50-400/Renewed License No. NPF-632019-04-25025 April 2019 Annual Environmental (Non-radiological) Operating-Report for 2018, Docket No. 50-400/Renewed License No. NPF-63 RA-19-0135, Annual Radioactive Effluent Release Report2019-04-24024 April 2019 Annual Radioactive Effluent Release Report HNP-18-042, Annual Environmental (Non-radiological) Operating Report2018-04-30030 April 2018 Annual Environmental (Non-radiological) Operating Report HNP-18-031, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report HNP-18-032, Annual Radiological Environmental Operating Report2018-04-25025 April 2018 Annual Radiological Environmental Operating Report HNP-17-023, Annual Radioactive Effluent Release Report2017-04-28028 April 2017 Annual Radioactive Effluent Release Report HNP-17-024, Annual Environmental (Nonradiological) Operating Report2017-04-28028 April 2017 Annual Environmental (Nonradiological) Operating Report HNP-16-022, Annual Radiological Environmental Operating Report2016-04-29029 April 2016 Annual Radiological Environmental Operating Report HNP-16-023, Annual Radioactive Effluent Release Report for 20152016-04-27027 April 2016 Annual Radioactive Effluent Release Report for 2015 HNP-16-024, Annual Environmental (Non-Radiological) Operating Report for 20152016-04-26026 April 2016 Annual Environmental (Non-Radiological) Operating Report for 2015 HNP-15-031, Annual Environmental (Nonradiological) Operating Report for 20142015-04-27027 April 2015 Annual Environmental (Nonradiological) Operating Report for 2014 HNP-15-030, Annual Radiological Environmental Operating Report for 20142015-04-27027 April 2015 Annual Radiological Environmental Operating Report for 2014 HNP-15-029, Annual Radioactive Effluent Release Report for 20142015-04-16016 April 2015 Annual Radioactive Effluent Release Report for 2014 HNP-14-039, Annual Environmental (Nonradiological) Operating Report2014-04-25025 April 2014 Annual Environmental (Nonradiological) Operating Report HNP-14-038, Annual Radiological Environmental Operating Report for 20132014-04-24024 April 2014 Annual Radiological Environmental Operating Report for 2013 HNP-13-039, Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B2013-04-19019 April 2013 Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B HNP-13-031, Flooding Hazard Reevaluation Report2013-03-12012 March 2013 Flooding Hazard Reevaluation Report HNP-12-036, Submittal of Annual Radiological Environmental Operating Report2012-04-25025 April 2012 Submittal of Annual Radiological Environmental Operating Report HNP-12-034, Annual Environmental (Non-Radiological) Operating Report2012-04-25025 April 2012 Annual Environmental (Non-Radiological) Operating Report HNP-12-035, Submittal of Annual Radioactive Effluent Release Report2012-04-16016 April 2012 Submittal of Annual Radioactive Effluent Release Report HNP-11-031, Annual Environmental (Nonradiological) Operating Report2011-04-27027 April 2011 Annual Environmental (Nonradiological) Operating Report ML11123A2592011-04-27027 April 2011 Submittal of Annual Radiological Environmental Operating Report for 2010 HNP-11-032, Annual Radioactive Effluent Release Report for 20102011-04-25025 April 2011 Annual Radioactive Effluent Release Report for 2010 ML1020301712010-07-0707 July 2010 HNP Radiological Environmental Monitoring Analysis Report ML1020301702010-07-0707 July 2010 HNP Radiological Environmental Monitoring Gamma Isotopic Report HNP-10-043, Submittal of Annual Radiological Environmental Operating Report2010-04-27027 April 2010 Submittal of Annual Radiological Environmental Operating Report HNP-10-041, Annual Radioactive Effluent Release Report for 20092010-04-16016 April 2010 Annual Radioactive Effluent Release Report for 2009 HNP-09-038, Annual Environmental (Nonradiological) Operating Report2009-04-29029 April 2009 Annual Environmental (Nonradiological) Operating Report HNP-09-039, Annual Radioactive Effluent Release Report for 20082009-04-26026 April 2009 Annual Radioactive Effluent Release Report for 2008 HNP-08-041, Transmittal of Annual Radiological Environmental Operating Report for 20072008-04-20020 April 2008 Transmittal of Annual Radiological Environmental Operating Report for 2007 ML0729200822007-10-19019 October 2007 Index of References - Shearon Harris SEIS License Renewal HNP-07-105, Response to Requests for Additional Information Regarding the Environmental Review for Shearon Harris Nuclear Power Plant License Renewal Application, Response to RAI No. 1, Item 1 Through Item 72007-08-0808 August 2007 Response to Requests for Additional Information Regarding the Environmental Review for Shearon Harris Nuclear Power Plant License Renewal Application, Response to RAI No. 1, Item 1 Through Item 7 HNP-07-045, Annual Radiological Environmental Operating Report for 20062007-04-18018 April 2007 Annual Radiological Environmental Operating Report for 2006 HNP-07-046, Annual Radioactive Effluent Release Report for 20062007-04-13013 April 2007 Annual Radioactive Effluent Release Report for 2006 HNP-06-094, Groundwater Protection - Data Collection Questionnaire2006-07-27027 July 2006 Groundwater Protection - Data Collection Questionnaire HNP-06-050, Annual Environmental (Non-Radiological) Operating Report for 20052006-04-17017 April 2006 Annual Environmental (Non-Radiological) Operating Report for 2005 ML0520303382005-07-14014 July 2005 NPDES Monthly Report Forms for June 2005 for Perry Nuclear Power Plant HNP-05-041, Transmittal of Annual Environmental (Non-Radiological) Operating Report for 20042005-04-15015 April 2005 Transmittal of Annual Environmental (Non-Radiological) Operating Report for 2004 HNP-05-038, Annual Radioactive Effluent Release Report2005-04-12012 April 2005 Annual Radioactive Effluent Release Report ML0413404512004-05-0707 May 2004 NPDES Monthly Report for April 2004 HNP-04-056, Annual Radiological Environmental Operating Report for 20032004-04-23023 April 2004 Annual Radiological Environmental Operating Report for 2003 HNP-04-051, Annual Radioactive Effluent Release Report2004-04-15015 April 2004 Annual Radioactive Effluent Release Report 2023-04-26
[Table view] Category:Letter type:HNP
MONTHYEARHNP-18-050, Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date2018-09-17017 September 2018 Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme2018-08-13013 August 2018 License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval2018-06-0404 June 2018 Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval HNP-18-049, Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 192018-05-0303 May 2018 Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 19 HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2018-05-0202 May 2018 Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes HNP-18-042, Annual Environmental (Non-radiological) Operating Report2018-04-30030 April 2018 Annual Environmental (Non-radiological) Operating Report HNP-18-032, Annual Radiological Environmental Operating Report2018-04-25025 April 2018 Annual Radiological Environmental Operating Report HNP-18-031, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report HNP-18-047, Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation2018-04-20020 April 2018 Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval2018-04-18018 April 2018 Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval HNP-18-044, Cycle 22 Core Operating Limits Report, Revision O2018-04-16016 April 2018 Cycle 22 Core Operating Limits Report, Revision O HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.22018-02-19019 February 2018 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-02-16016 February 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 12018-02-14014 February 2018 Cycle 21 Core Operating Limits Report, Revision 1 HNP-18-017, CFR 50.54(q) Evaluations2018-02-0505 February 2018 CFR 50.54(q) Evaluations HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors.2018-02-0101 February 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2018-01-22022 January 2018 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-01-18018 January 2018 Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations2018-01-11011 January 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors2018-01-0404 January 2018 Submittal of 14-Day Special Report for Accident Radiation Monitors HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 32017-11-29029 November 2017 Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-11-27027 November 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In..2017-10-30030 October 2017 Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In.. HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-10-30030 October 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan2017-10-23023 October 2017 Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-10-19019 October 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications2017-10-10010 October 2017 License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements.2017-10-0202 October 2017 Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements. HNP-17-073, Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-09-14014 September 2017 Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-09-13013 September 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal HNP-17-061, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-07-20020 July 2017 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-06-28028 June 2017 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection2017-06-0505 June 2017 License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection HNP-17-040, Snubber Program Plan2017-06-0101 June 2017 Snubber Program Plan HNP-17-051, 10 CFR 50.54(q) Evaluation2017-05-24024 May 2017 10 CFR 50.54(q) Evaluation HNP-17-050, Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center2017-05-24024 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete2017-05-22022 May 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du HNP-17-033, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112017-05-22022 May 2017 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 HNP-17-049, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations. HNP-17-047, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-048, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations. HNP-17-046, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-024, Annual Environmental (Nonradiological) Operating Report2017-04-28028 April 2017 Annual Environmental (Nonradiological) Operating Report HNP-17-023, Annual Radioactive Effluent Release Report2017-04-28028 April 2017 Annual Radioactive Effluent Release Report HNP-17-034, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106..2017-04-25025 April 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106.. HNP-17-035, Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator2017-04-12012 April 2017 Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator HNP-17-045, 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation2017-03-30030 March 2017 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation HNP-17-014, Annual Report in Accordance with Technical Specifications, Section 6.9.1.22017-02-16016 February 2017 Annual Report in Accordance with Technical Specifications, Section 6.9.1.2 HNP-17-015, Summary of 10 CFR 50.54(q) Evaluation2017-02-15015 February 2017 Summary of 10 CFR 50.54(q) Evaluation 2018-09-17
[Table view] Category:Annual Operating Report
MONTHYEARRA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.462022-04-27027 April 2022 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-21-0131, Annual Environmental (Non-radiological) Operating Report2021-04-27027 April 2021 Annual Environmental (Non-radiological) Operating Report RA-21-0051, Shearon Harris Nuclear Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, and H. B. Robinson Steam Electric Plant - Annual Report of Changes Pursuant to 10 CFR 50.462021-04-0505 April 2021 Shearon Harris Nuclear Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, and H. B. Robinson Steam Electric Plant - Annual Report of Changes Pursuant to 10 CFR 50.46 RA-20-0126, Annual Report of Changes Pursuant to 10 CFR 50.462020-05-27027 May 2020 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-18-0022, Carolinas, LLC (Duke Energy) - Annual Report of Changes Pursuant to 10 CFR 50.462018-05-24024 May 2018 Carolinas, LLC (Duke Energy) - Annual Report of Changes Pursuant to 10 CFR 50.46 HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.22018-02-19019 February 2018 Annual Report in Accordance with Technical Specification 6.9.1.2 RA-17-0027, Duke Energy Carolinas, LLC - Annual Report of Changes Pursuant to 10 CFR 50.462017-05-25025 May 2017 Duke Energy Carolinas, LLC - Annual Report of Changes Pursuant to 10 CFR 50.46 RA-16-0025, Duke Energy Annual Report of Changes Pursuant to 10 CFR 50.462016-05-31031 May 2016 Duke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 HNP-15-031, Annual Environmental (Nonradiological) Operating Report for 20142015-04-27027 April 2015 Annual Environmental (Nonradiological) Operating Report for 2014 HNP-13-050, Annual Report of Changes Pursuant to 10 CFR 50.46 for May 23, 2012 Through April 23, 20132013-06-0606 June 2013 Annual Report of Changes Pursuant to 10 CFR 50.46 for May 23, 2012 Through April 23, 2013 HNP-13-030, Annual Radiological Environmental Operating Report for 20122013-04-19019 April 2013 Annual Radiological Environmental Operating Report for 2012 HNP-13-039, Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B2013-04-19019 April 2013 Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B HNP-12-035, Submittal of Annual Radioactive Effluent Release Report2012-04-16016 April 2012 Submittal of Annual Radioactive Effluent Release Report HNP-11-046, Emergency Core Cooling System Evaluation Changes Annual Report2011-05-23023 May 2011 Emergency Core Cooling System Evaluation Changes Annual Report ML11123A2592011-04-27027 April 2011 Submittal of Annual Radiological Environmental Operating Report for 2010 HNP-11-031, Annual Environmental (Nonradiological) Operating Report2011-04-27027 April 2011 Annual Environmental (Nonradiological) Operating Report HNP-11-032, Annual Radioactive Effluent Release Report for 20102011-04-25025 April 2011 Annual Radioactive Effluent Release Report for 2010 HNP-11-011, Annual Report in Accordance with Technical Specification 6.9.1.22011-02-0202 February 2011 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-10-043, Submittal of Annual Radiological Environmental Operating Report2010-04-27027 April 2010 Submittal of Annual Radiological Environmental Operating Report HNP-10-041, Annual Radioactive Effluent Release Report for 20092010-04-16016 April 2010 Annual Radioactive Effluent Release Report for 2009 HNP-09-040, Annual Radiological Environmental Operating Report for 20082009-04-28028 April 2009 Annual Radiological Environmental Operating Report for 2008 HNP-09-015, Submittal of 2008 Annual Report in Accordance with Technical Specification 6.9.1.22009-02-0202 February 2009 Submittal of 2008 Annual Report in Accordance with Technical Specification 6.9.1.2 ML0817101312008-06-12012 June 2008 Submittal of Report of Changes Pursuant to CFR 50.59 HNP-07-044, Annual Environmental (Non-Radiological) Operating Report for 20062007-04-24024 April 2007 Annual Environmental (Non-Radiological) Operating Report for 2006 HNP-06-027, Annual Report in Accordance with Technical Specification 6.9.1.22006-02-0202 February 2006 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-05-100, Annual Radiological Environmental Operating Amended Report2005-09-23023 September 2005 Annual Radiological Environmental Operating Amended Report ML0513003802005-05-0909 May 2005 Report of Changes Pursuant to 10 CFR 50.59 for May 18, 2003 - December 31, 2004 HNP-05-041, Transmittal of Annual Environmental (Non-Radiological) Operating Report for 20042005-04-15015 April 2005 Transmittal of Annual Environmental (Non-Radiological) Operating Report for 2004 HNP-05-016, Annual Operating Report - 20042005-02-16016 February 2005 Annual Operating Report - 2004 HNP-04-057, Annual Environmental (Non-Radiological) Operating Report2004-04-23023 April 2004 Annual Environmental (Non-Radiological) Operating Report HNP-04-014, Annual Operating Report - 20032004-02-24024 February 2004 Annual Operating Report - 2003 HNP-03-043, Annual Environmental Operating Report2003-04-22022 April 2003 Annual Environmental Operating Report HNP-03-017, Annual Operating Report - 20022003-02-19019 February 2003 Annual Operating Report - 2002 HNP-02-057, Annual Environmental (Non-Radiological) Operating Report for 20012002-04-23023 April 2002 Annual Environmental (Non-Radiological) Operating Report for 2001 HNP-02-016, Annual Operating Report for 20012002-02-19019 February 2002 Annual Operating Report for 2001 2023-04-26
[Table view] |
Text
PDuke David H. Corlett Supervisor - Licensing/Regulatory Programs rEnergy Harris Nuclear Plant 5413 Shearon Harris Rd New Hill NC 27562-9300 919-362-3137 APR 1 9 2013 Serial: HNP-13-039 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 Shearon Harris Nuclear Power Plant Docket No. 50-400
Subject:
Annual Environmental (Nonradiological) Operating Report Ladies and Gentlemen:
In accordance with Section 5.4.1 of the Environmental Protection Plan issued as Appendix B to the Renewed Operating License (NPF-63) for the Harris Nuclear Plant, Carolina Power & Light Company provides the enclosed Annual Environmental (Nonradiological) Operating Report for 2012.
If you have any questions regarding this information, please contact me at (919) 362-3137.
Sincerely, DHC/mgw
Enclosure:
Annual Environmental (Nonradiological) Operating Report c: Mr. J. D. Austin (NRC Senior Resident Inspector, HNP)
Mr. V. M. McCree (NRC Regional Administrator, Region II)
Ms. A. T. Billoch Col6n (NRC Project Manager, HNP)
Carolina Power & Light Company Shearon Harris Nuclear Power Plant Unit 1 ANNUAL ENVIRONMENTAL (NONRADIOLOGICAL)
OPERATING REPORT January 1, 2012 through December 31, 2012 Renewed Facility Operating License No. NPF-63 Appendix B Docket No. 50-400
1.0 INTRODUCTION
Carolina Power & Light Company received a low-power Facility Operating License (No.
NPF-53) and full-power Facility Operating License (No. NPF-63) for the Shearon Harris Nuclear Power Plant, Unit 1, from the U.S. Nuclear Regulatory Commission (NRC) on October 24, 1986, and January 12, 1987, respectively. The NRC issued a Renewed Facility Operating License (No. NPF-63) on December 17, 2008, extending operations until October 24, 2046. Appendix B (the Environmental Protection Plan (EPP)
[nonradiological]) of the renewed operating license requires submittal of an Annual Environmental (nonradiological) Operating Report to the NRC describing the implementation of the plan during the previous year. The purpose of this document is to fulfill the requirement for the period January 1 through December 31, 2012.
On January 1, 2003, Carolina Power & Light Company adopted the brand name Progress Energy Carolinas, Inc.
On July 2, 2012 Progress Energy merged with Duke Energy to form the largest regulated utility in the United States.
2.0 PLANT CONSISTENCY REQUIREMENTS [EPP Section 3.0]
2.1 Plant Design and Operation There were no changes in plant design or operation and there were no tests or experiments performed which involved a potentially significant unreviewed environmental question during the reporting period.
2.2 Reporting Related to the NPDES Permit As required by National Pollutant Discharge Elimination System (NPDES) permit NC0039586, monitoring data were submitted to the North Carolina Department of Environment and Natural Resources (NCDENR) via monthly discharge monitoring reports'and separate correspondence as warranted.
Harris Nuclear Plant (HNP) submitted an application for renewal of the NPDES Permit to NCDENR on January 26, 2011, and NCDENR received the application on January 27, 2011. HNP submitted a copy of the renewal application to the NRC by letter dated January 31, 2011.
Since the renewal application submittal requirements had been met (i.e.,
submitted at least 180 days prior to expiration), by regulation, HNP continues to operate under the expired NPDES Permit until NCDENR issues the new permit.
I
3.0 UNUSUAL OR IMPORTANT ENVIRONMENTAL EVENTS [EPP Section 4.1]
No occurrence of an unusual environmental event that would indicate or could result in a significant environmental impact causally related to plant operations occurred during the reporting period. No releases or exceedances of permit conditions caused any significant environmental impact. The existence of biofouling organisms (Asiatic clams, Corbicula fluminea) and the presence of troublesome aquatic vegetation (hydrilla, Hydrilla verticillata) in Harris Reservoir are considered important topics worthy of inclusion in this report. No zebra mussels were detected at any location in Harris Lake or the auxiliary reservoir during 2012.
3.1 Aquatic Biological Monitoring A. Inspections for Asiatic clams (Corbiculafluminea) in the Harris Nuclear Plant Emergency Service Water System (e.g., intake structures)
The Emergency Service Water (ESW) intake structure is inspected once every three years in accordance with the engineering evaluation (Engineering Change 49074) of HNP's Generic Letter 89-13 Testing and Inspection Program. Inspections of ESW intake bays occurred during February and May 2012. These inspections indicated a stable Asiatic clam population.
No clogging events of HNP cooling water systems occurred during 2012 as a result of Asiatic clam infestation.
B. Monitoring aquatic vegetation Main Reservoir Hydrilla (Hydrilla verticillata)was found throughout the entire main reservoir during 2012. Biomass of this aquatic vegetation observed in the lower reservoir was relatively less than the biomass observed during 2011. The reduced biomass may be the result of generally lower water levels during the previous winter. Hydrilla and creeping water primrose populations were abundant and filled most of the available habitat at Transect S upstream of the New Hill-Holleman Road causeway. Hydrilla was present in the shallow bay (Transect V) adjacent to the mouth of the main intake canal but the relative abundance was much less than previous years. Hydrilla was only present along the shoreline fringes of the intake canal itself. The abundance of creeping water primrose remained less at Transect V compared to previous years. No new species of aquatic plants were observed in the main reservoir.
2
Auxiliary Reservoir Hydrilla continued to be present in the auxiliary reservoir during 2012, however, in much less abundance than what was observed during 2010.
During late spring 2011, 800 triploid grass carp were restocked as a means of controlling aquatic vegetation. Introduction of the grass carp has successfully reduced the abundance of hydrilla and prevented the spread of hydrilla within the auxiliary reservoir. The heaviest infestations found during 2010 were located in the three arms of the reservoir approaching US Highway 1. The abundance of hydrilla found at these locations during 2012 was reduced to occasional patches with the majority being restricted to a fringe along the shoreline. The addition of grass carp during 2011 has successfully controlled the growth of hydrilla but has not completely eradicated hydrilla in the auxiliary reservoir. Some fragments of American elodea, Elodea canadensis, were found mixed in with the remaining patches of hydrilla.
Also present was bladderwort, Utriculariaspp., southern naiad, Najas spp.,
slender spike rush, Eleochris baldwinii, and some creeping water primrose, Ludwigia spp. Of these species, hydrilla, southern naiad, and bladderwort are of potential concern regarding intake fouling. Neither species were present in large amounts.
No hydrilla, bladderwort, or southern pond weed was observed in the auxiliary intake canal or along the shoreline adjacent to the auxiliary intake canal. The dominant vegetation observed along the auxiliary intake canal was Eleochris baldwinii, a small grass-like submerged plant that poses no operational concern. Creeping water primrose (Ludwigia spp.) was also present but in small amounts.
Because of the potential presence of hydrilla and American elodea root tubers and the natural mortality of grass carp, supplemental stocking of grass carp is being considered for 2013.
No impacts to HNP operations from aquatic vegetation occurred in 2012.
3.2 Combined Construction and Operating License Application Evaluations Progress Energy Carolinas, Inc. continues to perform engineering and natural resource evaluations related to potential future development of two new nuclear power generation units at the HNP site. The NRC is currently reviewing the Combined Construction and Operating License (COL) application submitted by Progress Energy on February 18, 2008.
In 2012 several field studies related to the COL were continued or concluded.
Streams and wetland areas presenting the potential to be used for natural resource mitigation for the proposed project were screened and conceptual plans were developed for several of the opportunities. Conceptual mitigation planning was completed in 2012. In-stream Flow studies, including fish, benthic and mussel surveys, were completed for Buckhorn Creek and a section of the Cape Fear River to evaluate habitats and potential impacts from changes in flow. The results of these studies were used in conjunction with hydrologic modeling to evaluate 3
water withdrawal and release scenarios for the proposed project. The natural resource studies are being coordinated with the Nuclear Regulatory Commission, US Army Corps of Engineers, US Environmental Protection Agency, NC Department of Environment and Natural Resources, US Fish & Wildlife Service, and NC Wildlife Resources Commission.
No significant environmental impacts have been caused or identified by these activities.
3.3 Security Upgrades An Erosion and Sedimentation Control Plan for land clearing at the HNP was submitted and subsequently approved by NCDENR on September 12, 2011, to support security upgrades. These land clearing and construction activities were completed in 2012.
No significant environmental impacts have been caused or identified by these activities.
4.0 ENVIRONMENTAL MONITORING [EPP Section 4.2]
4.1 Aquatic Monitoring [EPP Section 4.2.1 ]
Under the authority of the Clean Water Act, the state of North Carolina renewed the National Pollutant Discharge Elimination System (NPDES) permit (NC0039586) for the HNP on March 1, 2007. The permit includes the Harris Energy & Environmental Center (HE&EC) sewage treatment plant discharge as an outfall (007).
The permit requires that a state-certified laboratory perform the analyses on all non-field parameters analyzed for effluent samples. In accordance with this requirement, the HNP Environmental & Chemistry Laboratory was certified by NCDENR as a Wastewater Laboratory, effective January 1, 2012, and valid through December 31, 2012. In addition, during 2012 Progress Energy contracted with four NCDENR certified private laboratories, Environmental Conservation Laboratories, Inc. (ENCO), Environmental Testing Solutions, Inc. (ETS), GEL Laboratories (GEL), and PACE Analytical Laboratories (PACE), to perform analyses.
4
4.1.1 Effluent Monitoring Routine effluent monitoring was conducted and reported to NCDENR as required by the NPDES permit. The following NPDES permit noncompliances occurred.
August 2012, HNP Cooling Tower Blowdown (Outfall 001) - Severe weather conditions caused the power on the evening of August 19, 2012, to be lost to the chemical feed at the Normal Service Water structure. This event caused a malfunction of zinc chloride feed control. These malfunctions lead to siphoning of zinc chloride product from the bulk tank through the feed system. On the morning of August 2 0 th total zinc samples were taken for both operational and NPDES compliance. The operational sample was analyzed by Harris chemistry lab. Sample results were 1.39 mg/L Zinc. Another sample was pulled at 1540. The second operational sample result was 1.38 mg/L Zinc. The NPDES results were confirmed on the evening of August 21, 2012, by the certified lab. The result was 1.56 mg/L Zinc which exceeded the daily maximum limit of 1.0 mg/L.
The August 22, 2012, follow-up sample zinc analysis confirmed that zinc was back within limits. The result was 0.533 mg/L Zinc.
Progress Energy assertg that this exceedence was caused by an upset condition as defined in the facility's NPDES permit and therefore is not a violation of the facility's NPDES permit. Notification of this upset condition was made to NCDENR on August 22, 2012.
Back pressure regulators have been installed and tested to prevent siphoning of the zinc product in the future upon loss of power events.
August 2012, HNP Combined Outfall (Outfall 006) - The facility failed its quarterly toxicity test that was sampled on August 21, 2012. Upon notification of the failure, an investigation into the chemical characteristics of the toxicity sample was commenced. It does not appear that this failure was related to the upset condition described for Outfall 001. Further, there were no metal concentrations that were high enough to cause toxicity.
Conversations with the toxicity testing laboratory provided no conclusive causes for the tests failure. The facility commenced monthly sampling as required by the NPDES permit.
A visual survey by company personnel of Harris Lake following notification of test failure on August 24, 2012, was also conducted and no environmental impact was observed.
On September 17, 2012, the required monthly toxicity test sample was collected and the results passed.
A Notice of Violation (NOV) was issued by NCDENR on November 1, 2012, for the August 2012 acute toxicity failure. Progress Energy submitted a response to the NCDENR NOV on December 20, 2012, citing the investigation into the test failure and the successful follow-up tests performed in accordance with permit requirements.
5
October 2012, Waste Neutralization Basin (Outfall 006) - On October 16, 2012, plant personnel identified the underground Waste Neutralization Basin Flash Mixer Return Pipe had developed a leak. The pipe carries secondary plant and water treatment building waste water for chemical processing. The leak was estimated to be 15,000 gallons of water containing a low level of tritium (10,760 picocuries per liter) which leaked into the surrounding soil.
Once the leak was discovered, the system was secured and the leak was isolated. The spill was contained within the plant backfill. However, a minimal amount of the treated waste water did migrate to the storm drain catch basins in the area of the leak and was discharged to the Harris Reservoir via NPDES permitted storm water Outfall 006. The normal discharge route for the treated effluent from the waste neutralization basin is NPDES waste water Outfall 006. The piping has been repaired.
In accordance with the NPDES permit, a report was made to NCDENR on October 16, 2012. A follow-up letter was issued to NCDENR on October 18, 2012. This event was also reported to the NRC via Event Notification #48416 on October 17, 2012, based on the voluntary notification to state agencies per NEI 07-07, Industry Groundwater Protection Initiative - Final Guidance Document.
4.1.2 NPDES Inspections
" On March 20, 2012, a North Carolina Wastewater/Groundwater Laboratory Certification Maintenance Inspection for the Harris Nuclear Plant was conducted by NCDENR. No significant issues were identified in the NCDENR Letter dated April 24, 2012.
" On December 14, 2012, an NPDES Compliance Inspection was conducted at Harris Nuclear Plant and Harris Energy & Environmental Center by NCDENR. No issues were identified in the NCDENR Letter dated December 21, 2012.
4.2 Terrestrial Monitoring [EPP Section 4.2.2]
Terrestrial monitoring is not required.
4.3 Noise Monitoring [EPP Section 4.2.3]
Noise monitoring is not required.
5.0 EPP AUDIT [EPP Section 5.1]
An audit conducted by an independent corporate entity was performed to verify the completeness and accuracy of the conditions and activities described in this Annual Environmental Operating Report. The results of the audit are on file and available for inspection.
6
6.0 PLANT REPORTING REQUIREMENTS [EPP Section 5.4]
6.1 EPP Noncompliances There were no EPP noncompliances identified during the reporting period.
NPDES permit noncompliances are discussed in Section 4.1.1 of this report.
6.2 Changes in Station Design and Operation There were no changes in station design or operation and there were no tests or experiments performed which involved a potentially significant unreviewed environmental question during 2012.
6.3 Non-routine Reports There were no non-routine reports submitted in accordance with EPP Section 5.4.2 during 2012.
6.4 Other Reporting Requirements There were no other EPP reportable events during 2012.
7